Loading...
ST9301-CN 940823CITY COUNCIL MEETING: AGENDA REQUEST FORM August 23, 1994 ITF~ #~ ITEM CAPTION: Approval to authorize Dallas County to proceed with revising the design for Sandy Lake Road from MacArthur Blvd. to the east City Limits to accommodate an on-street Bike Path. PPR 0 V£D BY DATE _ TITL~t-~--nt C~ Man--~ager/eity Engineer STAFF COMMENTS: INITIALS See attached memo. STAFF RECOMMENDATION EXPLANATION: Approval Denial Staff will be available to answer any questions concerning this agenda item. BUDGET AMT.$ FINANCIAL COMMENTS: AMT. EST.$ +/- BUD.- $ FINANCIAL REVIEW:~ Agenda Request Form - Revised 1/94 Current financial need for this project is $250,000 currently allocated for Sandy Lake Road from CIP funds. The remaining amount would be ~~ om the FY 95 General Obligation Bond Sale. CITY MANAGER REVIEW: SUPPORT DOCUMENTATION FOR AGENDA ITEM STAMP RECEIVED BY CITY MANAGER'S OFFICE: SUPPORT DOCUMENTATION SUBMITTED WITH ITEM: MEMOS/LETTERS/REPORTS/BILLS/MINUTE NO. OF ORIGINALS REQUIRED ~lfora totalof 7 pages CONTRACT/AGREEMENT ........... : C.I.P. CONTRACT ................. : CHANGE ORDERS ................. : 3 originals for signature 6 originals for signature 3 originals for signature ORDINANCE CAPTION . RESOLUTION .................... : PROCLAMATION ................. : 1 blueback for signature + 3 copies 1 blueback for signature 2 blueback for signature + 1 copy 2 blueback for signature + 1 BIDS .......................... SUPPORTING DOCUMENTS (narrative) . . . (over 10 pages or 5 double sided in length) LOCATION MAPS .................. ZONING PLANS ................... PRELIMINARY/FINAL PLATS .......... SITE PLANS ...................... LANDSCAPE PLANS ................ ARCHITECTURAL RENDERINGS ........ LENGTHY DOCUMENTS ............ (zoning, subdivision ordinance, master plans) DATE PUBLISHED IN THE CITIZENS' ADVOCATE: (to meet legal requirements prior to consideration by council) NOTIFICATION TO: METHOD OF CONTACT: NOTES 1 each 19 + original 14 14 14 14 14 14 14 Agenda Request Distribution - Revised 1/94 MEMORANDUM To: From: RE: Mayor and City Council Kenneth M. Griffin, P.E., Assistant City Manager/City Engineer ~ Approval to authorize Dallas County to proceed with revising the design for Sandy Lake Road from MacArthur Blvd. to the east City Limits to accommodate an on-street Bike Path. Date: August 15, 1994 In June of 1994, the City contacted Dallas County in regards to the cost to add an additional three foot of paving onto Sandy Lake Road, from 300 foot west of MacArthur to the east City Limits with the project currently under design by Dallas County. On July 26, 1994, the City received a cost estimate from Dallas County showing a cost of approximately $148,548.00 to revise the plans and to construct the additional three foot of paving. As can be seen from the attached letter from the Sverdrup Corporation, the actual breakdown is approximately $121,078.00 for the construction and $24,470.00 for the additional engineering to revise the plans. The final design of this project is currently on hold until such time as the City responds as to whether or not to include the additional three foot of paving and revise the existing plans. If Council approves this change to the plans, I will notify Dallas County to proceed with the redesign of the plans. If this change is made, my estimate of the City's cost in this project is as follows: Right-of-way acquisition Other reimbursables per 2/8/94 letter from the County (copy enclosed) Extra engineering and paving for on-street "Bike Path" Cost to upsize sewer from MacArthur east 1300 feet Cost to upgrade signalization at MacArthur/Sandy Lake $190,000 $125,000 $150,000 $ ']o,ooo $ 70,000 $ 6O5,OOO $ 60,000 10% Contingency ± $ 665,000 In summary, staff is seeking direction on whether to authorize Dallas County to revise the plans to show an additional three foot of paving on Sandy Lake Road. Staff will be available to answer any questions concerning this issue at the Council meeting. C' DALLAS COUNTY PUBLIC WORKS July 26, 1994 Mr. Ken Griffin, P.E. City Engineer\City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 Re: Sandy Lake Road, Project No. 91-830 (Mac Arthur Boulevard to Coppell City Limit) Widening Cost for Bicycle Lane Dear Mr. Griffin: I am writing to you in response to item No. 2 in you letter of June 20, 1994, regarding the adding of bike lanes to this project and the estimated cost of this additional construction. We have just received a response from our consultants, Sverdrup Corporation regarding the cost to widen both sides an additional three feet to accommodate bicycles. The cost to widen the embankment, lengthen culverts, and provided an additional three feet of lime stabilized subgrade and three feet of concrete pavement has been estimated by them to be approximately $121,078.00. In addition there is an estimated additional engineering design cost of $24,470.00 to revise the plans to provide for the bicycle lanes on this project. A copy of our consultants estimate cost increase to add bicycle lanes to this project is provided