Loading...
Oakbend Addn-CS 910523 (2) COPPEnn P~LIC ~$ -/ ~TE: May 23, 1991 -/~. ~ ~: Larry Davis, Construction Inspector// MOM: Howard Pafford, Wat~ Ut~!~~ri~endent ~: ~endAddi~~'~'~i~ As you are ~w~w~qities personnel have perfo~ed a final walkthrou~ on the above referenced subdivision and have found that all deficient punchllst items have been corrected. However, as we have previously discussed there is a problem with the way that some of the water service meter setters were installed. This meter setter has been e~ipped with a separate inline dual check and in reviewing the detail for acceptance of this device, I had re~ested that the inline check be connected to the setter with a 3/4" close (all thread) bronze nipple. This would allow the entire length of the device to fit within the meter box. Based on the co~ents from field personnel, longer bronze nipples were used in some of the installations. I have spoken with Derek Earle of Centex and he stated that he would correct this problem by having the nipples changed out (if necessary) at the time the plumber installs the plumbing for each house being built in the subdivision. Therefore, I have asked Mr. Earle to submit a letter stating that this would take place. If you have any questions regarding this matter, please advise. HLP/mp cc: Steven G. Goram, Director of Public Works OAKPUNCH . HLP