ST9301-CS 951116DALLAS COUNTY PUBLIC WORKS November 16, 1995 Mr. Ken Griffin, P~E. City of Coppell P.O. Box 478 Coppell, Texas 75019 re: Sandy Lake Road Projects Coordination Meeting Dear Mr. Griffin: Attached are the agenda and meeting notes for the Sandy Lake Road Projects from the meeting held November 14, 1995 in the offices of Dallas County Public Works. Please review the attached and advise the undersigned of any comments or revisions. participation and cooperation are greatly appreciated. Irvin S. Griffin, P.E. Project Engin~r, jcn ~ ~chments Your 41 t Elm Street Dallas, Texas 75202 653-7151 Ae % SANDY LAKE ROAD PROJECTS. November 14, 1995 AGENCIES/CONSULTANT COORDINATION CONFERENCE AGENDA & NOTES City_ of Cop_nell Project 91-830: a.lignment: Council did not consider the location from MacArthur to the bridge on 10/24/95, however, the remaining portions were approved. County/Coppell/Consultant representatives are meeting November 16, 1995'in an endeavor to establish schedule for alignment approval, completion of preliminary plans and completion of ROW documents. Right of Way Issues: City of Coppell has now written to the County requesting that the County consider acquiring right of way, at City cost. County will provide an estimate when the preliminary ROW documents are available. Primary concern is the bridge ROW,. now. Dallas County Property Division has commenced with TU Electric and the Farmers Branch ISD. The City is working on acquisition of Harrington and Farrow properties. Jb. Right of Way in Coppell for bridge project; listed in a subsequent category of this agenda. Drainage Issues: Has City of Coppell been provided anything more recent than the submittal dated March 19947 No, Sverdrup has been on hold in regard to the preliminary drainage area map until the' alignment issues are resolved. Horizontal Control: Has Abel been able to verify that the issue (field control) has been resolved? Able Saldana and David Howard agreed that there was no issue or that any issue has been satisfactorily resolved. Written confirmation from Albert Halff & Associates that the field control issue has been established and agreed to is needed. Prelimlmary Plan Submittal: Are we ready to designate a submittal date for preliminary plans.'? No, depends on 1,2,3 above. Construction Estimate: This information ($2.7 M paving and drainage, $342,000 Coppell reimburseables) was provided to Dallas County on 10-5-95, by David Howard (Sverdrup, Dallas). City of Dallas. Bridge Pro_iect 91-838; '~aandy Lake Road Projects November 14, 1995 Agenda and Notes J3. ja. Coppell Right of Way Parcels for bridge project: Harrington Property: After City/County meeting with Mr. Harrington it is apparent that there are more issues than the review of preliminary plans indicated. Ken Griffin is actively working with Mr. Harrington to resolve or mitigate his access problems and business issues. However, ED process is a possibility. At this time, are we able to predict a schedule for acquisition? No, Ken Griffin was given CADD fries at the meeting for the purpose of preparing documents for a meeting with the property owner. However, Ken Griffin will provide the best possible schedule next month after coordination meetings with the property owners to Dallas County. Dallas County Property Division: has begun preliminary work (for bridge project only) prior to obtaining an Interlocal Agreement. Property Division personnel need an Interlocal Agreement before going too far with the process. The County received Ken Griffin's verbal permission to begin preliminary contact with TU Electric and the Carrollton-Farmers Branch School District. Ken Griffin will negotiate with the Harrington and Farrow property owners, not the Dallas County Property Division. Sial Homer to provide a damage estimate for the Harrington tract to Ken Griffin. ROW research has uncovered information that Sandy Lake Road was formerly designated as State Road #40 of the US Hwy 77 System which is indicated on abstract maps as 60' ROW. Farrow tract refers to a 25' ROW and the Harrington tract does not indicate any. Abel V. Saldana is to check with TxDOT for a ROW strip map. Carrollton Right of Way Parcels for bridge project: a. Status/schedule for acquisition of the Nursery parcel; Jill Brim indicates December 15, 1995 is a reasonable