for your information and files. The City of Coppell will be held fully responsible for this $148,548.00 in additional costs should the City elect to request the adding of bicycle lanes to this project. Since, our consultants are on hold we would appreciate your early response as to whether or not we are to add bicycle lanes to this project. If you have any questions about theft cost estimate, please feel free to contact me at (214) 653-7151. Sincerely, BEJ:slc ~chment: xc: Phil Weston P.E., Sverdrup Corporation 41 1 Elm Street Dallas, Texas 75202 653-7151 C' July 19, 1994 Mr. Bill Jessup, P.E. Dallas County Department of Public Works 411 Elm Street Dallas, Texas 75202 Sverdrup Civil. loc. JUL 2 2 1994 COUNTY DIRECTOR OF. PUBLIC WORKS Subject: Sandy Lake Road - MacArthur Blvd to CoppeU City I.imit Project No. 91-830 Widening for Bicycle Lane Dear Bill, By telephone and by your letter of June 24 to the City of Coppell, you asked that we develop an estimate of the cost to provide a wider pavement section on Sandy Lake Road to allow for a three-foot bike lane. You also requested an estimate of the costs to revise our plan.q to accommodate this change. We have reviewed the work involved and have determined the following. The changes to the construction costs would be the cost of an additional three feet of concrete pavement and lime-treated subgrade, plus additional embankment and culvert extensions. Our preliminary plans and estimate, submitted March 10, included the width of embankment required for the future three-lane section but would require an additional six foot of width. The culvert extensions shown in the preliminary plan-~ also allow for the future six-lane section and therefore would require a additional six feet of length. Our estimate of the additional construction costs is summarized below. Item ~ U~t ~ Price Total 132 Embankment CY 3826 5.00 $19,130. 260 Lime Slurry TON 44 80.00 3,520. 260 Lime Treat Subgrade SY 3232 1.50 4,848. 360 Cone Pav Reinf. (8") SY 3232 23.00 74,336. 430 CIA Conc Culvert CY 20 350.00 7,000. 440 Reinforcing Steel LB 2473 0.50 1,237. + 10% Contingency Estimated Additional Construction Cost = $121,078. Mr. Bill Jessup July 19, 1994 Page 2 The plan changes involved are more complex. The typical sections would be revised to show the wider section. The plan/profile sheets would require changes in plan to show the wider pavement, as well as revisions to the top of curb profiles on both sides. Most drainage areas would be recalculated for the tabulation on the Drainage Area Map. Finally, all the cross-sections would be revised to show the wider section and revised top of curb elevation. We estimate that this would require 295 additional hours to complete. The costs for thi.~ work are summarized as follows. Total Salaries Overheard @ 162.74% Fixed Fee @ 15% ODC: Computer Time = $7,056. -- 11,483. = 2,781. = 3.150. Estimated Additional Design Cost = $24,470. Sverdrup is committed to completing the design plans to the satisfaction of both the County and the City of Coppell. Please review the above information, and let us know how you wish to proceed. Of course, if you have any questions, we would be happy to discuss them. Sincerely, SVERDRUP CIVIL, INC. Phillip G. Weston, P.E. Project Manager PGW/mm DALLAS COUNTY PUBLIC WORKS F~ruaryS, 1994 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 255 Parkway Coppell, Texas 75019 Re: Sandy Lake Road Project 91-830 (MacArthur Boulevard to CoppeH East City Limi0 Funding Summary Dear Mr. Griffin: The following chart is to provide you with some early preliminary estimated cost figures on this project as you requested. The figures are ones which I prepared and are not figures from the Consultant. Sandy Lake Pr~eet 91~30 enat Feet) DESCRIPTION AMOUNT Engineering Services $130,000.0Q Construction $2,550,000.00 (Includes 3 % contingency) Right-of-Way (20 parcels by Coppell) -O- Administration (5 %) $125,000.00 Materials Testing (1%) 25,000.00 TOTAL PROJECT COST $2,830,000.00 City Reimburseables (Traffic items, etc 5%) -$125,000.00 1991 Bond Authorization $3,600,000.00 Project Shortfall -0- City of Coppell Funding Required $125,000.00 411 Elm Street Dallas, Texas 75202 653-7151 Mr. Ken Griffin, P.E. February 8, 1994 Page Two The City of Coppell funding responsibility includes: The cost of the acquisition of all fight-of-way parcels needed for this project. This includes not only the roadway right-of-way needed, but all drainage easements and temporary construction ea.~ernents as well. The cost of all traffic related items such as striping, buttons, pavement advisory markings, signal foundations and traffic conduit. The cost of any irrigation and street lighting conduit, bikg lane pavement, new (not replacemen0 sidewalk construction. The cost of water and sanitary sewer relocation, adjustment or betterment work to be included in our construction plans. 5. The cost of any project funding shortfall which occurs. If you have any questions, please advise. Our current estimated construction award date is November 1995. Sincerely, BF.J:vjm