Loading...
Conoco-CS 880516~-M(. John C, Karlsruher Gin~', Inc. 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 LIANGI,;It, NICIIOLS, JACKSON, KIItK & DILI.AItD "ormerly Saner, ,lack, Sallinger & Nichols} 5¢)0 N. Akard l)Mlas. Texas 75201 (214) 954-3333 Facsimile (214) 954-3334 May 16, 1988 Re: Coppell-Couoco Agreement Our File No. 212 Dear John: I have reviewed Conoco's letter which was proposed as an agreelnent between the City and Conoco to permit tile City to construct across Conoco's six-inch high pressure petroleum pipeline. Although it is not clearly stated in the proposed agreement received from Conoco, it is my understaading that Conoeo's pipeline will probably have to be lowered and certain City utilities will be iustalled aear the pipeline. I also understand that the work to be done on the pipeline itself will be done by Conoco at the City's expense with tile City utilities being placed in tile area by the City's contractors. It appears tlmt paragraphs 1, 2, 3, 8, and 14 concern the work to be done by Coaoco on their pipeline, and tile remaining p~ragraphs deal with the City's placement of utilities within tile general area of the pipeline by its contractors. The agreement on its face gives the impression that the City is going to be doing all of the work including the lowering and work on the pipeline. I note that Conoco has estimated the cost of work on the pipeline to be $40,000, which will be borne solely by tile City of Coppell, however, in paragraph 3, they have agreed to revise the cost estimates upon receipt of updated drawings. I have no problem with paragraph 10 which is tile City's agreement to indemnify and hold harmless Conoco for damages arising directly or indirectly from work to be performed"by tile City or those vnder contract to tile City near the Con-Dot pipeline. Paragraph ll require~ that the City will have to obtain a similar indemnification agreelnent from its contractors who work on tile project and require the contractor to maintain the liability insurance as provided for in paragraph 13. I have no problem with tile City's indemnification agreement, provided the contractors also are required to so indemnify and maintain tile public liability insurance. Mr. John C. Karlsruher Page 2 May 16. 1988 It is my opinion that the indemnification provision in pargraph 14 of the proposed agreement is quite broad in favor of Conoco in that it provides that the City shall indemnify Conoco against any damage to Denton Tap Road and the City's utility lines arising out of the work being performed by._C~qoco or its contractors on tile Conoco pipeline and states that "This indemnification shall apply to all future work." I think that tile provision eoncerning the indemnification applying to all future work should be eliminated, and Conoco's contractors should be required to carry liability insurance and be responsible for any damage they might cause. I hope this letter can give you some nssistanee in arriving at a final agreement with Conoco. If you have any questions, please give me a call. Very truly yours. SALI,INGEI{, NICIIOLS, JACKSON, KIRK & I)IhI,ARD .~/ Lawrence,//Jackson ~-~ l. WJ/sb ce: Mr. Alan 1). Itatliff City Manager City of Coppell P. O. Box 478 Coppell, Texas 75019 Giml, Inc. File No. 335