Loading...
Northlake 635(3)-CS 9807011198 214 304 35?0 10:5B CI:~ OF COPPELL ENGINEERING ~ CITY OF~'DPPELL N0,925 Prepared by., Approved by FUND.' CITY OF COPPELL J.E. NO ...... JOURNAL ENTRY POSTED BY= .,. DATE:'7-1.~ _ DATE: DESCRIPTION ACCOUNT DR. CP. NUMBER ' U 07 13 9S 18:38 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.925 Q02 D ¢ELOPMENT FEE TABL[ Project: Nonhla~e 635 Business Park,, Lot 1, Block I (¢oppdl Busines$Center Date: 6/30/98 RE: Additional 2"Irrigation M~ter TOTAL F~$ DUE Water Impact Fee $3,600.00 (100% due prior to Co~_m_¢iJ Approval) Water Tap Inspection Fee $50.00 (100% due at Iss,,~,,ee of Water MC, er) Water Meter Fee (Domestic) (100% due at Is_,,~n_ee of Water Meter) Water Meter Fee Clrrigation/l:ireline) $195.98 (100% due at Issuance of Water Meter) Wa~er Meter Deposit (Domestic) (100% due at Is?~ace of Water MeteO ~l~igation/Fireline Meter Deposit $30.00 000% due at Iss,,,-¢e of Wagr M~er) _ Wastewater Impact Fee $0.00 !100% due prior to Council At?oval) waStewater Tap Inspection Fee (100% due at ls~-~ of Bu!!O!,~E Permit) Utility Final lnspectiou Fee (100% due at Isg~ne-~ of B. ilding Per~i0 . Park Fee $0.00 (100% due prior to Co-net! Approval) Roadway Impact Fee $0.00 (100% due. prior to Council Approval) Street Light Fee (100% due prior to Acc~gance of Project _ Street Sign Fee (100% due prior to Acc. ep~--ce of Project Construction Inspection Fe~ ,, , ' $3,S7 .gS ~'OTAL ~? 17'9S 10:71 CiTY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.923 Q05 DE =LOPMENT FEE WORKSHE ) PIRi()JECT: DATE; RE: NortM4~e 635 Bs~s~ness Parl~ Lot I, Block I (CoppeE Bu.~nes$ Ce~er Ii) 6/22/98 Add~onal 2" lrHga~on M~er W;~l:er Impact Fee: Domestic Meter(s}: Irrigation Meter(s)' Fireline Meter(s): = ESt. rs inch = 8 ESU's = ESU's = ESU's ToW #: 8 ESU's ~ $450.00 ea. (100% due pdor to Council approval of the final plat) Wa~r-r Tap Inspection Fee: TotaJ #: 1 Connections ¢~ $50.00 ea. (Single famay due p~r to issuance of building permit) (Ail other developme~s due prior to issuance of meter) Water Meter Fee: Total 0: 0 Domestic Meter(s) ~ (Single family due prier to issuance of I~uilding 0em~lt) (AJI other developments due pdor to issuance of meter) lr~[gafiow'FireEae Water Meter Fee: Total #: 1 Irrigation Meter(s) ~ $195,98 Total ~,, -- 0 Additional Iwigatlon Meter(s) ~ Total #: 0 Fireline Meter(s) ~ (100% duo prior to issuance of wate~ meters) l)o,mestic Water Meter Deposit Fee: Total #: 0 Meter(s) ~} $35.00 ea. (100% duo prior to issuance of water meters) IrHption/Fire Meter Deposit Fee: (100% due prior to issuance of water meters) '~/:~stewater Impact Fee: Total Domestic Meters ES 'W,tstewater Tap Inspection Fee: To~ ~- ~0 Co~necti<mS ~ $50.00 ea. (100% due I~lor to issuance of building permit) Utility Final Inspection Fee (All developments): TOt~ #: 0 Lots ~) '(100%'~ue prior to issuance of ~il~ling pe~nit) $3,600.00 $195.g8 o,00 $30.00 $0.00 Page 1 0',' 15 ?8 1~:31 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL UTI. ER GONSTRUCTION INCORPORA'''~rJ Fo~ Worth. TX 76118 ~ NO. 923 [~04 NO. 00481[ 06/30/98 IRRG.M~TER MI 3,875.98 3,875.98 PA*f OF $******3,875*DOIJ~t~RS AND 98 cENTS CI%'Y OF COPPBLL 089296 P.O. BOX 478 COPPELL, TX 75019 DATE A&K~JNT 06/30/98 $*****'3,875.98 ,'OOI, A].$,' ~:l,i,t, ci050Rl,': e06 OI, cio