date for the City. bo Status/schedule for acquisition of the Stiles parcel; IS December 15, 1995 a reasonable date? Jill M. Brim to contact Tim Tumulty at City of Carrollton to get rough .schedule. Bridge Typical Section. County provided the consultant by letter dated November 13, 1995, a sketch showing the conceptual bridge typical section. (Copies distributed.) The most significant change (from typical shown on preliminary plans) deletes the raised sidewalk. GTE had previously requested provisions be made for including their conduit in the raised sidewalk. Irv will communicate to GTE that they need to request 2 o o >"~andy Lake Road Projects November 14, 1995 Agenda and Notes another method to mount thc conduit to thc bridge. Schematic for66" Trunk Line: County has reviewed schematic of proposed route submitted by consultant for the 66' line from the Carrollton end of the project. Consultant has been advised to design the storm sewer using this route. Plans are 90% complete. Need to make decision on where to put the manhole(s). Lloyd James to propose location. Irv Griffin will check. Charles Gojer's Letter of October 25, 1995. Many of the issues involve those presented in Ken Griffin's requests of October 10, 1995. County has now replied (November 13~ 1995) to the letter. Other than the issues involving the Harrington and the Farrow property, only minor issues (from Ken Griffin's October 10, 1995 letter) remain? Dallas Water Utilities Transmission Line Does the construction or the schedule for construction of an additional 60* water line impact this project in any way? This is an ongoing project and DWU is well into the project. Ken Griffin has allocated funds and is ready to go to condemnation to get necessary easements. Next plan submittal.~ Is December 8, 1995 a good date for submittal of final plan check set? Lloyd James was reluctant to answer this question. He mentioned the Harrington resolution. Alberta Robinson requested that he submit everything else by December 8, 1995. Lloyd James to submit storm sewer plans prior to December 8, 1995. Construction Estimate: An estimate of $4,024,540 has been provided by consultant. A cursory review of the estimate by Dallas County yields a figure of approximately $4,500,000. City reimburseables, known at this time for pavement markings and conduit should not exceed $70,000. Ken Griffin requested a breakout of the $70,000 figure. Carrollton will need to be notified if any funding is to come from Carrollton. Drainage from Coppell: Sverdrup anticipates 30* outfall pipe. Gojer decided to oversize the pipe to 42* as it was going to come in under the abutment. Since there needs to be 10' clearance, it was decided to use two 24' pipes under the roadway. Will need to decide where to put a manhole for connector to the double pipe outfall. Lloyd James is to fax proposal to Irv Griffin. Ken Griffin pointed out that the drainage of 25 acres has not been addressed, nor has the request from the property owner on the south side, west of the bait shop. 3 ~andy I~lce Road Projects November 14, 1995 Agenda and Notes City of ¢oyrollton Park Improvement Project: Park Improvements Plans: a. Preliminary plans have now been provided and reviewed by Dallas County. Does Carrollton or consultant have any follow up to Dallas County's letter of October 20, 1995 letter to Tim Tumulty concerning the County's review? Does Charles Gojer and Associates, Inc. have any written comments? Concerned about the drainage, of the excavation. Except for construction within Sandy Lake ROW, Sehrickel Rollins work was not included in Gojer's plans. Drainage Swale: a. Has Schrickel Rollins been able to study Halff Associates letter of November 1, 1995 and willSchrickel .Rollins be able to modify their design of the swale to be more compatible to the already permitted swale as requested in Halff's letter? Walter Skipwith of Albert Halff and Associates presented an exihibit of the Park improvements contour sheet which depicted the improvements as permitted in red. Halff desired to be more accurate as to roadway design before proceeding with permitting process. Conf'u'mation is needed that the City has received the letter from the County on swale issues in. October. Solutions discussed were to excavate more in the southern loop. Walter Skipwith stated that