Loading...
Oakbend Addn-CS 901030COPPEL~ PUblIC ~ October 30, 1990 Steve Gor7~r of Public Works Larry Da~struction Inspector Oakbend Addition/Construction Plans - Status Report (Tickler 10/25/90) The construction plans for construction of the sanitary sewer and water main installation has been approved on the above referenced project and is currently under construction. The developer, Centex Real Estate Corp., Derek Earle, along with the engineering firm of Nathan D. Maier Consulting Engineers Inc., Mike Daniel, have also submitted construction plans for the installatio~ of the storm drainage system and paving plans. The storm drainage and paving plans have been approved with the following stipulations to be addressed by November 20, 1990= - O~en channel (drainage systems) along lot 52 block A is not approved as part of this plan and therefore, storm sewer line "C" sheet 19/26 is not approved. An enclosed drainage systems is required in the vicinity of lot 52 block A and be approved by the City. The final plat is not approved nor is recognized as part of this plan approval. Provide approved and executed final plat by November 20, 1990. - The drainage easement (50'+-) on lot 52 block A is not approved and not accepted as part of this plan approval. - State Road plans must be approved prior to final acceptance of this project by Public Works Department. - Provide Home Owners Association Agreement by November 8, 1990 for approval by the City. - Provide revised landscaping plans, per coppell Streetscape Plan sealed by registered landscape architect, for approval by the City. - Ail applicable developeent fees must be paid to the City of Coppell by November 20, 1990. The comments regarding the proposed drainage system on lot 52 block A has been forwarded to Ginn, Inc. for review. can b. of furth.r as.i.tanc., pl.... 1.t , '.CO/bd O~EN3. LCD