Loading...
Oakbend Addn-CS 900625Prom: John C. Karlsru~ ' ' Re: Review Comm~f~e._iCin~i-pl~ and E~gi~eering 20' wide drainage and drai. uage and access easements required as follows: A.) 20' drai. nage and access easement between lots 59 and 60, Block A; B.) 20' drainage easement between lots 5]. and b2, Bl. ock A; C.) Offsite drainage easements as shown. 3. Street center line curve radii below minimum 425' are used in curve:~ 18, 21, 22. Variance required if not changed. 4. Development along q'hweatt Road must comply with Streetscape "].oodp] a ] u l)ovc;] olmlOlli 1'{!1 Ill [ I' Ilc~l {! ~llld bl ank.q needed on t'i hal I I,AI I lNG AND I'D IH'iCUI,A'II[IOIL,: Contribution for i ntprovemenk o1' ]/2 of Thweat t Road roqu ired. PAVING PLANS: :I. Details of 6" reinforced concrete transition; location and · 1.c of existing uti I itie.q; and prowisions for permanent e~osion control in thc: q'hwoatt Road R.O.W. must be shown Oil Sheet 2. Curve data [:'or cuvve beg inn incl at: ::;ta. 254-50.10 on Oakbend I)rive is as incorrect shown on Sheet 4/26. I)et~it,.s el 6" t'eilll:oi'iJed (:,t)nc.:F¢:l:¢; t:l'ill/k;J tion; ]ocatioll al~d :; i. zc el cx i :;t: i nq ut:i I ititv,;; and prov.i s ions for peumancnt: erosion contr:'ot. Jn the Thwc,~t:t: Road R.O.W. must be shown on Sheet 5/2(;. 17103 I'lcstml Road ~ NIJitc ]()fl ~ l,ll 11,'4 ~ I)alla',,'lcxa~752,1R ~' Phtme214/24R-,1900 .1. Alley widths are Jnco~'m'ecL]y ~g~own on Sheets 6, 10, 1], 12, ]_3, 11.4, and 15. v/2 ~i. No flume is ali. owed at the west end of Post Oak Drive on ,~heet 7/26. An en~.lo.~ .] storm sewer will be required. Show curb return radii at intersection of alleys and cul-de- sac on Sheet 7/26. Flume is not allowed atz the west end of Beale Lane on Sheet 8/26. "Elbow" curb radit]:: ~}~. the {nterset:tJon of Oakbend Drive and Aut~umnwood Drive ]~; too :;mi~ i [ (,n Sheet 9/26. 40' minimum radius required. Alley "A-]" taunt })e ~evi.,~;c,(i to conform to a normal a].].ey section on st~eet:3 10 ~ncl ]1/36. Storm water runoff wi.].l not be allowed to cross onto the adjacent property. 1.1. Alloy width clJmonc;ion:s diSl)laY incorrect 1./2 width dimension on ali. alley plans. DI~AINAGE PLANS: Drainage area map ha~] be(;n marked to indicate required changes in drainage Line "A" on She(~l% '17/26 ~;how:: I:low Iine to flow ].[ne connection at pipe size ch;~nge I/rom 48" to 30". Crown to Crown connection required. The downstream profile must be extended to show relationship of ex3lst[mg ditch and roadway to proposc~c{ storm :;ewt~r outl~l] . An oFf:;ite channel may be 1required. Indicate pi_po size, Location of special headwall detail and erosion conl~ro], measures a~. hoa(lwall too_ as marked on Sheet 18/26. Sheet 19/26 - Flumes are not allowed for drainage of Post Oak Drive and 13en].e Lane ct]] -de-sacs. Revise plans to incorporate enclosed systems. Concrete encasement of sanitary sewer line crossing beneath Line "F" at Station 2+17~ will be toque, red. Also show rip rap at Line "F" oub f a ]. 1. f;heet 20/2(; - Conr:r:e [~e (mcasement required on sanitary sewer line at ;;tat;ion ] 1721: I,i ne "H" . llyd rau] j.(: ca].cu].ati, ons l:or Line "Il" 21" ab l~.00% must be shown. Also indicate erosion control mei~sures at Line "H" outfal]. AI],R ~ND ,,EWF, R PLANS: A. Sheet 21/25 - Water line valves must be located as marked. Sheets 22 and 23/26 - Concrete encasement of sanitary sewer crossing,.; With I ,~'~' th~n 9' vel?t.ici~l ,-~ - -' .... .,epctratlon as marked. DUI]:: Water and :;ewer Ava:i IF )lily Fee @ $440/unit ~_ ]/2 due prior to City Count L[ conu[cleratJ, og~ 338 ]ohs x $440/1o1: :: ,~( 0,720. Z/2 = $30,360.90 duc now Water Tap Fee @ $100/meter Due prior to issue of building permits 138 lots x $100/lot = $13,800.00 Sewer Connection Fee 0 $100/sewer connection 100% due prior 'to :issue of building permits 138 lets x $100/lot = $13,800.00 I). Cens truct:i on Permit First depo:;i.h @ ~: · ,. O0 ~ $20/]o1: ~'~' :: .,,>0n -J $20 x 138 = $3,260.00 clue now Second depo~;ib in an amount equal bo 1.5% of the estimated construction cost of the it@ms proposed to be dedicated to the City. 'lq]is ;i.s due prior to issuance of a construction perm it. Park Fund @ $150/SF home 138 lots x $150/lot $20 ) ' = ,700.00 IUI!, NOW Street Light Fee @ $292.60 per light for every 200 feet of roadway. This fee is due prior to final acceptance of the subdivision. Review with Coppell Public Works Street Department. Street Sign F'ee as requi red by bh~; Street Department in acc:or¢lance wi.th il bltache,l gui(l(fl ine[;. Due prior to bull.ding pc'l:m i E:: })c~ing i :.;::tlod. O V i ~W W i I:h Ce[)pe] ] Pub] .ic Work:; ,,tro(t l)oparL:mcml:. : For· · questions, regarding comments made by Public Works or Eng neer]ng Department .~tall contact the i-ollowing: Water and Sewer - Water Superintendent, Mr. Howard Pafford, at 214-462-8495. 2. Streets - Streets Supet-inten¢]ent, Mr. Per Birdsall, at 214- 462-8495. - ~uperLntendent, Mr. Richard Diane, at 214-462- 8495. 4 o Engineering John C. Karlsruher, P.E. , ConsllltJ. ng ]~.ng.LneerL; at 2].4-248-4900. Ginn, Inc. Should there be further questions on policy or disputes which may need to be resolved, please contact Mr. Steve Goram, Director of Public Works, at 214-462-8495. cc: Mike Daniel - Nathan D. Ma]er Consulting Engineers Gary Sieb