Loading...
ST9301-CN 941206 -. - - . 0.:< h31NAL ST9J-o I . 1t .~ . . . AGR.EEXEHT FOR PROFESSIOHAL SERVICES This Agreement is made and entered into this 6th day of December , 1921t... , by and between City of Coppell, Texas , (Owner) , and Sverdrup Civil (Sverdrup) . ARrICLE 1. SVERDRDP' S SERVICES Sverdrup shall provide for Owner professional services for Sandy Lake Road Design Services , hereinafter referred to as "Project". These services are identified and described in the Scope of Work (APPENDIX A) attached to and made a part of this Agreement. ARr:tCLB 2 01iBER' S RESPOHSIBILITIES A. Owner.s Representative Owner shall designate in writing a person to act as Owner's Representative with respect to the services to be rendered under this Agreement. Such person shall have complete authority to transmit instructions, receive information, interpret and define Owner's policies and make decisions with respect to Sverdrup's services for the Project. B. Information 1. Owner shall provide in a timely manner all criteria and full information as to Owner's requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expand- ability; furnish copies of all special design and construction standards which Owner will require to be included in the draw- ings and speci(ications; and place at Sverdrup's disposal all available information pertinent to the Project including previ- ous reports and any other data relative to design or construc- tion of the Project; and promptly review and approve Sverdrup'S submittals. 2. Owner agrees to comply with the "Hazard Communi- cation Standard" of the Occupational Safety and Health Adminis- tration. 3. If Owner provides a budget for the Project, it shall include contingencies for bidding, changes in the work during construction and other costs which are the responsibility of Owner. Owner shall, at the request of sverdrup, provide a statement of funds available for the Project and their source. 4. Owner shall furnish to Sverdrup as required for performance of Sverdrup's services (except to the extent provid- ed otherwise in the Scope of Work), data prepared by or services ~~Afi06~ 1 ~ 6/Mfr .. LJ /. fir ill I . I - T , 'If I . . 1 """ of others, including, without limitation, soil borings, probings and subsurface explorations, hydrographic surveys, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretation of all the foregoing; environmental assessment and impact statements; property, boundary, easement, right-of-way, topographic and utility surveys; property descriptions; zoning, deed and other land use restriction; and other special data or consultation; all of which Sverdrup may use and rely upon in performing its services. ~ 's ,. t. W'V6 s. Owner Ghal preV1 e en~1Reer1R~ surveys 0 estaslish referenoe painta far oaRatructieR ta enasle oantrac tar (e) to proceed vith the layaut af the vorlt.' 6. Owner ahall previde such aGeeuntin~, inaepeREiea"t east estimatin~ ana insuranee GeuBselin~ ser\.ieea as may se . re~irea for the rrejeet, SUGh le9a1 ser\-iees as OWner may ~ re'f\1i1'8 .... ayercl..-..p ....y r..........i01l1y r9fiU..st vita "..~.."cl. t.. l..~al ~u. issues pertaining ~o the Project includinq any that may be raised sy Centrae"ter(s), sush auditing E8r\rise as ~lRer may. require to ascertain how or for wha~ purpose any ContraGtor aas' uoes the meReya paia unser the e8nstruetioR e9ntrao~, ana suoh ' inspection aerviceG as Owner may require (except to the extent praviEied otherwise in the Ssope of Work) to ascertain that' Contrastor(s) are somplying ~ith any law, rule, regulation, , ordinance, code or order applicable to their furnishinq and \ performing' the ,..ork. Owner Ehall inGlude in all GOREtlN.stioR' contractE a requirement that averdrup be named either as (1) an> indemnitee uRder Contractor's indemnity obligation or (2) an ' adEiitional iftGllrea unser Contrastor's Ceneral LiaBility InGur anee Peliey. c. Access and Approvals 1. Owner shall arrange for access to and make all provisions for Sverdrup to enter upon public and private proper- ty as required for Sverdrup to perform its services under this Agreement. 2. Owner shall furnish at its cost approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project. D. Coordination 1. If Owner designates a person to represent Owner at the site other than Sverdrup, the duties, responsibilities and limitations of authority of such other person and the effect thereof on the duties and responsibilities of Sverdrup will be set forth in an exhibit that is to be identified, attached to and made a part of this Agreement before such services begin. A 3-4/06-89 2 ~r" 1 l'n I f .. r T , 11' r ~ ,.