Northlake 635(3)-CS 971118The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 18, 1997 Tom Kublrnann Lincoln Property Company CSE, Inc. 3300 Lincoln Plaza - 500 N. Akard Dallas, TX 75201-3394 Northlake 635 Business Park Lot 1, Block 1 (Coppell Business Center II) Development Fee Assessment Dear Mr. Kuhlmann: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in thc amount of $136,785.30 and forward to the Finance Depru anent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depastment will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~ Kenneth M. Griffin, P.E. Director of Engineering & Public Works cci Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Northlake 635 Business Park Lot 1, Block 1 (Coppell Business Park II) Date: 11/18/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $21,375.00 $21,375.00 (100% due prior to Council Approval) Water Tap Inspection Fee $400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $783.92 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $7,573.28 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $120.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $140.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $14,400.00 $14,400.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $200.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $200.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $101,010.30 $101,010.30 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $146,202.50 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $136,785.30 DEVELOPMENT FEE WORKSHEET PROJECT: Northlake 635 Business Park Lot 1, Block I (Coppell Business Park II) DATE: 11/18/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 4 - 2 inch 32 1 - 2 inch 8 Fireline Meter(s): ~ <J~- 8 inch 7.5 Total#: 47.5 ESUs~O ~4bO.00ea. (100% due prior to Council approval of the final plat) ESU's ESU's ESU's ESU's Water Tap Inspection Fee: Total #: 8 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 4 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ $195.98 Total #: 0 Additional Irrigation Meter(s) @ Total #: ~Z,~,~ Fireline Meter(s) @ $2,459.10 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 32 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 4 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $21,375.00 $400.00 $783.92 $195.98 $0.00 $7,377.30 $120.00 $140.00 $14,400.00 $200.00 $200.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $101,010.30 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this tune Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Northlake 635 Business Park Lotl, Block 1 (Coppell Business Center 11) 11/18/97 (Building A) ROADWAY IMPACT FEE: The total square footage for Building A is 67,200 As per the attached exhibit provided to the Planning Department, the square footage was calculated as 25% Office and 75% Warehouse to determine the initial assessment. If the Office use increases then a reassessment will be performed to determine the additional Roadway Impact Fee that must be paid prior to a Certificate of Occupancy. Service Area * Category ** Land Use ** Buildi~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** 10 Office General Office Building 16,800 16.8 3.99 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $20,109.60 Service Area * Uategor)' ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** 10 General Li~hi Industrial 50,400 50.4 $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles Per Development Uni0 x (Fee Per Vehicle Mile) = $16,027.20 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Total before 50% credit = $36,136.80 50 % Credit as per approval by City Manager = $18,068.40 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Northlake 635 Business Park Lotl, Block 1 (Copper Business Center II) 11/18/97 (Building B) ROADWAY IMPACT FEE: The total square footage for Building B is 84,000 As per the attached exhibit provided to the Planning Department, the square footage was calculated as 25% Office and 75% Warehouse to determine the initial assessment. If the Office use increases then a reassessment will be performed to determine the additional Roadway Impact Fee that must be paid prior to a Certificate of Occupancy. Service Area * 10 Office Category ** Land Use ** 8uildin$ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** General Office Building 21,000 21 Roadway Impact Fee due = (Developmeat Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $25,137.00 ervice Area * Category ** Land Use ** Building Size (Scl. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** 10 General Lis/at Industrial 63,000 63 $300 Roadway Impact Fee due = (Development Units) x ~Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $20,034.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Total before 50% credit = $45,171.00 50 % Credit as per approval by City Manager = $22,585.50 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Nor~hlake 635 Business Park Lotl, Block 1 (Coppell Business Center II) 11/18/97 (Building C) ROADWAY IMPACT FEE: Service Area * 10 Category ** Industrial Land Use ** Buildin~ Size (Sq. Ft.) Developmem Units ** Veh/cle Miles per Developmetu Unit ** Fee per Vehicle Mile *** General Li~,ht Industrial 170,000 170 $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $54,060.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 50 % Credit as per approval by City Manager = $27,030.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Northlake 635 Business Park Lotl, Block 1 (Coppell Business Center I1) 11/18/97 (Building D) ROADWAY IMPACT FEE: Service Area * Use ** Ft.) Unils ** Miles per Development Unit ** Mile *** 10 Industrial General Light Industrial 209,600 209.6 1.06 $300 Roadway Impact Fee due = (Development Units) x Miles per Development Unit) x (Fee per Vehicle Mile) = $66,652.80 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 50 % Credit as per approval by City Manager = $33,326.40 TABULATIONS: · Slle Area: 33.20 Acrem · Building Area: 530,800 SF · Parking: 822 Sp&c®8 · Coverlge: 36.70% 24' ~ NORTH LAKE BUSINESS CENTER COPPELL. TEXAS ~-ANQSC~APE CONCEPT PLAN BELT LINE ROAD' 0 0 o O'BRIEN o c~ ~' ^SSOC,ATES U o o~ o LJ ~ LP.I o