Park Meadow-PT 940309-)
BUILDING PERMIT APPLICATION
~ot: Block:
Print or Type in a Clear, Legible Manner
Subdivision:
MAR I994
Phase or Section
~Ad~tion ~Alteration ~ ~e~ir
~pfion of Wo~ to ~ ~ne Claa of Work: ~ ~
Fi~I ~r
S~nd Flor ~er ~d
G~Y ~EA FOR OF~CE USE ONLY
Value of Work
to be Performed
ri L~nlltlnn
NOTICE
This pormit beoomes null and void if work or construction authorized is not commenced
within 180 days, or construction on work is suspended or' ab~doned for a period of 180
days at any time after work is commenced.
.... to be Nc
I hercby certify that I have read and examined Oats apphcabon and know the same
and correct. All provisions of laws and ordinances govcmlng this type of work will be
complied with whethcr specified hcreln or not. Thc wanting of a permit does not presume to
to violatc or cancel the provisions of any othcr federal, sta~e or local law
pexformance of comttuction.
Signature of Contractor or Authorized Agent
8U~VEY PLAT OI~ ..................................................
'FO A~.L sg/%RTIES INTERESTED II~EMISE~ SURVEYFD:
. ~t 8~O~._0~_~, .T~$~ AND AS R~V!~ED.BY CE~!!FI~TE_OF ~RRECI'ION RE~RDED '
~2
Pt)RR(Y~,~I: GO~REI,L
(';,F~ 255743-P
SrA!E OF
20dNl~' OF
.... ~RI~N__~.~T~_ ~ ...........
pl~ce. ~cep~ ~, ~hn~,~ hereon. ~fld Ih.l
.... ~_~.~ t 1 ~ ~)~3_ .....................
o, ~e, ~ . !1'72/92'- . ............
Scale: 1"=20'
FI.Oaf) NE,1E: I hereby re*tl;'y thAI Ihe
fntthe .[:>~L ~ ~1'1~ ...............
To:
From:
RE:
Date:
MEI~IORANDUM
Greg Jones;, Chief Building Inspector
Mike Martin, E,I.T. ~'~rJ'Oa'}
Placement of fence acro.t'~ flume in Parr Meadows Section One
February 22, 1994
The Engineering Deparunent has reviewed a sketch of the fence Mr. Panl Holmes wishes to
construct across an existing concrete overflow drainage flume located between Lots 20 and 2l,
' e
Block 1 of Park Meadows Sectton On . The fence is to be wronght iron and will have a gate
placed in the flume (see exhibit). We have determlned that the placement of the gate would not
affect the operation of the flume. Also, Rey Oonzales, Street gnperintendent, was contacted and
has indicated that he had no problem with this fence.
Therefore, the Engineering Department has no objections to the placement of the proposed
fence. If you have any questions feel tree to contact me.