-., 2. If more than one prime contract is to be awarded for construction, materials, equipment and services for the entire Project, Owner shall designate prior to the start of construction a person or organization to have authority and responsibility for coordinating the activities among the various prime contractors. E. Notice Owner shall give prompt written notice to Sverdrup whenever Owner observes or otherwise becomes aware of any development that affects the scope or timing of Sverdrup's services, or any defect or nonconformance in the work of Sverdrup or any Contrac- tor. ARfiCLE 3 COIIPEIfSATIOR DD PAVIIRI1T owner shall compensate Sverdrup for the performance of the services described in the Scope of Work in accordance with the Terms and Conditions of the attached APPENDIX B. ARr:tCLB 4: TIllE FOR PERFORDHCE A. Commencement Sverdrup shall commence the performance of the services for the Project upon the date of this Agreement and complete the work in accordance with such schedule as may be mutually agreed to by the parties. B. Delav f," 1fU~ '/fII~ If Sverdrup'S services for/;~; Project are delayed for reasons beyond its control, the eempcftsa~ieft provided for elsewhere in this Agreement and the time for performance shall be subject to equitable adjustment. ARTICLE 5 CIDllGES Df THE 1f01U( A. Chanqes Owner reserves the right, without impairing this Agreement, to order changes or alterations in the work to be performed hereunder by Sverdrup. If changes or alterations ordered affect the cost or progress of the work, adjustment shall be made in the time for performance of the work and compensation owing to Sverdrup, as the case may be. A 3-4/06-89 3 ~"T,," 1 I] I i I T T , 1 I l' ~ B. Concealed Conditions Should concealed or unknown conditions be encountered in the performance of the work which present the risk of discharge, dispersal, release or escape of asbestos, any hazardous sub- stance or any hazardous waste, Sverdrup shall promptly suspend its performance of the Work for the protection of the parties and their employees and notify Owner of the conditions encoun- tered. Owner and Sverdrup shall promptly investigate the conditions and, if warranted, equitable and necessary adjust- ments shall be made in the terms and conditions of this Agree- ment. It is agreed, however, that Sverdrup shall have no duty to determine the extstence of asbestos or any other hazardous substance or hazardous waste at the site of the work or to provide response action services even with equitable adjust- ments. ARrICLB 6 SDJIllARI) OP CARE Sverdrup represents that its services shall be performed with the skill and care which would be exercised by comparable qualified design professionals performing similar services at the time and place such services are performed. If the failure to meet these standards results in deficiencies in the design, Sverdrup shall furnish at its own cost and expense, the redesign necessary to correct such deficiencies. If the failure to meet these standards results in damages incurred by owner for the repair, or correction of any part of the Project, Sverdrup shall be liable to Owner for the construction costs associated with such repair or correction except to the extent that such costs constitute an addition of value to the Project; provided, however, that in no event shall such damage for which Sverdrup may be liable under this paragraph or otherwise include any consequential, special, contingent or penal damages. ARr:tCLB 7 IHDEIIRITY A. Sverdrup's Dutv Sverdrup shall indemnify Owner against all claims and suits by third parties for loss of or damage to property, or personal injury, including death, to persons, and from all judgments recovered therefor, and from all expenses for defending such claim or suit, including court costs and attorney's fees, arising out of the negligent acts, errors, or omissions of SveLdrup in connection with Sverdrup's performance of this Agreement. In no event shall Sverdrup have any duty to indemni- fy Owner hereunder against claims arising as a result of Owner's sole or contributing negligence. A 3-4/06-89 4 nl' r I~ I I ,~ T , 11 I !I' I 11]' ,,-.. B. Owner's Dutv Upon and after final completion of the Project, Owner shall indemnify and hold Sverdrup harmless from all claims and suits for damages arising from personal injuries, including death to persons, or to property, and