Northlake WE P10B-CS 940228COPPELL PUBLIC WORKS
HEHORANDUH
DATE:
TO:
FROH :
RE:
February 28, 1994
Engineering Department
Public Works Staff
Development Fees for Northlake Woodlands East 10B
The following fees have been revised due the to changes made by
Planning and Zoning and should be assessed and collected on the above
referenced project.
Water Impa~t Fee:
8~ - 5/S" x $/4"
mIA - Fireline Meter/s
Total 89 ESU's
100% due prior to Council
Domestic Meter/s = 89 ESU's
Irrigation Meter/s = __ ESU's
= ESU's
@ $650.00 ea = $ 57,850.00
approval of the final plat.
Wastewater Impact (MUD)
N/A - Domestic Meter/s =
Total ESU's ~ $225.00 ea = $
100% due prior to Council approval of final plat.
ESU's
Wastewater Impact (city)
89 - 5/8" x 3/4" Domestic Meter/s = 89 ESU's
Total 89 ESU's @ $450.00 ea = $ 40,050.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
89 Connections ~ $100.00 each = $ 8,900.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Sewer Tap Inspection Fee
89 Connections @ $100.00 each = $ 8,900.00
100% due prior to issuance of building permit. (Residential only)
Utility Final Inspection Fee (All Development)
89 lots ~ ~_~ = $ 4,450.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
89 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = 1 9~.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
-~i~~Irrigation Meter/s ~
N/A - Fireline Meter/s ~ $
100% due prior to issuance of water meter/s.
$ ea = $
ea = $
Water Meter Deposit (Residential)
89 Meters @ $30.00 ea = $ 1.980.25
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
N/A Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation MeterDeposit
t v ilable Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
89 Residential Lots at $150.00 each = $ 13.350.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Develo~ment Fees
Page 4
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project~
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building official
Development Fees
Page 5
STREET SIGN ASSESSMENT
for Northlake Woodlands East lOB
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 18 S1.143.72
Yield $58.56
Stop $65.12
Street Name Sll.60
stop & street Combo $96.85 7 677.95
OTHER
N~ Outlet 30" 65.12 2' 130.24
TOTAL $1,951.91
NLWDEAST.iOB Revised 1/14/94