Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P12-CS 880926
COPPELL PUBLIC WORKS MEMORANDUM September 26, 1988 TO: Taryon Bowman, P & Z Coordinator FROM: Per Birdsall, Streets Foreman~ RE: DRC Sept. 27, 1988 Project: Shadowridge Estates III - Preliminary 1. Alley Return Details specify alley width line. SD-4 2. If this alley is typical how will it drain at Project: Shadowridge Estates III 2 Site Plan 1. Sidewalks - along the f~ontage and have to cross a drainage ditch. 2. Visability triangle should exist at the Project: Creekview Addition No Comment Project: Northlake Woodlands East 12 No Comment PHB/bb cc: Steve Goram, Director of Publ:i~d{works~ at the right-of-way statzon 6+92.57 to the houses which will alley return also.. C©PV