from all judgments recovered ~ therefor, and from all expenses for defending such claim or ~ suit, including court costs and attorney's fees, which result from Owner's negligent use, operation or maintenance of the facilities, equipment or materials acai!fteEi er provided by Sverdrup under this Agreement. ARrICLB 8 DfSURAllCB Without limiting its liability hereunder, Sverdrup shall maintain during the life of this Agreement the following insur- ance and furnish Owner, in duplicate, certificates of insurance as evidence thereof. Such certificates shall provide that cancellation of said insurance shall not be effected without thirty (30) days prior written notice to Owner. The certifi- cates shall plainly designate the name of the project for which the certificate is provided. - (~) Workers' Compensation Insurance, providing coverage in compliance with the laws of the state in which any part of the work is to be performed, and Employer's Liability Coverage in the minimum amount of $~OO,OOO for each occurrence. (2) Commercial General Liability Insurance written on an occurrence basis with the following limits of liability: General Aggregate $4,000,000 Products/Completed Operations Aggregate $2,000,000 Persona~ and Advertising injury $2,000,000 Each occurrence $2,000,000 Fire Damage $25,000 Medical Expense $~,OOO (3) Automobile Liability Insurance. Bodily injury and property damage combined single limit - $~ million each occurrence, $l million aggregate. (4) Architect's and Engineer's Professional Liability Insurance. Bodily injury and property damage combined single limit - $1 million each claim, $5 million aggregate. A 3-4/06-89 5 .." i I] I ' I ,,.. 1 , ] I ! '1 :~ The Commercial General Liability and Architect's and Engineer's Professional Liability Insurance shall include Contractual Liability Coverage for the liability assumed by Sverdrup in Article 7 herein. ARrICLE 9 T.ISl<Il.1.IIATIOlI A. Termination Bv Owner 1. In the event Sverdrup fails to comply with any provisions of this Agreement, or if the progress or quality of the work is unsatisfactory, Owner may serve written notice thereof upon Sverdrup, and if Sverdrup neglects within a period of twenty (20) days thereafter to commence its efforts to correct such failure, Owner may terminate the Agreement upon written notice to Sverdrup. Upon such termination, Sverdrup shall cease its performance of this Agreement and shall deliver to Owner all completed or partially completed satisfactory work and Owner shall pay to Sverdrup the amount due for such satis- factory work. 2. Owner also reserves the right to terminate this Agreement in the event it shall abandon or indefinitely postpone the project. Such termination shall be accomplished by written - notice to that effect delivered to Sverdrup. Upon- receipt of such notice, Sverdrup shall immediately cease work and deliver to Owner all completed or partially completed work. Payment to Sverdrup shall be made for work performed prior to receipt by Sverdrup of such termination notice, together with Sverdrup's costs for closing down its work, and Sverdrup shall have no claim ~or loss of anticipated profits or any additional compen- sation .~., B. Termination By Sverdrup In the event Owner fails to comply with any provisions of this Agreement, or if it fails to timely pay compensation due to Sverdrup, Sverdrup may serve written notice thereof upon Owner, and if Owner fails within a period of twenty (20) days thereafter to correct such failure, Sverdrup may terminate this Agreement upon written notice to Owner. Upon such termination, Sverdrup shall cease its performance of this Agreement and when paid the amount due for such work, shall deliver to owner all completed or partially completed work for the project. ARTICLE 1.0 GENERAL COHSIDERATIOHS A. Use of Documents All documents including Drawings, Specifications, and CADO discs prepared or furnished by Sverdrup pursuant to this Agree- ment are instruments of service with respect to the Project and A 3-4/06-89 6 ,'" 1 11'1 I . I T T , 1[ I r' .~ Sverdrup shall retain an ownership and property interest therein whether or not the Project is completed. Owner may make and retain copies for information and reference in connection with the use and occupancy of the Project by Owner and others; howeverr such materials are not intended or represented to be suitable for reuse by Owner or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by Sverdrup for the specific purpose intended will be at owner's sole risk and without liability or ~'- legal exposure to Sverdrup, aHa O~mer shall iAacmnify and held C harmless Sverdrup from all claims, dama~Qs, losses aRd expenses ineluaift~ attarncys' fees ari5inq gut af er resQl~iR~ ~herefram. Any such verification or adaptatiOn\Will entitle Sverdrup to further compensation at rates to be agreed upon by Owner and Sverdrup. 