Northlake WE P12-AG 890509Rev. 4~24-89
AGENDA REQUEST FORM
ITEM NO.
Consideration of a Final Plat fer No,blake Woodlands East ~lZ,
located on the nerthwest corner of Mockingbi~l Lame amd ~he St, Louis
ltai~oad, (ne~ Beltline Road E~st/West), at the
h Parsons.
STAFF R. EP.: Ru~ell R. Doyle, P.E.
City gng£ueer
OTHE~ REP.: Kevin Pe!ffer! P~E./C,4--
DATE:
The p]...i.g and Zoning Commission considered this item at the April Z0, 1989,
P & Z meeting and ~ecommended apb-oval (4-0) with 2 yin'lances. They ~re:
1. Deletion of am alley fer lots Z, 3, 6, 7, 8 amd 9.
Z. Allow access from Lot 1 onto Mocki-~obh. d Lane.
See staff repert and d~aft minutes (item 10) attached.
BriDGET AMT.: N/A
COMLMENTS:
AMT. ESTIMATED:
AMT.
FIN~CIAL REVIEW
LEGAL REVIEW BY: ~
AGENDA REQ FORM.O588D~" '
Rev. 4-24-89 SUPPORT DOCUHEI~TATION FOR AGEN~ ITEH
STAHP RECEIVED BY CITY ~ ER*S OFFICE:
SUPPORT DOCUHENTATION SUBHITTED WIT~, AGENDA
PlEHOS/LETTERS/REPORTS/BILLS~4INUTES:
NO. OF ORIGINALS P~qUIR~D
1 each
CONTRACT/AGREEMENT ................. :
C.I.P. CONTRACT ..................... :
CHANCE ORDERS ....................... ~
3 originals for signature
6 originals for si~nature
3 origiuals for signature
ORDINANCE ...........................
CAPTION .............................
RESOLUTION ..........................
PROCLAMATION
1 blueback for signature + 3 copies
I blueback for signature + 3 copies
2 bluebacks for signature + 1 copy
2 blueback8 for signature + 1 copy
I each
LOCATION HAPS .......................
ZONING PLANS ........................
PRELIMINARY/FINAL PLATS ............. :
SITE PLANS ..........................
LANDSCAPE PLANS ..................... :
ARCHITECTURAL RENDERINGS ............
12
12
12
12
12
12
DATE PUBLISHED IN THE CITIZENS~ADVOCATE:
Robert Porter
NOTIFICATION TO: Don TiptonEngineers
DATE/I~THOD OF CONTACT:
6330 Beltline Rd.
Garland, TX 75043
NOTES
2ND SH~ETo0588DS
Rev. 4--24-89
AGENDA REQUEST FORM
CITY COOI~CIL NEE'~IN~ Nay 9, 1989
I~l~ NO.
ITEM CAPTION: Consideration of a Final Plat for Northlake woodlands East fl2,
located on the northwest corner of Mockingbird Lane and the St. Louis and
Southwestern Railroad, (near Beltline Road East/West), at the request of
Judy Troth Parsons.
SUBMITTED BY:
(Director' s' Signature)
EVALUATION OF ITEM:
STAFF REP_ .: Russell R. Do~lef P.E.
City Engineer
OTRER RE~.: Kevin Peifferr P.E./Ginn
DATE:
BI, GET AMT.: N/A
COF3(ENTS:
AMT. ESTIMATED:
AMT. +/- BUDGET:
FINANCIAL REVIL~ BY:
LEGAL REVIEW BY',
AGEh~A REQ FORM.O588DS
RIVIll,/ED BY CM:
CITY OF COPPELL
PLANNING & ENGINEERING DEPARTMENT
STAFF REPORT
April 20, 1989
PLANNING DEPARTMENT
RE:
Northlake Woodlands East #12, Final Plat
LOCATION:
Northwest corner of Mockingbird Lane and the St. Louis
and Southwestern Railroad, (near Beltline Road
East/West).
APPLICANT:
HISTORY:
SUMMARY:
Ms. Judy Troth Parsons
Represented by:
Don Tipton Engineers
6330 Beltline Road
Garland, Texas 75043
This project received preliminary plat approval by
the Planning and Zoning Commission on October 20,
1988; and by the City Council on December 13, 1988.
