Loading...
Park Meadow-CS 850909GINN, INC. CONSULTING ENGINEERS September 9, 1985 Mr. Tom Wise Univest Development Co. 12770 Coit Road, #1215 Dallas, TX 75251 Re: Park Meadows -- Final Acceptance Dear Mr. Wise: A final inspection of the above referenced project has been confirmed by representatives of the Coppell Municipal Utility District #1, Ginn, Inc., and the City of Coppell. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. As of this date, permits can be issued to start construction of home building. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (September 9, 1986). Sincerely, H. Wayne Ginn, P.E. /sr cc: Steve Goram Dean Youngblood Mike Boney Fred Ivey Randy Fleming Contractors: J. C. Boney Construction Co., Inc. P.O. Box 59485 Dallas, TX 75229 243-2348 American Developers & Contractors, Inc. 2521 East Main Street Grand Prairie, TX 75050 263-8884 16135 Preston Road · Suite 106 ~s Dallas. Texas 75248 · Phone 214 / 386- 6611