Loading...
Northlake WE P10C-CS 970416April 16, 1997 mO TO~ FROM .' RE.' Larry Davis Brent Adams, Street Division Northlake 10C The following items were still not completed on our walk-thru of April 15, 1997. 1. Potential pond - clean. 2. Seal curb end of Mallard south side. 3. Channel holds water; headwall needs railing. 4. Form stake in expansion joint. 5. Additional random crack found - curb inlet north side at west end of Mallard. 6. Suspected spring water seeping from the first two lots on Mallard north side. DATE: TO: FROM: RE: COPP~.I.I. E~/GINEERING UTI'i'.rTw.~: DIVISION M',~IORANDUM April 7, 1997 Larry Davis Marc Russell, Utilities Walk thrufor Northlake Woodlands 10C A walk-~u on the above referenc.sd project wa~ conduc~i on and the ilems below were tbund to be deficien£. I. Buttons on Fire Hydr4111;i, 4/4/97 Please ~n.sum ~ these items le~ ~ ~ of and if you ~ve any questions, please MESSAGE CONFIRMATION 04/21/97 15:36 ID=CITY OF COPPELL DATE 84/21 S~R-TIME DISTANT STATION ID MODE PAGES 0i'14" g5i50825 CALLING 02 RESULT OK 0000