Loading...
ST9902-CS051128CIP PROJECTS Project No.: ST 99-02~ DI4- 1 ~ Project Name: Sandy Lake Road (SH 121 to State Road) (State Road to Denton Tap) Engineer: Teague, Nall& Perkins, Inc. 1st Review Review Process: Date: Comments: Received: 07-02-01 Preliminary Alignment, Cover Sheet w/Exhibits One Review Set No Reference Set Reviewed By: City Engineer CIP Coordinator Inspector Other Returned to Engineer: 2nd Review Review Process: Date: Comments: Received: 12-12-01 Schematic Design Report - 2 sets full size schematic design plans - 2 half-size sets schematic design plans Reviewed By: City Engineer Engineer CIP Coordinator Inspector Other Returned to Engineer: 3rd Review Review Process: Date: Comments: Received: ~l~ ~ t ~"O ~_x~t~:x~ Reviewed By: ~-~t'- C:~ C~. _ ~ ]~,~ '~ City Engineer Engineer CIP Coordinator Inspector Other Returned to Engineer: Date: Commente Sent to Utilites/Stree;s: Reviewed By Larrf/Garreth: Returned to Engineer: r Date: Comments Sent to LJtiliteslStteets: Reviewed 8y Lar~/Garreth: Returned to Engineer: 3re( Rev/ew .J Oa~e: Comments Recieved: Sent to UtiliteslStreets: Reviewed 8y Lst~ylGatteth: Returned to Enc~ineer: Date: Comments Fees Paid: Water. Sewer, · Roadway, Inspection