Park Meadow-CS 861014GINN, INC.
October 14, 1986
CONSULTING ENGINEERS
Mr. Tom Wise
Wiseco Land Development, Inc.
12770 Colt Road, %1215
Dallas, TX 75241
Re: Park Meadows Phase II - Final Acceptance
Dear Mr. Wise:
A final inspection of the above referenced project has been
confirmed by representatives of Ginn, Inc., M.U.D. %1, and the
City of Coppe11.
Paving and utilities have been verified and are in compliance
with the City of Coppell standard requirements. Commitments to
the landscape-streetscape ordinances need to be addressed within
the phase of home building.
The one-year maintenance bonds and as-built drawings have been
received from both contractors. Maturity on the bonds will be
one year from the date of this letter (10-14-86). On behalf of
the City of Coppell, acknowledgement of acceptance and the
release of building permits is effective as of this date.
Sincerely,
Randy F1 e~mi~
/ss
cc: Ed Powell
Steve Goram
Steve Morton
Dale Jackson
Carl Bass
Per Birdsall/
Jeff Hawkins
Wayne Ginn
Gabe Favre
16135 Preston Road · Suite 106 · Dall~s, T~ 75248 · Phone 214/386-6611
Pavina Contractor~
Austin Paving Co.
P.O. Box 1590
Dallas, TX 75221
630-5100
Mr. Weldon Crank
Utility Contractor~
American Developers & Contractors, Inc.
2521 East Main
Grand Prairie, TX 75050
1-2~4-263-8884
R. C. 'Rick' Ivy