6q I~ ()rI~"" B. Opinions of Cost Since Sverdrup has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor(s)' methods of determining prices, or over competitive bidding or market conditions, Sverdrup's opinions of probable Total Project Costs and Construction cpst provided for herein are to be made on the basis of Sverdrup's experience and qualifications and represent Sverdrup's best judgment as an experienced and qualified professional, familiar with the construction industry; but Sverdrup cannot and does not guaran- tee that proposals, bids or actual Total Project or Construction Costs will not vary from opinions of probable cost prepared by Sverdrup. If, prior to the bidding or negotiating phase of the Project, Owner wishes greater assurance as to Total Project or Construction Costs, Owner shall employ an independent cost estimator as provided in ARTICLE 2. C. Purchase Order Terms If OWner issues a purchase order for the services provided by this Agreement in accordance with Owner's purchasing proce- dures, the Terms and Conditions printed on such purchase order, and supplements or amendments thereto are superseded by this Agreement, and are not applicable to the work. D. Controllinq Law This Agreement is to be governed by the law of the state where the site of the Proj ect is located. Yel?tl~ /or ;iWtf' ~i?1? WlJ ~ ~II b~ i'J P;J~ CPv~~ ~;<3:7. E. Successors and Assiqns 1. Owner and Sverdrup each is hereby bound and the partners, successors, executors, administrators and legal representatives of Owner and Sverdrup are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said A 3-4/06-89 7 ~p . 1 , , I I . T iT I I . ~ ..!1~ .,. assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. 2. Neither Owner nor Sverdrup shall assign, sublet or transfer any rights under or interest in this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or dis- charge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent Sverdrup from employing such independent professional associates and consultants as Sverdrup may deem appropriate to assist in the performance of services hereunder. 3. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than Owner and Sverdrup, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Owner and Sverdrup and not for the benefit of any other party. F. Arbitration I. All claims, counterclaims, disputes and other matters in question between the parties hereto arising out of or relating to this Agreement or the breach thereof and not exceed- ing the sum of $200,000 will be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association. The arbitrators will not have juriSdiction to consider any claim, counterclaim, or other matter in question where the amount in controversy exceeds the sum of $200,000 or where the damages sought are in the nature of punitive damages. This Agreement to arbitrate and any other agreement or consent to arbitrate will be specifically enforce- able under the prevailing law of any court having jurisdiction. 2. Notice of demand for arbitration must be filed in writing with the other party to this Agreement and with the American Arbitration Association. The demand must be made within a reasonable time after the claim, dispute or other matter in question has arisen. In no event may the Qemand for arbitration be made after the date when institution of legal or equitable proceedings based on such claim, dispute or other matter in question would be barred by the applicable statute of limitations. 3. No arbitration arising out of or related to this Agreement shall include, by joinder, consolidation or other manner, any person not a party to this Agreement except for Sverdrup's Subconsultants who may be joined at Sverdrup's sole election. A 3-4/06-89 8 rT . 1 I 1 I - I . . r ~ 4. The limitations contained in paragraphs 1 and 3 may be waived in whole or in part by the written consent of both parties. 5. The award rendered by the arbitrators will be final, judgment may be entered upon it in any court having jurisdiction thereof, and will not be subject to modification or appeal except to the extent permitted by Sections IO and II of the Federal Arbitration Act (9 U.S.C. Sections 10 and II). 