Loading...
Park Meadow-PT 940309-) BUILDING PERMIT APPLICATION ~ot: Block: Print or Type in a Clear, Legible Manner Subdivision: MAR I994 Phase or Section ~Ad~tion ~Alteration ~ ~e~ir ~pfion of Wo~ to ~ ~ne Claa of Work: ~ ~ Fi~I ~r S~nd Flor ~er ~d G~Y ~EA FOR OF~CE USE ONLY Value of Work to be Performed ri L~nlltlnn NOTICE This pormit beoomes null and void if work or construction authorized is not commenced within 180 days, or construction on work is suspended or' ab~doned for a period of 180 days at any time after work is commenced. .... to be Nc I hercby certify that I have read and examined Oats apphcabon and know the same and correct. All provisions of laws and ordinances govcmlng this type of work will be complied with whethcr specified hcreln or not. Thc wanting of a permit does not presume to to violatc or cancel the provisions of any othcr federal, sta~e or local law pexformance of comttuction. Signature of Contractor or Authorized Agent 8U~VEY PLAT OI~ .................................................. 'FO A~.L sg/%RTIES INTERESTED II~EMISE~ SURVEYFD: . ~t 8~O~._0~_~, .T~$~ AND AS R~V!~ED.BY CE~!!FI~TE_OF ~RRECI'ION RE~RDED ' ~2 Pt)RR(Y~,~I: GO~REI,L (';,F~ 255743-P SrA!E OF 20dNl~' OF .... ~RI~N__~.~T~_ ~ ........... pl~ce. ~cep~ ~, ~hn~,~ hereon. ~fld Ih.l .... ~_~.~ t 1 ~ ~)~3_ ..................... o, ~e, ~ . !1'72/92'- . ............ Scale: 1"=20' FI.Oaf) NE,1E: I hereby re*tl;'y thAI Ihe fntthe .[:>~L ~ ~1'1~ ............... To: From: RE: Date: MEI~IORANDUM Greg Jones;, Chief Building Inspector Mike Martin, E,I.T. ~'~rJ'Oa'} Placement of fence acro.t'~ flume in Parr Meadows Section One February 22, 1994 The Engineering Deparunent has reviewed a sketch of the fence Mr. Panl Holmes wishes to construct across an existing concrete overflow drainage flume located between Lots 20 and 2l, ' e Block 1 of Park Meadows Sectton On . The fence is to be wronght iron and will have a gate placed in the flume (see exhibit). We have determlned that the placement of the gate would not affect the operation of the flume. Also, Rey Oonzales, Street gnperintendent, was contacted and has indicated that he had no problem with this fence. Therefore, the Engineering Department has no objections to the placement of the proposed fence. If you have any questions feel tree to contact me.