Northlake WE P10C-CS 970416April 16, 1997
mO
TO~
FROM .'
RE.'
Larry Davis
Brent Adams, Street Division
Northlake 10C
The following items were still not completed on our walk-thru of
April 15, 1997.
1. Potential pond - clean.
2. Seal curb end of Mallard south side.
3. Channel holds water; headwall needs railing.
4. Form stake in expansion joint.
5. Additional random crack found - curb inlet north side at
west end of Mallard.
6. Suspected spring water seeping from the first two lots on
Mallard north side.
DATE:
TO:
FROM:
RE:
COPP~.I.I. E~/GINEERING
UTI'i'.rTw.~: DIVISION
M',~IORANDUM
April 7, 1997
Larry Davis
Marc Russell, Utilities
Walk thrufor Northlake Woodlands 10C
A walk-~u on the above referenc.sd project wa~ conduc~i on
and the ilems below were tbund to be deficien£.
I. Buttons on Fire Hydr4111;i,
4/4/97
Please ~n.sum ~ these items le~ ~ ~ of and if you ~ve any questions, please
MESSAGE CONFIRMATION
04/21/97 15:36
ID=CITY OF COPPELL
DATE
84/21
S~R-TIME DISTANT STATION ID MODE PAGES
0i'14" g5i50825 CALLING 02
RESULT
OK 0000