Northlake WE P12-CS 900802DATE:
TO:
FROM:
RE:
August 2, 1990 ~
Larry Davis, Construction In/~tor . '~.
H°wa~°rd~erlntendent~
~orthlake~nds E~st Phase 12 -~Final Walkthrough
A final
conducted on
incomplete.
walkthrough of the above
July 31st and the following
referenced project was
items were found to be
1)
2)
Lot #1 - Clean out meter can so that bottom
setter and curb stop can be seen.
Lot #2 - Same as above
of meter
3) Lot #3 - "
4) Lot #4 - "
5) Lot #5 - "
6) Lot %6- "
7) Lot #7-
8) Lot %8 -
9) Lot %9 - "
10) Fire Hydrant valve needs Cast Iron Stack and 2' x 2'
concrete blockout.
11) Paint valve stack lids and cleanout lid - Mainline valve -
Blue / Fire hydrant valve - Red / Cleanout cap - Red
12) Station I ~ 15 - Stub-up inside cleanout needs PVC cap and
also needs cleaning out.
Please insure that each of these items are re-inspected by
Utilities field personnel prior to final acceptance.
If you have any questions regarding this matter, please
advise.
HLP/mp