they will have to show plan to Corps of Engineers(COE) which differs significantly from the development permit. The park improvements have a CDC permit from the COE and a conditional letter of map revision (CLOMR) from FEMA. At the end of construction will have to submit a revised CDC permit application and a letter of Map Revision (LOMR) for approval. Irv Griffin asked if there was a significant difference in storage capacity in the proposed solutions. Halff wants to make revisions before plugging into a new hydraulic model. Schrickel Rollins is to meet with the City of Carrollton to work out revised swale. Walter Sldpwith was concerned to get the 404 permit to COE. He needs more accurate information as to where the roadway will go, where the embankment is, drainage issues concerning the Elm Fork, Denton Creek and any cuts and fill due to impact on the wetlands and any mitigation 'thereof. Halff will work with Kimley-Horn and Sverdrupto put together a revised model. Going to use topo he has for permitting purposes. What is the possibmty of phasing the permitting process for each project to expedite the approval process for the bridge section? 4 §andy Lake Road Projects November 14, 1995 Agenda and Notes D. City. of Carrollton Pro_iect 91-839: Right of Way Acquisition; Dallas County will provide estimate for acquisition of ROW when the preliminary ROW documents are available, approximately March 1996. Drainage information: a. Has City of Carrollton been able to consider and respond to the drainage issues contained in County letter dated' November 3, 1995.9 There is a question as to drainage outfail toward IH 35 and how many structures from Ht 35 will pass under the roadway. Also, it was discussed that work progressing on SH 190 wffi affect the storm water under IH 35 to the west of the project. b. Proposed schedule for submitting drainage design information: Preliminary Paving and Drainage Plans: Proposed date for next plan submittal is when? o Construction Estimate: This information, .$3.7 million for the paving and drainage project was provided Dallas COunty on October 10, 1995 by Kimley Horn. ConstructiOn Estimate was reduced from $4.7 million as Dallas County has more than enough dirt for all the projects from other sources. Walter Skipwith-indicated that there would be over 300,000 cubic yards excavated from the swale area. TxDot instruct.ed Dallas County to avoid any work at the IH 35 intersection. E. Road and Bridge District #1 Topics: Plan review of Park Improvements: Does Mike Sharp have any additional comments (not contained in October 20, 1995 letter to Tim Tumulty) to the Park Improvement Plans? Mike Sharp stated that he has received no feedback from Carrollton. He also needs the quantifies for the swale. Additional comments by Alberta Blair-Robinson: Gojer to provide next submittal by December 8, 1995. Carrollton to resolve issues and update Commissioner Jackson by the first of December. Need to look at scheduling with a goal of final plan completion by the end of December. Concentrate on the schedule and then determine what we need to do to meet the schedule. A copy of the Meeting Sign-In Sheet with the attendees phone numbers is attached. file:Irv:AGENDA6.838 5 iI- PROJECT N~u~IE COMPANY I m_v ¢,~zFn.../¢ v~F, Ce--.~ LA I-/gE PHONE NUMBER -/70 - !~ November 14, $?9 ,ol AGENDA & NOTES City of Coppell Project 91-830: 1. Alignment: a. Council did not consider this on 10/24/95. County/Coppell/Consultant representatives are meeting November 16, 1995 in an endeavor to establish schedule for alignment approval, completion of preliminary plans and'completion of R-O-W documents. Right of Way Issues: City of Coppell has now written to the County requesting that the County consider acquiring right of way, at City cost. Proposed schedule for County reply is? Right of Way in Coppell for bridge project; listed in a subsequent category of this agenda. Drainage Issues: Has City of Coppell been provided anything more recent than the submittal dated March 19947 Horizontal Control: Has Abel been able to verify that the issue (field control) has been resolved. Preliminer~ Plan Submittal: Are we ready to designate a submittal date for preliminary plans? Construotion ~timate: This information ($2.7 M paving and drainage, $342,000 Coppell reimburseables) was provided to Dallas County on 10-5-95, by David Howard (Sverdrup, Dallas). B. City of Dallas. Bridge Project 91-838: 1. _ /CoPpell Right of Way Parcels for bridge project: Harrington Property: After City/County meeting with Mr. Harrington it is apparent that. there are more issues than review of preliminary plans indicated· Ken Griffin is actively working with Mr. Harrington to resolve or mitigate his access and business issues. However, ED process is a possibility. At this time, are we able to prodiot a sohedule for · oquisitlon? ~ ~_.