6. Unless otherwise agreed in writing, Sverdrup shall carry on the Work and maintain its progress during any arbitration proceedings, and the OWner shall continue to make payments to Sverdrup in accordance with this Agreement. This Article 10, section F shall survive completion or termination of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of -.the day and year first above written. OWNEl L~ - BY: TQY"\} N\ (Y(O -\: ~ V'\ . TITLE: 'f'r'\l ~ e... SVERDRUP CIVIL BY: /C~~ TITLE: Pres; ~{e,., f- A 3-4/06-89 9 ~ . ,1 , J J . T T 'I' I . . . 1[" l"'" APPENDIX B SVERDRUP' S SDlfDARD COllT.RAC'.r PROVISIOHS '.r~ OF PAYJIRJftI - ImIP SOlI A. For and in consideration of the services rendered by Sverdrup, Owner shall pay Sverdrup a lump sum fee in the amount of $ 39,774.00 . B. Terms of Payment Sverdrup shall submit an invoice for its services at bi-weekly intervals based upon Sverdrup's estimate of the proportion of total services actually completed during the period for which the invoice is applicable. Payment of invoices will be due upon presentation and shall be made by wire transfer into an account designated by Sverdrup. If there are disputed items and/or amounts on any invoice, the balance of": such invoice, after deducting any disputed items, shall be paid in full, and the disputed items and amounts shall be presented to Sverdrup for resolution as soon as such disputed items have been determined by OWner. Payments due but unpaid more than thirty (30) days after presentation of the invoice, excluding any amounts and items disputed by OWner, shall bear interest at one percent (l\) interest per month (or any lesser legal limit applicable) until paid. . . . . . The above provisions are predicated on the work being per- formed in Sverdrup's regularly established offices and may be subject to revision if separate offices are necessary for project purposes. A 3-4/06-89 1 .~P ~ I I i 1 .. . ... .. ~ r ~ APPENDIX "A" SVERDRUP CIVIL, INC. CITY OF COPPELL, TEXAS Sandy Lake Road Design Construction Plans and Specifications SCOPE OF SERVICES The limits of work for improvements to Sandy Lake Road will be from approximately 355 feet west of MacArthur Boulevard to the City of Coppell city limit at the Trinity River. Sverdrup Corporation is presently providing design services to Dallas County Department of Public Works in connection with Sandy Lake Road Project 91-830 to provide final design and construction documents to improve Sandy Lake Road to a four-lane divided facility . 1. TASK 1 - STREET LIGHTING DESIGN SCOPE OF WORK (a) Prepare lighting calculations to determine spacing requirements of poles along Sandy Lake Road. (b) Prepare voltage drop calculations to determine feeder size to supply lighting units. (c) Prepare load calculations to determine the size of service and distribution equipment. (d) Prepare plan drawings showing the locations of all lighting units along Sandy Lake Road. (e) Prepare One Line Diagram showing total connected load and distribution equipment requirements. (f) Prepare miscellaneous details sheet showing lighting unit mounting details, distribution equipment details, and other required element details. (g) Prepare quantities sheet showing total electrical equipment and material required for the street lighting system. DESIGN CRITERIA (a) Street lighting design shall be in compliance with the latest edition of the Illuminating Engineering Society Handbook. (b) Street lights will be manufactured by Kim Standards in accordance with City of Coppell Standards, or approved equal. (c) The electrical design will be in compliance with the latest edition of the National Electrical Code, and all applicable local and State codes. 1 Sverdrup Civil, Inc. City of Coppell " . 1 , I I " T iT ., ; 1f .~ APPENDIX "A" ASSUMPTIONS (a) Design calculations will be based on Street lighting units being installed in the median of Sandy Lake Road. DELlVERABLES (a) Drawings: 1. Symbols, General Notes & One Line Diagram 2. Lighting Plan Sheets 1 through 11 3. Miscellaneous Details Sheet 4. Quantity Sheet (b) Construction Specifications - Special Provisions 2. TASK 2 - SANITARY SEWER DESIGN SCOPE OF WORK (a) Prepare Plan & Profile drawings to show design location of proposed 21" diameter sanitary sewer line from MacArthur Boulevard to the Sandy Lake Road Lift Station. (b) Prepare Partial Site Plan drawing at Sandy Lake Road Lift Station to indicate the sewer line interface/connection requirements at the pump station. (c) Prepare