Old Coppell Est-CS 9507113960 Broadway
Suite 125
Garland, Texas 75043
RE: Creek Chase (formerlv known as ?Old ~on~ell Estates"/
Development Fee Assessment
Dear Mr. Blom:
P.O. Box 478
Coppell, Texas 75019
214-462-0022
PUBLIC WORKS
Enclosed is a copy of the City of Coppell Development Fee Assessment list along with a copy of
the Development Fee Calculations for Old Coppell Estates.
Please make payment to the City of Coppell in the mount of $101.330.00 and forward it to Alan
Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's
estimate or contract for this project will need to be provided to our depa~hnent so the constxuction
inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Asst. City Manager/City Engineer
CC;
Alan Johnson, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Howard Pafford, Utilities Superintendent
Rey Gonzales, Street Superintendem
Rick Wieland, Park Development Coordinator
Enclosures
KG/ar
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
July 11, 1995
Creek Chase (formerly known as "Old Coppell Estates"
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $18,450.00 $18,450.00
(100% due prior to Council Approval)
Water Tap Inspection Fee ~ ~$3,400.00
(100% due at Issuance of Water Meter)
Westewater Impact Fee //~ ~$14,400.00 $14,400.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $3,200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) $712.00
(100% due at Issuance of Water Meter)
Water Meter Deposit $960.00
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire)
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit ( $70.00~
(100% due at Issuance of Water Meters)
Street Sign Fee $464.03
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee $41,120.00 $41,120.00
(100% due prior to Council Approval)
Street Excrow $27,360.00 $27,360.00
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $111,931.93 $101,330.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL ENGINEERING
MEMORANDUM
DA.TH
TO:
FROM:
RE:
July 6, 1995
Mike Martin, E.I.T.
Howard Pafford, Utilities Superintendent
Development Fees for Old Coppell Estates
The following fees should be assessed and collected on the above
Domestic Meter/s = __
Irrigation Meter/s = 8
referenced project.
Water Impact Fee:
$~ - $/8" x 3/4"
1 - 5/8" X 3/4"
Total 45
32 ESU's
ESU's
Irrigation Meters = __1 ESU'S
ESU's ~ $450.00 ea = $18,450.00
100% due prior to Council approval of the final plat.
Wastewater Impact
32 - 5/~" x 3/4" Domestic Meter/s = 32 ESU's
Total 32 ESU's ~ $450.00 ea = $14,400,00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
34 Connections @ $100.00 each = $3,400.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
32 Connections @ $100.00 each = $3,200.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (All Development)
32 lots @ $50.00/lot = $1,600.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
32 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 712.00
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 2" Irrigation Meter/s @ $173.65ea = $173.65
1 - 5/8" x 3/4" Irrigation Meter/s @ $22.25ea = $22.25ea.
TOTAL $195.90
100% due prior to issuance of water meter/s.
Water Meter Deposit (Residential)
32 Meters @ $30.00 ea = $960.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
2 Meters ~ $35.00 ea = $70.00
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat. This development lies in Park
Zone 2.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the a~ount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
32 Residential Lots at $1,285.00 each = $41,120.00
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat. This development lies in Park
Zone 2.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Development Fees
Page 4
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 5
STREET SIGN ASSESSMENT
for Old Copmell Estates
The following assessment is being made in accordance with the city of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 2 $127.08
Yield $58.56
Stop $65.12
Street Name $11.60 4 46.40
Stop & Street Combo $96.85 3 290.55
OTHER
Cost breakdowns
request.
TOTAL
may be obtained from
$ 464.03
Public Works by written
DA~;FEES.HLP Revised 1/14/94
ESCROW / ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Creek Chase (Formerly Old Coppell Estates)
7111/95
STREET ESCROW:
Street Name(s) Bethel Road
C2U
Foot $110.00
830.84
Eacrow due = (Cost
$91,392.40
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Residential
l.~nd Us~ **
B.ildin~ Size (Sq. Ft.)
Develop, ment Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) =
Single-Family Detatched
N/A
32
2.85
$300
$27,360.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.