~] ) I. Page 1' I ~ / b. D~as County Property D_?~sion: has begun pi l_iminary work (for bridge p. ~ject only) prior to obtaining an Interlocal Agreement. Property ~ Division personnel need an Interlocal Agreement ~ before going too far with the process. Question; is / it proper and appropriate for the County to ask Ken Griffin's permission to begin preliminary contact with TU and the School District~ f~, Carrollton Right of. Way Parcels for bridge project: a. Status/schedule for acquisition of the Nursery parcel; Is December 15, 1995 a reasonable date? b. Status/schedule for acquisition of the Stiles parcel; Is December 15, 1995 a reasonable date? Bridge Typical Section, 1D County will provide the consultant by dated November 13, 1995 a sketch showing the de~ bridge typical section. The most significant change (from typical shown on preliminary plans) deletes the raised sidewalk. GTE had previously requested' provisions be made· for including their conduit in the raised sidewalk. Irv will communicate to GTE that they need to request another method to mount the conduit to the bridge. 4. Schematic for 66~ TrunkLine: County has reviewed schematic of proposed route submitted by consultant for the 66" line from the Carrollton end of the project. Consultant has been advised to design the storm sewer using this route. 5. Charles GoJer's Letter of October 25, 1995. Many of the issues involve those presented in Ken Griffin's requests of October 10, 1995. County has now replied (November 13, 1995) to the letter. Other than~ the issues involving the Harrington and possibly the Farrow property, are there any issues (from Ken Griffin's October 10, 1995 letter) not resolved? ® Dallas Water Utilities Transmission Line Does the construction or the schedule for construction of an additional 60" water line impact this project in any way? N~x~ plan sul ittal: Is December 8, 1995 a good date for submittal of final plan check set? Construction Estimate: An estimate of $4,024,540 has been provided by consultant. A cursory review of the estimate by Da~]~ County yields a figure of approximately $4,500,000.(~it~ reimburseables, known at this time for pavement mark~ and conduit should not exceed $70,000. ~..,/ ,~ ' Page 2' ' ~e\' City of Carr~ltoni. Park Improvement_ Pro.~,~; 1. Park Improvements Plans: Preliminary plans have now been provided and reviewed by Dallas County. Does Carrollton or consultant have any follow up to Dallas County's letter of October 20, 1995 letter to Tim TumultY concerning the County's review? be Does Charles Gojer and Associates, Inc. have any written comments? 2. Drainage Swale: ae Has Schrickel Rollins been able to study Halff Associates letter of November 1, 1995 and will Schrickel Rollins be able to modify their design of the swale to be more compatible to the already permitted swale as requested in Halff's letter? City of Carrollton Pro%ect 91-$39; 1. Right of Way Acquisition; County has now replied to City requests for Dallas County to consider acquisition (at city cost)? b. Is March 1996 the schedule for preliminary ROW documents? 2. Draina~ information: Has City of Carrollton been able to consider and respond to the drainage issues contained in County letter dated November 3, 19957 be Proposed schedule for submitting drainage design information: 3. Preliainary Pavin~ and Drainage Plans: Proposed date for next plan submittal is when? 4. ConstructionEstimate: This information, $3.7 million for the paving and drainage project was provided Dallas County on October 10, 1995 by Kimley Horn. Road and Bridae District #1 Topics: 1. Plan review of Park Improvements: Does Mike Sharp have any additional comments (not contained in October 20, 1995 letter to Tim 2~.lmulty) to the Park Improvement Plans? fAXo: X~ : AGE3IDA6 .838 Page 3