Loading...
ST9301-CN 940815MEMORANDUM To: From: RE: Mayor and City Council Kenneth M. Griffin, P.E., Assistant City Manager/City Engineer ~ Approval to authorize Dallas County to proceed with revising the design for Sandy Lake Road from MacArthur Blvd. to the east City Limits to accormnodate an on-street Bike Path. Date: August 15, 1994 In June of 1994, the City contacted Dallas County in regards to the cost to add an additional three foot of paving onto Sandy Lake Road, from 300 foot west of MacArthur to the east City Limits with the project currently under design by Dallas County. On July 26, 1994, the City received a cost estimate from Dallas County showing a cost of approximately $148,548.00 to revise the plans and to construct the additional three foot of paving. As can be seen from the attached letter from the Sverdrup Corporation, the actual breakdown is approximately $121,078.00 for the construction and $24,470.00 for the additional engineering to revise the plans. The f'mal design of this project is currently on hold until such time as the City responds as to whether or not to include the additional three foot of paving and revise the existing plans. If Council approves this change to the plans, I will notify Dallas County to proceed with the redesign of the plans. If this change is made, my estimate of the City's cost in this project is as follows: Right-of-way acquisition Other reimbursables per 2/8/94 letter from the County (copy enclosed) Extra engineering and paving for on-street "Bike Path" Cost to upsize sewer from MacArthur east 1300 feet Cost to upgrade signalization at MacArthur/Sandy Lake $190,000 $ 125,000 $ 150,000 $ 70,000 $ 70,000 $ 605,000 $ 60,000 10% Contingency + $ 665,000 In summary, staff is seeking direction on whether to authorize Dallas County to revise the plans to show an additional three foot of paving on Sandy Lake Road. Staff will be available to answer any questions concerning this issue at the Council meeting. C DALLAS COUNTY PUBLIC WORKS July 26, 1994 Mr. Ken Griffin, P.E. City Engineer\City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 Re: Sandy Lake Road, Project No. 91-830 (Mac Arthur Boulevard to Coppell City Limit) Widening Cost for Bicycle Lane Dear Mr. Griffin: I am writing to you in response to item No. 2 in you letter of June 20, 1994, regarding the adding of bike lanes to this project and the estimated cost of this additional construction. We have just received a response from our consultants, Sverdrup Corporation regarding the coat to widen both sides an additional three feet to accommodate bicycles. The cost to widen the embankment, lengthen culverts, and provided an additional three feet of lime stabilized subgrade and three feet of concrete pavement has been estimated by them to be approximately $121,078.00. In addition there is an estimated additional engineering design cost of $24,470.00 to revise the plans to provide for the bicycle lanes on this project. A copy of our consultants estimate cost increase to add bicycle lanes to this project is provided for your information and files. The City of Coppeli will be held fully responsible for this $148,548.00 in additional costs should the City elect to request the adding of bicycle lanes to this project. Since, our consultants are on hold we would appreciate your early response as to whether or not we are to add bicycle lanes to this project. If you have any questions about their cost estimate, please feel free to contact me at (214) 653-7151. Sincerely, Pr ' ~ttachment: xc: Phil Weston P.E., Sverdrup Corporation 830:COSTBIKE. LTR 411 Elm Street Dallas, Texas 75202 653-7151 'T · F C Bret, tlr'up July 19, 1994 Mr. Bill Jessup, P.E. Dallas County Department of Public Works 411 Elm Street Dallas, Texas 75202 SverCirup C~vH. Inc - ' - _: _ JUL 2 2 1994 ~OUNTY DIRECTOR OF. P~BUO WORKS Subject: Sandy Lake Road - MacArthur Blvd to Copper City Limit Project No. 91-830 Widening for Bicycle Lane Dear Bill, By telephone and by your letter of June 24 m the City of CoppeR, you asked that we develop an estimate of the cost