miscellaneous detail sheet for sanitary sewer details and required details for utility adjustments/relocations. (d) Prepare quantity summary sheet showing total material and items required for the sanitary sewer. DESIGN CRITERIA (a) Sanitary sewer design shall conform to the requirements of the City of Coppell Subdivision Ordinance, Appendix C - "Design Criteria and Standards", 1994 edition. (b) Engineering requirements shall be in accordance with 'WPCF Manual of Practice NO.9" as published by the American Society of Civil Engineers and the Water Pollution Control Federation. ASSUMPTIONS (a) Any required ground surveys are not included in this fee proposal. We anticipate utilizing existing "As-Built" drawings of the existing sanitary sewers within the right-af-way and of the lift station and corridor from Sandy Lake Road to the lift station. The actual existence of "As-Builts" for the sanitary system has not been determined. DELlVERABLES (a) Drawings 1. Plan & Profiles drawings for sanitary sewer 2. Partial Site Plan @ Sandy Lake Road Lift Station 2 Sverdrup Civil, Inc. City of Coppell .~P . . :1 I I . 1 iT J c' "" APPENDIX "A" 3. Miscellaneous Details sheet 4. Quantity summary (b) Construction Specifications - Special Provisions 3. T ASK 3 - SIGNALIZATION DESIGN AT MacARTHUR BLVD. AND SANDY LAKE ROAD SCOPE OF WORK (a) Prepare/design signal plan layout and signal phasing diagram (b) Develop signal hardware quantity summary sheet. (c) Provide conduit and cable quantity summary sheet. (d) Prepare Equipment Detail sheet (Le. Signal Heads, Poles, Foundations, Pull Boxes, Mast Arms) (e) Prepare General Notes and Conditions sheet DESIGN CRITERIA (a) All traffic signalization shall be in compliance with the Texas Manual on Uniform Traffic Control Devices for Streets and Highways, Part IV - Signals. (b) Traffic signal design shall be in accordance with the City of Coppell Subdivision Ordinance. ASSUMPTIONS (a) City of Coppell will coordinate with local utility to provide location of power source. (b) Traffic counts to be provided by the City of Coppell for intersection traffic movements DELlVERABLES (a) Signal Plan Layout sheet & Phasing diagram (b) Signal Hardware Quantity Summary sheet (c) Conduit Cable Quantity summary sheet (d) Equipment Detail Sheets (e) General Notes and Conditions Sheet 4. TASK 4 - DESIGN OF SOUTH ALIGNMENT SHIFT OF SANDY LAKE ROAD at MacARTHUR BOULEVARD SCOPE OF WORK The purpose of this task element is to determine both the design and construction cost impacts of a southward shift of the centerline alignment. This shift is contemplated to attempt to mitigate the impacts to property owners due to right-of-way acquisition along the north side. Sverdrup recommends that some preliminary alignments be developed along with the associated roadway cross sections to evaluate cost trade-ofts of an alignment shift. Sverdrup would also analyze roadway functionality due to a shift in alignment. 3 Sverdrup Civil, Inc. City of Coppell ~~ . ,1 I I . 'I iT .. r .~ , APPENDIX "A" The effort associated with this task should be only to develop a reasonable cost estimate of construction costs to provide an alignment shift. Our concern is that encroachment into the existing 80' wide drainage easement may require construction of low retaining walls to maintain the required flow area. Also, encroachment into the drainage easement, or placement of any fill material, may require a hydrologic/hydraulic analysis to determine adequacy of the channel configuration. Sverdrup proposes that a brief Summary Report be prepared to address the feasibility and costs associated with an alignment shift rather than propose a design fee to accomplish the alignment shift. Sverdrup proposes the following to provide City of Coppell with the feasibility of an alignment shift: (a) Prepare preliminary alignment drawings using our current CADD database (b) evaluate impacts to the 80" Drainage Easement along south RMJ. (c) develop rough "working" drawings of MacArthur Blvd.lSandy lake Road intersection. (d) determine traffic impacts due to intersection offset & modifications needed to maintain turn lane storage on MacArthur, median island configuration, radius returns, crosswalk changes. (e) evaluate impacts to existing drainage structures along 80' Drainage Easement. DELlVERABlES (a) Preliminary alignment drawings (b) 'Working" Drawings of MacArthur Blvd.lSandy lake Road intersection depicting revisions required to existing features (median, tum lanes, etc.) (c) Cross-Sections of revised alignment (d) Summary Report addressing impacts including a construction cost estimate and design fee estimate to accomplish the shift. 