Northlake WE P10B-CS 940316COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
/dm
CC:
March 16, 1994
Planning and Community Services
Public Works Staff
Preliminary Plans Comments - Northlake Woodlands East Phase 10B
Additional fees need to recalculated tbr the wight lots added to the final plat Block G9
Lots 10-17.
The developer will be responsible for the installation of traffic control devices to be
consistent with The Texas Manual on Traffic Control Devices at the termination point
of Bethel School Road and Willett Drive.
Cement encase all drop manhoels; i.e., sra. 468.57 line 8.
Engineering Dept.
Central File
PLANS.NLAKEWI0