Loading...
Old Townhomes-CS040211DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINATION DATE: PRELIMINARY, PHASE 1 Old Coppell Townhomes 2/11/2004 SENT 2/26/2004 5/17/2004 5/24/2004 ASSESSMENT ASSESSED FEE Water Impact Fee $2,660.00 Wastewater Impact Fee $1,960.00 Park Fee $7,710.00 Roadway Impact-Zone $5,130.00 Street Sign $883.98 Street Light $1,173.60 Construction Inspection $9,690.00 EG or Bore Permit $500.00 Overtime Inspection $160.00 Overtime Inspection $160.00 Water Tap Inspection $400.00 Wastewater Tap Inspection $350.00 Water Meter (Domestic) $146.86 Water Meter (Fire/Irrig) $61.80 Meter Deposit (Domestic) $210.00 Meter Deposit (Fire/Irrig) $30.00 Utility Final Inspection $350.00 ~Subtotal to En~. $25,407.58 AMOUNT PAl[: DATE $1,680.00 mc 1/14/2005 $1,680.00 mc 1/14/2005 $7,710.00 rb 4/8/2004 $5,130.00 rb 4/8/2004 $883.98 rb 7/30/2004 $1,173.60 rb 7/30/2004 $9,690.00 rb 4/8/2004 $500.00 rb 2/26/2004 $160.00 rb 9/20/2004 $160.00 rb 9/20/2004 $300.00 mc 1/14/2005 $50.00 di 9/16/2004 $300.00 mc 1/14/2005 $50.00 di 9/16/2004 $1,270.32 mc 1/14/2005 $211.72 di 9/16/2004 $180.00 mc 1/14/2005 $30.00 di 9/16/2004 $300.00 mc 1/14/2005 $50.00 di 9/16/2004 $25,407.58 $0.00 Total Fees Fees Paid Amount Owed TOTALS $31,576.24 $31,459.62 $116.62 Prior To Construction Erosion Control Approved E.P.A.~N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint, 9/3/2004 $2,510.00 DEVELOPMENT FEE TABLE Project: Old Coppell Townhomes (Preliminary Estimate) Date: 2/11/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,660.00 Q00% due at Issuance of Building Permit) Water Tap Inspection Fee $400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $146.86' (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation~*ireline) $61.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $210.00' (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,960.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $350.00 4100% due at Issuance of Buildinl~ Permit) Utility Final Inspection Fee $350.00 (100% due at Issuance of Building Permit) Park Fee $7,710.00 $7,710.00 (100% due prior to Council Approval) Roadway Impact Fee $5,130.00 $5,130.00 (100% due prior to Council Approval) ~ Street Light Fee Information not Available (100% due prior to Acceptance of Project) Il Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II tOTAL $19,008.66 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $12,840.00 DEVELOPMENT FEE WORKSHEET PROJECT: Old Coppell Townhomes (Preliminary Estimate) DATE: 2/11/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 518 inch X 3/4 inch = 7 ESU's inch = 2.5 ESU's = 0 ESU's = 0 ESU's Total #: 9.5 ESU's @ $280.00 ea. (Due pdor to issuance of building permit) Water Tap Inspection Fee: Total #: 8 Connections @ $50.00 ea. (Single family due pdor to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 7 Domestic Meter(s) @ $20,98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $61.80 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of watar meters) Domestic Water Meter Deposit Fee: Total 0: 7 Meter(s) ~ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea, (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 7 (Due prior to issuance of building permit) @$280.00 ea. Wastewater Tap Inspection Fee: Total #: 7 Connections @ $50.00 ea. '(100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 7 Lots ~ $50.00 ea. (100% due prior to issuance of building permit) $2,660.00 $400.00 $146,86 $61,80 $0.00 $0.00 $210.00 $30.00 $1,960.00 $350.00 $350.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone '. 6 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Zone 1 $7,710.00 $0.00 $5,130.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right.of-way. This fee cannot be assessed until after T.U. Etsctdc submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due pdor to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that ara inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Old Coppe# Tow#homes (PreJimlnary Estimate) DATE: 2/11,2004 ROADWA CT E: ~crvic¢ A~ea * 5 Uatcgory ** Residential Land Usc ** Residential Others Not Specified ~0..~ot~ TniL~ 6 ~v¢lopment Unit~ ** 6.00 ~'eMcle Miles p~ ~velopm~t Unit ** 2.85 ~oc ~ VeMOIo Mile *** $300 ~oadway ~pact F~ duo ~ (~velopmcnt U~) x Vehicle Mflcs ~r ~velo~ment U~t) x ~ per VcMclc Mile) = $5,130.00 * (Figure 2 - Roadway Impact Fee 51udy) ** (Table 3 - Roadway Impact Fee Sludy) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)