5. TASK 5 - (OPTIONAL) SCOPE OF WORK (a) Sverdrup Corporation is currently preparing the Sandy lake Road project for Dallas County Department of Public Works utilizing Intergraph Micro-Station. We will provide the City of Coppell the final plans in AutoCadd electronic format is desired. (Approximately 120 files) PROJECT BUDGET We have prepared a proposed project budget, included as Attachment "B". We propose to provide these services on a lump sum basis, in accordance with the Agreement for Professional Services which is attached hereto. We will submit our invoice to the City of Coppell, to the attention of Kenneth Griffin, P. E., at monthly intervals. We are happy to 4 Sverdrup Civil, Inc. City of Coppell .~ . . ;1 I I I . 1 iT . J r , APPENDIX "A" be of assistance to the City of Coppell. If this agreement is acceptable, please acknowledge by signing and returning one copy of this letter for our files. Very truly yours, SVERDRUP CIVIL, INC. CITY OF COPPELL ~~ ~ Title: II /) V 0 If!. Daniel T. Reich, P.E. Date: ..r II IJ. If). /91 S- , Dallas Office Manager c: D.T. Reich, P.E. - Dallas Manager 5 Sverdrup Civil, Inc. City of Coppell .~~ . il i i I I " T " IT I ,1[' ). Sverdrup AlE OPERA TIONS-ST. LOUIS Sverdrup Facilities, Inc. ELECTRICAL SECTION MEMORANDUM DATE: November 10, 1994 TO: Dan Reich Dallas Office FROM: Bill Lewis SUBJECT: County of Dallas, Texas Street Lighting - Sandy Lake Road Final Design - Manhour Estimate Per your telephone request on November 9, 1994 the following is SvF engineering cost for providing construction documents for the above subject. The engineering cost is based on the attached manhour estimate and Scope of Work. Labor Hours Labor Cost Total Cost Electrical (E21) Eng. & Des. 130 24.00 3,120 Administration (Y21) Typing 6 14.00 84 Total Labor Cost 3,204 SRE 42.8% 1,371 Sub-Total 4,575 G & A 92.5 4,232 Subtotal 8,807 Direct Cost - Cad 35 Hrs. x 27 = 945 Duplicating 30 Mail 20 Telephone 30 Subtotal 9,832 Profit (14.6% of Labor) 1,286 Total 11,118 CC: R. Kurth F. D'Sa ..,~ . 11 , I I . 1 [ I I r ~. MANHOUR ESTIMATE-B.ECTRICAL PAGE 10F 3 Q.IENT: COUNTY OF DALLAS TEXAS SHEET 10F 1 DATE: 11-10-94 PROJECT: STREET LIGHTING-MAC ARTHUR TO TRINITY RIVER BRIDGE PROP. NO. 140822 JOB NO. JOB DIVISION: A: FINAL DESIGN D: B: E: C: F: PRB-IMINARY DESIGN MANHOURS JOB DIVlSON A B C D E F TOTAL DESIGN 0 0 0 0 0 0 0 REPORTS 0 0 0 0 0 0 0 COST ESTIMATES 0 0 0 0 0 0 0 MISC. 0 0 0 0 0 0 0 0 0 TOTAL PRBJMINARY 0 0 0 0 0 0 0 FINALDESIGN SPECS-CONSTRUCTION 18 0 0 0 0 0 18 SPECS-EQUIP PACKAGES 0 0 0 0 0 0 0 DESIGN (BASIC CRITERA) 9 0 0 0 0 0 9 DRAVVlNG ~NCL. DVVG DES.) 92.5 0 0 0 0 0 92.5 COST ESTIMATE SUPPORT 0 0 0 0 0 0 0 AS BUL TS 0 0 0 0 0 0 0 SHOP DVVG. REV. (EQUIP PKG) 0 0 0 0 0 0 0 TEaiNICAL BID EVAL 0 0 0 0 0 0 0 O&M MANUALS 0 MISC 7 0 0 0 0 0 7 WENT FEVIEW MEETINGS 0 0 0 0 0 0 0 PROJECT MEETINGS 0 0 0 0 0 0 0 0 TOTAL-FINAL DESIGN 126.5 0 0 0 0 0 126.5 CONSTRUCTION PERIODIC SITE VISIT 0 0 0 0 0 0 0 SHOP DRAWlNG-CONSTR PKGS 0 0 0 0 0 0 0 CONSLL TATlON IN OFFICE 0 0 0 0 0 0 0 aiEa< OUT -START UP 0 0 0 0 0 0 0 0 TOTAL-CONSTRUCTION 0 0 0 0 0 0 0 SECTION SUPERVISION 1 41 01 01 01 01 01 41 TOTAL-PRBJM..FINAL.CONST I 1301 01 01 01 01 01 1301 QUANITIES NO. OF DRAVVlNGS I 141 01 01 01 01 01 141 CONSTRUC. SPECS I 11 01 01 01 01 01 1 1 EQUIP. PKGS SPECS 1 01 01 01 01 01 01 01 DRAW. SIZE 22X34 MANHOURSjORAWlNG ESTIMATED BY: W.WLEVVIS OWG.DES 6.607143 APPROVED. BY: PROJECT 9.306786 ~p . iT II . 1 t r f'. '" FINAL DESIGN WORK SHEET JOB DIVlSON "A" PAGE 20F 3 FINAL DESIGN SHEET 10F 2 a..IENT: COUNTY OF DALLAS TEXAS DATE: 11-10-94 PROJECT STREET LIGHTING PROP NO. 140822 JOB NO. COSTRUCTION SPECIFICATIONS NO OF SPEC ENG DESIGN CHEa<. TOTAL CONSlllUCTlON SPECS - SPECIAL PROVo ~ 16 2 16 CONSTRUCTION SPECS - BID PKG 2 0 CONSTRUCTION SPECS - BID PKG 3 0 CONSTRUCTION SPECS - BID PKG 4 0 TOTAL-CONSTRUCTION SPEClACATION 1 16 0 2 16 EQUIPMENT SPEClACATlONS NO OF SPEC MOTOR CONTROl CENTERS 0 SWlTOiGEAR 0 VARIABLE FREQ. DRIVES 0 TRANSFORMERS 0 UNIT SUBSTATION 0 TOTAL-EQUIPMENT SPECIFICATIONS 0 0 0 0 0 DESlGN(8ASlC CRITERIA) LIGHTING CALCu.ATIONS 3 1 4 LOAD CALCu.ATIONS 2 0.5 2.5 VOlTAGE DROP CALCULATIONS 2 0.5 2.5 COORDINATION CALCUlATIONS 0 FEEDER &BRANCH CIRCUIT CALCu.ATIONS 0 TOTAL-DESIGNlBASIC CRITERIA) 7 0 2 9 TECHNCAl.. BID EVALUATION MOTOR CONTROL CENTERS 0 SWlTOiGEAR 0 VARIABLE FREQ. DRIVES 0 TRANSFORMERS 0 UNIT SUBSTATION 0 TOTAL-TECHNICAl.. BID EVALUATION 0 0 0 0 SHOP DRAWING REVIEW-EQUIP. PAa<.AGES MOTOR CONTROl CENTERS 0 SWlTOiGEAR 0 VARIABLE FREQ. DRIVES 0 TRANSFORMERS 0 UNIT SUBSTATION 0 TOTAL-SHOP DRAWING REVIEW-EQUIP. PAa<AGES 0 0 0 0 COST ESTIMATE SUPPORT I I I I 01 AS BUlL TS I I I I 01 a.IENT REVIEW MEETINGS I I I I 01 PRo.ECT MEETINGS I I I I 01 MISCEL.LANEOUS CORRDINATIONWI1H LOCAl UTILITY FOR SERVICE DROP 1 ;1 :1 : I ~I INCORPORATE REVIEW COMMENTS TOTAL-MISC ~~p . 