to provide a wider pavement section on Sandy Lake Road to allow for a three-foot bike lane. You also requested an estimate of the costs to revise our plans to accommodate thL~ change. We have reviewed the work involved and have determined the following. The changes to the comtruction costs would be the cost of an additional three feet of concrete pavement and lime-treated subgrade, plus additional embankment and advert extensions. Our preliminary plans and estimate, submitted March 10, inclu, ded the width of embankment required for the future three-lane section but would require an additional six foot of width. The culvert extensions shown in the preli~innry plans also allow for the future six-lane section and therefore would require a additional six feet of length. Our estimate of the additional construction costs is summarized below. Item U~t ~ Price Total 132 Embankment CY 3826 5.00 $19,130. 260 Lime Slurry TON 44 80.00 3,520. 260 Lime Treat Subgrade SY 3232 1.50 4,848. 360 Conc Pav Reinf. (8") SY 3232 23.00 74,336. 430 CIA Conc Culvert CY 20 350.00 7,000. 440 Reinforcing Steel LB 2473 0.50 1,237. + 10~ Contingency Estimated Additional Construction Cost = $121,078. Mr. Bill Jessup July 19, 1994 Page 2 The plan changes involved are more complex. The typical sections would be revised to show the wider section. The plan/profile sheets would require changes in plan to show the wider pavement, as well as revisions to the top of curb profiles on both sides. Most drainage areas would be recalculated for the tabulation on the Drainage Area Map. Finally, all the cross-sections would be revised to show the wider section and revised top of curb elevation. We estimate that this would require 295 additional hours to complete. The costs for thin work are summarized as follows. Total Salaries Overheard @ 162.74% Fixed Fee @ 15% ODC: Computer Time = $7,056. = 11,483. -- 2,781. = 3.150. Estimated Additional Design Cost = $24,470. Sverdrup ia committed to completing the design plans to the sat_isfaction of both the County and the City of CoppelL Please review the above information, and let us know how you wish to proceed. Of course, if you have any questions, we would be happy to d~_,~ them_ Sincerely, SVERDRUP CIVIL, INC. Project Manager PGW/mm DALLAS COUNTY PUBLIC WORKS F~ruary8,1994 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 255 Parkway Coppell, Texas 75019 Re: Sandy Lake Road Project 91-830 (MacArthur Boulevard to Coppeil East City Limi0 Funding Summary Dear Mr. Griffin: The following chart is to provide you with ~ome early preliminary estimated cost figures on this project as you requested. The figures are ones which I prepared and are not figures from the Consultant. S~idy Lake Pro~ect 91-~30 DESCRIPTION AMOUNT Engineering Services $130,000.00 Construction $2,550,000.00 (Includes 3% contingency) Right-of-Way (20 parcels by Coppell) 43- Administration (5 %) $125,000.00 Materials Testing (1%) 25,000.00 TOTAL PROJECT COST $2,$30,000.00 City Reimburseables (Traffic items, etc 5%) -$125,000.00 1991 Bond Authorization $3,600,000.00 Project Shortfall 43- City of Coppell Funding Required $125,000.00 411 Elm Street Dallas, Texas 75202 653-7151 -T I ' 'F f ..... Mr. Ken Griffin, P.E. February 8, 1994 Page Two The City of Coppell funding responsibility includes: 1. The cost of the acquisition of all right-of-way parcels needed for this project. This includes not only the roadway right-of-way needed, but all drainage easements and temporary construction easements as well. 2. The cost of all traffic related items such as striping, buttons, pavement advisory markings, signal foundations and traffic conduit. 3. The cost of any irrigation and street lighting conduit, bil~ lane pavement, new (not replacement) sidewalk construction. 4. The co~t of water and sanitary ~ewer relocation, adjustment or betterment work to be included in our construction plans. 5. The cost of any project funding shortfall which occurs. If you have any questions, please advise. Our current estimated consuuction award date is November 1995. Sincerely, BEl:vjm