Loading...
Northlake Wood-CS 940216The City With A Beautiful Future ']]~ '- =-::::~';~ '-'III/ P.O. Box478 ~.~ /HI:Coppell, Texas 75019 il i!:i!; 1 $ 1994 111/112,4-462-oo22 PU; LIC WORKS I February 16, 1994 Mr. Robert Wright Needham, Wright and Laskey 10290 Monroe Suite 305 Dallas, TX 75529 RE: Northlake Woodlands Block 1, Lots 5 through 10 Development Fee Assessment Dear Mr. Wright: Enclosed is a copy of the City of Coppell development fee assessment list, along with a copy of the development fee calculations for Northlake Woodlands Block 1, Lots 5 through 10. Please provide a check made payable to the City of Coppell in the amount of $14,310.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the engineer's estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer CCi Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project: February 16, 1994 Northlake Woodlands Block 1, Lots 5 through 10 TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,900.00 $3,900.00 (100% due prior to Council Approval) Water Tap Inspection Fee $600.00 4)- (100%due at Issuance of Building Permit) Wastewater Impact Fee (MUD) $2,700.00 $2,700.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $600.00 4}- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $300.00 4}- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $133.50 -0- (100% due at Issuance of Building Permit) Water Meter Fee 0rrigation & Fire) -0- 4)- (100% due at Issuance of Water Meters) Water Meter Deposit $180.00 4)- (100%due at Issuance of Building Permit) Irrigation Meter Deposit 4)- 4)- (100%due at Issuance of Water Meters) Street Sign Fee 4)- 4)- (100%due prior to Acceptance of Project) Street Light Fee * 4}- (100%due prior to Acceptance of Project) Park Fee $7,710.00 $7,710.00 (100% due prior to Council Approval) TOTAL $16,123.50 TOTAL AMOUNT DUE PRIOR TO $14,310.00 COUNCIL APPROVAL Construction Inspection Fee (2% of Project Cost due prior to preconstruction meeting) This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: February 14, 1994 Engineering Department Public Works Staff Development Fees for through 10 Northlake Woodlands Blk 1, Lots 5 The following fees referenced project. Water Impact Fee: 6 5/8" x 3/4" N/A N/A should be assessed and collected on the above Domestic Meter/s = 6 ESU's Irrigation Meter/s = __ ESU's Fireline Meter/s = __ ESU's Total 6 100% due prior to Council approval ESU's ~ $650.00 ea = $3,900.00 of the final plat. Wastewater Impact N/A - Total (MUD) Domestic Meter/s = ESU's @ $225.00 ea = 100% due prior to Council approval ESU's $ of final plat. Wastewater Impact (City) 6 - 5/8" x 3/4" Domestic Meter/s = 6 ESU's Total 6 ESU's @ $450.00 ea = $ 2,700.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 6 Connections @ $100.00 each = $ 600.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee 6 Connections @ $100.00 each = $ 600.00 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (Ail Development) 6 lots @ $50.00/lot = $ 300.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 6 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 133.50 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) N/A - Irrigation Meter/s @ $ ea = $ N/A Fireline Meter/s ~ $ ea = $ 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) 6 Meters @ $30.00 ea = $ 180.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) N/A Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation Meter Deposit N/A Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Development Fees Page 3 Park Fee For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: 6 Residential Lots at $1,285.00 each = $ 7,710.00 Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building Official