1 , I I . T T ", f' ') FINAL DESIGN WORK SHEET JOB DIVlSON "A" PAGE 30F 3 FINAL DESIGN SHEET 20F 2 Q.IENT: COUNTY OF DI>J..LAS TEXAS DATE: 11-10-94 PROJECT STREET LIGHTING PROP NO. 140822 CONSTRUCTION DRAWINGS NO OF DWG ENG DESIGN CHEC< TOTAL SYMBOLS AND GEN NOTES & ONE LINE 1 e e 1 17 LIGHTING PLAN SHEET 1 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 2 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 3 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 4 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 5 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 6 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 7 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 8 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 9 1 2 2 0.5 4.5 LIGHTING PLAN SHEET 10 1 2 2 0.5 4.5 LlGHllNG PLAN SHEET 11 1 2 2 0.5 4.5 MISC DETAILS 1 6 6 1 13 QUANllY SI-EET 1 6 6 1 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL THIS SHEET 14 42 42 8.5 92.5 I '. TOTAL CONSTRUSTION DRAWINGS I 141 I 421 421 8.51 92.51 .~ . T I I J " T :r I . . f' " ATTACHMENT "B" Sverdrup Civil, Inc. Dall~~ Offic~ SVERDRUP CIVil, INC. I ! CITY OF COPPEll, TEXAS ! Sandy lake Road Design i I Construction Plans and Specifications Fee Proposal TASK 2 - Sanitary Sewer Design - LABOR SALARY COSTS Personnel Classification Hours Rate Total Plan & Profile Drawings P2 20 $ 16.93 $ 338.60 P3 8 $ 19.14 $ 153.12 Partial Site Plan @ Lift Station P2 24 $ 16.93 $ 406.32 P3 10 $ 19.14 $ 191.40 Miscellaneous Details Sheet P2 20 $ 16.93 $ 338.60 P3 10 $ 19.14 $ 191.40 Quantity Summary P2 16 $ 16.93 $ 270.88 P3 10 $ 19.14 $ 191.40 QAlQC Drawung and Design P5 15 $ 27.36 $ 410.40 TOTALS 133 $ 2,492.12 Hours TASK 3 - Signalization Design - LABOR SALARY COSTS Personnel Classification Hours Rate Total Intersection Signal Plan P5 40 $ 27.36 $ 1,094.40 T5 16 $ 19.09 $ 305.44 Phasing Diagram P5 8 $ 27.36 $ 218.88 T5 4 $ 19.09 $ 76.36 Signal Hardware Quantities P5 16 $ 27.36 $ 437.76 T5 4 $ 19.09 $ 76.36 Cable/Conduit Quantities P5 12 $ 27.36 $ 328.32 T5 4 $ 19.09 $ 76.36 Equipment Detail Sheets P5 12 $ 27.36 $ 328.32 T5 16 $ 19.09 $ 305.44 General Notes P5 4 $ 27.36 $ 109.44 T5 6 $ 19.09 $ 114.54 QAlQC Drawing & Design P5 16 $ 27.36 $ 437.76 T5 20 $ 19.09 $ 381.80 TOTALS 178 $ 4,291.18 Hours Page 1 r~r . I I Ii . I T r i . r .~ ATTACHMENT "B" i Sverdrup Civil, Inc. D::III::I!i; Office SVERDRUP CIVil, INC. I i I I . CITY OF COPPEll, TEXAS I i I Sandy lake Road Design Construction Plans and Specifications I Fee Proposal , i TASK 4 - Study of South Alignment Shift - LABOR SALARY COSTS Personnel Classification Hours Rate Total Preliminary Alignment Drawing P2 24 $ 16.93 $ 406.32 P3 8 $ 19.14 $ 153.12 "Working" Drawings of intersection P2 16 $ 16.93 $ 270.88 P3 8 $ 19.14 $ 153.12 Cross sections of alignment P2 16 $ 16.93 $ 270.88 P3 8 $ 19.14 $ 153.12 Summary Report/Cost Estimate P2 4 $ 16.93 $ 67.72 P3 8 $ 19.14 $ 153.12 P5 12 $ 27.36 $ 328.32 TOTALS 104 $ 1,956.60 Hours TASK 5 - (OPTIONAL) Conversion to AutoCadd from Microstation - LABOR SALARY COSTS Personnel Classification Hours Rate Total Convert approx. 120 files P2 20 $ 16.93 $ 338.60 at 10 min/file LABOR TOTALS. TASKS 1 through 5 TASK 1 (SvFac) $ 11,118.00 Total Labor $ 9,078.50 SRE @ 42.95% of Base $ 3,899.22 TASK 2 $ 2,492.12 OVHD @ 113.25 of Base $ 10,344.95 TASK 3 $ 4,291.18 TASK 4 $ 1,956.60 Total Salary $ 23,322.67 TASK 5 $ 338.60 Profit @ 15% $ 3,498.40 TOTAL (TASK 2 - 5) $ 9,078.50 TASK 1 $ 11,118.00 TOTAL LABOR $ 37,939.07 Page 2 ..... .. 1 I I I T I . r ) ATTACHMENT "B" Sverdrup Civil, Inc. Dallas Office SVERDRUP CIVIL, INC. : ! I i i CITY OF COPPELL, TEXAS I Sandy Lake Road Design Construction Plans and Specifications Fee Proposal i I DIRECT COSTS Hours Rate Total CADD 80 $ 19.50 $ 1,560.00 Duplicating (Engineering Plans) $ 25.00 Microcomputers (20 hours @ $5.00) $ 100.00 Misc. (Telephone, mileage, Report binding) $ 150.00 I Total Direct Costs $ 1,835.00 Total Labor $ 37,939.07 TOTAL ESTIMATED ENGINEERING FEE $ 39,774.07 Page 3 .~P . I , II T T ; r i