Both approval actions included granting the requested
variances for: (1) Deletion of an alley for Lots 2,
3, 6, 7, 8 and 9, Block F; and (2) Waiver to allow
Lot 1, Block F to front on Mockingbird Lane.
Applicant has met the requirements of the City's
Comprehensive Floodplain Management Ordinance {CFMOI.
As a result, Staff has no objections to the Final Plat
as submitted.
ALTERNATIVES:
ATTAC~4ENTS:
1) Approve the Plat.
2) Deny the Plat.
1) Final Plat
2) Letter from Kimle¥-Horn to
April 1~, 1989.
Russell Doyle, dated
NLWE#12
..T_. I0
Kimley. Horn and Associates, Inc.
12660 Colt Road, Suite 200, Dallas, Texas · (214) 386-7007
Raleigh, Charlotte, Nashville, Virginia Beach, Dallas, Phoenix,
west Palm Beach, Tampa, Orlando, Ft_ Laude~dal~ Veto Beach, Ft, Myer, $tuar~
April 10, 1989
Mr. Russell Doyle, P.E.
City Engdneer
City of/Coppell
Post ~Jffice Box 478
CoplSell, Texas 75019
Re:
Review of Flood Stud3, for Northla[es Woodlands East No. 12
by Don A. Tipton, Inc.
Dear Mr. Doyle:
We have completed our review of the material presented regarding the subject flood study relating
to City Ordinance No. 87390. The report entitled, "Floodplain Hydraulics Study - Grapevine Creek,
Coppell, Texas," demonstrates that the fill proposed for the project meets the conditions of the
ordinance.
It should be mentioned that the property can be altered without increases due to a backwater
condition created by the St. Louis and Southwestern Railroad and by Beltline Road. This fill would
not conform to ordinance requirements if both of these structures were modified to eliminate the
backwater condition.
This review is based on information presented in the subject report and in no way suggests that a
review of any other aspect of the project was completed such as site verification, construction plans,
specifications, surveys, or any other information related to the project.
If we can provide additional information, please let me know.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Ronald W. Morrison, P.E.
Senior Hydrologist
pw
Copy to: Kevin Pfifer, Ginn, Inc.
c:\wp\hydrotgy\#Lk~3odtd.r~a\xt2
Building client relationships since 1967
Kimley-Horn and Associates, Inc.
12660 CoSt Road, Suite 200, Dallas, Texas · (214) 386-7007 -
Raleigh, Charlotte, Nashville, Virginia Beach, Dallas, Phoenix,
West Palm Beach, Tampa, OHando, Ft. Lauded(tale, Veto Beach, Ft_ Mye~ Stuart
April 10, 1989
Mr. Russ¢ Doyle, P.E.
City Engineer
City of//Coppell
Post ~Jffice Box 478
CoptSell, Texas 75019
Re:
Review of Flood Study for Northlakes Woodlands East No. 12
by Don A. Tipton, Inc.
Dear Mr. Doyle:
We have completed our review of the material presented regarding the subject flood study relating
to City Ordinance No. 87390. The report entitled, "Floodplain Hydraulics Study - Grapevine Creek,
Coppell, Texas," demonstrates that the fill proposed for the project meets the conditions of the
ordinance.
It should be mentioned that the property can be altered without increases due to a backwater
condition created by the St. Louis and Southwestern Railroad and by Beltline Road. This fill would
not conform to ordinance requirements if both of these structures were modified to eliminate the
backwater condition.
This review is based on information presented in the subject report and in no way suggests that a
review of any other aspect of the project was completed such as site verification, construction plans,
specifications, surveys, or any other information related to the project.
If we can provide additional information, please let me know.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, 1NC.
Ronald W. Morrison, P.E.
Senior Hydrologist
pw
Copy to: Kevin Pfifer, Ginn, Inc.
c:\~p\hydroLgy\#Lt~dtd.maa\xr2
Building client relationships since lg67
!ilJi.ilit.~ii.I .J~_.-'[:. l ,':':. i:'::"..i ~,:x-
.. :-- , .,: I,I,- I
i :' "', :::it!l
Iii':' ~[lt.!': · ' :::: ! ! i :[,::i.!: I
: [ii iii [Jl::}
Il i hi ~[ i :,:: i - ? :::: ':
I!~!~ ~,l!tl, I! liljl[ilil
· - .il!
Il il:l" l I :.i~ :::i:~
[ .Jill J. i -i'-":
! lJ~ ""':
. ..