Loading...
Oakbend Addn-CS 910418April TO: COPPELL PUBLIC WORKS MEMORANDUM 18, 1991 FROM: .Larry.~Davis/, Construction In. spector ~ Rey Gonzales, Streets Superintendent%// RE: Thweatt & Coppell Road - Construction Debris from Storm Larry as you know on 4/12/91 this location washed debris and mud onto the street due to heavy rains. At that time the Street Division sent two (2) men to clean up the intersection. The Police Department as well as the Fire Department were on sight to assist with traffic control and clean-up. The following is a breakdown on the cost incurred by the city for this clean up; Street Division Brent Adams Steve Daulton Total Hrs. Req. Hrs/Rate O.T. Hfs/Rate Cost 2 @ 10.554 1.5 @ 15.831 3.5~$44.86 2 @ 8.361 -0- 2~ $16.72 SUBTOTAL $61.58 Police Division 1-Officer Fire Division 1- Captain 1- Driver/Engineer 1- Fireman 4- Rookies Req. Hrs/Rate 1.1 @ 12.847 Req. Hfs/Rate 1.5 @ 8.93 1.5 @ 8.55 1.5 @ 7.08 6 @ 6.73 O.T. Hrs/Rate Total Hrs. Cost -0- 1.1=$14.14 O.T. Hfs/Rate -0- 1.5=$13.40 -0- 1.5=$12.83 -0- 1.5=$10.62 -0- 6 =$40.38 SUBTOTAL ~ $77.23 Equipment I - 480 Tractor @ 8.30 per hr. @ 3.5 Hfs= $29.05 i - 3/4 Ton Truck @ 4.95 per hr. @ 2 Hrs= $ 9.90 SUBTOTAL $38.95 Total out of pocket expense to the city for this incident=, $191.90 This situation was discussed with you via phone conversation on 4/13/91 where you advised that the developer was addressing the problem with hay bales. This was done and on 4/17/91 we received another storm system that again created the situation on this intersection. Two members of the Street Division were contacted by the P.D. at 12:30 a.m. on 4/18/91 to come out and clean this area again. This second occurance took two men at the following cost: Street Division Per Birdsall 2.75 @ $20.03 Brent Adams 1.5 @ 15.83 SUBTOTAL Total Cost $ 55.08 $ 23.75 $ 78.83 Eu~ent 1- 480 Tractor 2- 3/4 Trucks Cost 8.30 @ 2.75 Hrs. $ 22.83 4.95 @ 4.25 Hrs. $ 21.04 SUBTOTAL $ 43.87 TOTAL $122.70 Given the fact that we are in the season of substantial rainfalls, I would like to respectfully request an after hours contact number for the contractor/developer, in case this occurs again these individuals can be contacted to do the clean-up. If you have any questions please call me. RG/dg cc: Steve Goram, Director of Public Works 'THWEATT. RG