Northlake WE P12-CS 900802DATE: TO: FROM: RE: August 2, 1990 ~ Larry Davis, Construction In/~tor . '~. H°wa~°rd~erlntendent~ ~orthlake~nds E~st Phase 12 -~Final Walkthrough A final conducted on incomplete. walkthrough of the above July 31st and the following referenced project was items were found to be 1) 2) Lot #1 - Clean out meter can so that bottom setter and curb stop can be seen. Lot #2 - Same as above of meter 3) Lot #3 - " 4) Lot #4 - " 5) Lot #5 - " 6) Lot %6- " 7) Lot #7- 8) Lot %8 - 9) Lot %9 - " 10) Fire Hydrant valve needs Cast Iron Stack and 2' x 2' concrete blockout. 11) Paint valve stack lids and cleanout lid - Mainline valve - Blue / Fire hydrant valve - Red / Cleanout cap - Red 12) Station I ~ 15 - Stub-up inside cleanout needs PVC cap and also needs cleaning out. Please insure that each of these items are re-inspected by Utilities field personnel prior to final acceptance. If you have any questions regarding this matter, please advise. HLP/mp