Loading...
Park Meadow-CS 861014GINN, INC. October 14, 1986 CONSULTING ENGINEERS Mr. Tom Wise Wiseco Land Development, Inc. 12770 Colt Road, %1215 Dallas, TX 75241 Re: Park Meadows Phase II - Final Acceptance Dear Mr. Wise: A final inspection of the above referenced project has been confirmed by representatives of Ginn, Inc., M.U.D. %1, and the City of Coppe11. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. Commitments to the landscape-streetscape ordinances need to be addressed within the phase of home building. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (10-14-86). On behalf of the City of Coppell, acknowledgement of acceptance and the release of building permits is effective as of this date. Sincerely, Randy F1 e~mi~ /ss cc: Ed Powell Steve Goram Steve Morton Dale Jackson Carl Bass Per Birdsall/ Jeff Hawkins Wayne Ginn Gabe Favre 16135 Preston Road · Suite 106 · Dall~s, T~ 75248 · Phone 214/386-6611 Pavina Contractor~ Austin Paving Co. P.O. Box 1590 Dallas, TX 75221 630-5100 Mr. Weldon Crank Utility Contractor~ American Developers & Contractors, Inc. 2521 East Main Grand Prairie, TX 75050 1-2~4-263-8884 R. C. 'Rick' Ivy