RE: North Lake Woodlands Phase 10B
Final Acceptance
Dear Sir:
A final inspection of paving and utilities for the referenced project has been confu'med by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Construction Inspector
CC:
Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works
Howard Pafford, Utilities Superintendem
Rey Gonzales, Street Superintendent
Greg Jones, Chief Building Official
Troy Glidewell, Fire Marshal
Mike Boney, Site Concrete
Gary Walker, S&S Utility
file/ldavis/Ofinalac.ltr
102 Meadowcreek Road
Coppell, TX 75019
RE: ~ Lake Woodlands P~~
Fina~
Dear Sir:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Construction Inspector
CC:
Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works
Howard Pafford, Utilities Superintendent
Rey Gonzales, Street Superintendent
Greg Jones, Chief Building Official
Troy Glidewell, Fire Marshal
Mike Boney, Site Concrete
Gary Walker, S&S Utility
file/Idavis/Ofinalac.ltr