Loading...
Northlake WE P10B-CS 940228COPPELL PUBLIC WORKS HEHORANDUH DATE: TO: FROH : RE: February 28, 1994 Engineering Department Public Works Staff Development Fees for Northlake Woodlands East 10B The following fees have been revised due the to changes made by Planning and Zoning and should be assessed and collected on the above referenced project. Water Impa~t Fee: 8~ - 5/S" x $/4" mIA - Fireline Meter/s Total 89 ESU's 100% due prior to Council Domestic Meter/s = 89 ESU's Irrigation Meter/s = __ ESU's = ESU's @ $650.00 ea = $ 57,850.00 approval of the final plat. Wastewater Impact (MUD) N/A - Domestic Meter/s = Total ESU's ~ $225.00 ea = $ 100% due prior to Council approval of final plat. ESU's Wastewater Impact (city) 89 - 5/8" x 3/4" Domestic Meter/s = 89 ESU's Total 89 ESU's @ $450.00 ea = $ 40,050.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 89 Connections ~ $100.00 each = $ 8,900.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee 89 Connections @ $100.00 each = $ 8,900.00 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (All Development) 89 lots ~ ~_~ = $ 4,450.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 89 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = 1 9~.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) -~i~~Irrigation Meter/s ~ N/A - Fireline Meter/s ~ $ 100% due prior to issuance of water meter/s. $ ea = $ ea = $ Water Meter Deposit (Residential) 89 Meters @ $30.00 ea = $ 1.980.25 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) N/A Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation MeterDeposit t v ilable Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 89 Residential Lots at $150.00 each = $ 13.350.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Develo~ment Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project~ cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building official Development Fees Page 5 STREET SIGN ASSESSMENT for Northlake Woodlands East lOB The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 18 S1.143.72 Yield $58.56 Stop $65.12 Street Name Sll.60 stop & street Combo $96.85 7 677.95 OTHER N~ Outlet 30" 65.12 2' 130.24 TOTAL $1,951.91 NLWDEAST.iOB Revised 1/14/94