PROJECT PROCEDURE MEMORANDUM
Sandy Lake Road Design Services
For
The City of Coppell, (Job # 13480)
In Conjunction With
Sandy Lake Road Improvements for Dallas County, (Job # 11889)
Date: July 14, 1995
This project is closely tied to project # 11889 and schedule requirements will be determined as the
contract proceeds. Currently project 811889 is waiting direction from Dallas County on some
drainage issues before Preliminary Plans are revised and resubmitted for approval. Tasks 1, 2 and
3 will be initiated upon approval of the Preliminary Plans. Task 4 - The alignment study is
currently under way and will be completed soon. And Task 5 - AutoCadd files - done at the
completion of project # 11889.
Appendix "A"ofthe contract documents covers Design Criteria, Assumptions, Detailed Scope of
Work, Deliverables, Billing ect...
CCi
Ken Griffin, City of Coppell
Dan Reich, Project Executive
David Howard, Project Manager
Bill Lewis, Sverdmp Facilities
Sverdmp Civil personnel
07/18/95
08:28
~214 521 3539
SVERDRUP DALLAS
002
SVERDRUP CIVIL, INC.
APPENDIX "A"
CITY OF COPPELL, TEXAS
Sandy Lake Road Design
Construction Plans and Specifications
SCOPE OF SERVICES
The limits of work for improvements to Sandy Lake Road wilt be from approximately 355
feet west of Mac, Arthur Boulevard to the City of Coppell city limit at the Trinity River.
Sverdrup Corporation is presently providing design services to Dallas County Depar'a-nent
of Public Works in connection with Sandy Lake Road Project 91-830 to provide final
design and construction documents to improve Sandy Lake Road to a four-lane divided
facility.
1. TASK 1 . STREET LIGHTING DESIGN
SCOPE OF WORK
(a) Prepare lighting calculations to determine spacing requirements of poles along Sandy
Lake Road.
(b) Prepare voltage drop calculations to determine feeder size to supply lighting units.
(¢) Prepare load calculations to determine the size of service and distribution equipment.
(d) Prepare plan drawings showing the locations of all lighting units along Sandy Lake
Road.
(e) Prepare One Line Diagram showing total connected load and distribution equipment
requirements.
(f) Prepare miscellaneous details sheet showing lighting unit mounting details, distribution
equipment details, and other required element details.
(g) Prepare quantifies sheet showing total electrical equipment and material required for
the street lighting system.
DESIGN CRITERIA
(a) Street lighting design shall be in compliance with the latest edition of the Illuminating
Engineering Society Handbook.
(b) Street lights will be manufactured by Klm Standards in accordance with Cfty of Coppell
Standards, or approved equal.
(c) The electrical design will be in compliance with the latest edition of the National
Electrical Code, and all applicable local and State codes.
I Sverdrup Civil. thc City of Copplll
'1'[ T T I 1II
07/18/95 08:29 SVERDRUP DALLAS ~003
~214 521 3539
APPENDIX "A"
ASSUMPTIONS
(a) Design calculations will be based on Street lighting units being installed in the median
of Sandy Lake Road.
DELIVERABLES
(a) Drawings:
1. Symbols, General Notes & One Line Diagram
2. Lighting 'Plan Sheets I through 11
3. Miscellaneous Details Sheet
4. Quantity Sheet
(b) Construction Specifications - Special ProviSions
2. TASK 2 - SANITARY SEWER DESIGN
SCOPE OF WORK
(a) Prepare Plan & Profile drawings to show' design location of proposed 21" diameter
sanitary sewer line from Mac, Arthur Boulevard to the Sandy Lake Road Lift Station.
(b) Prepare Partial Site Plan drawing at Sandy Lake Road Lift Station to indicate the
sewer line interface/connection requirements at the pump station.
(c) Prepare miscellaneous detail sheet for sanitary sewer details and required details for
utility adjustments/relocations.
(d) Prepare quantity summary sheet showing total material and items required for the
sanitary sewer.
DESIGN CRITERIA
(a) Sanitary sewer design shall conform to the requirements of the City of Coppell
Subdivision Ordinance, Appendix C - "Design Criteria and Standards", 1994 edition.
(b) Engineering requirements shall be in accordance with '~CF Manual of Practice
No. 9" as published by the American Society of Civil Engineers and the Water Pollution
Control Federation.
ASSUMPTIONS
(a) Any required ground surveys are not included in this fee proposal. We anticipate
utilizing existing "As-Built" drawings of the existing sanitary sewers within the right-of-way
and of the lift station and corridor from Sandy Lake Road to the lift station. The actual
existence of 'As-Builts" for the sanitary system has not been determined.
DELIVERABLES
(a) Drawings
1. Plan & Profiles drawings for sanitary sewer
2. Partial Site Plan (~ Sandy Lake Road Lilt Station
2 Sverdrup Ci~l. I'r~.
ci~ of coops,
07/18/95
08:29
~2~4 521 3539
SVERDRUP DALLAS
004
APPENDIX "a"
3. Miscellaneous Details sheet
4. Quantity summary
(b) Construction Specifications - Special Provisions
3. TASK 3 - SIGNALIZATION DESIGN AT MacARTHUR BLVD. AND SANDY LAKE
sCOPE OF WORK
(a) Prepare/design signal plan layout and signal phasing diagram
(b) Develop signal hardware quantity summary sheet.
(c) Provide conduit and cable quantity summary sheet.
(d) Prepare Equipment Detail sheet (i.e. Signal Heads, Poles, Foundations, Pull Boxes,
Mast Arms)
(e) Prepare General Notes and Conditions sheet
DESIGN CRITERIA
(a) All traffic signalization shall be in compliance with the Texas Manual on Uniform Tmff'm
Control Devices for Streets and Highways, Part tV - Signals.
(b) Traffic signal design shall be in accordance with the City of Coppell Subdivision
Ordinance.
ASSUMPTIONS
(a) City of Coppell will coordinate with local utility to provide location of power source.
(b) Traffic counts to be provided by the City of Coppell for intersection traffic movements
DELIVERABLES
(a) Signal Plan Layout sheet & Phasing diagram
(b) Signal Hardware Quantity Summary sheet
(c) Conduit Cable Quantity summary sheet
(d) Equipment Detail Sheets
(e) General Notes and Conditions Sheet
4. TASK 4 - DESIGN OF SOUTH ALIGNMENT SHIFT OF SANDY LAKE ROAD at
/ MacARTHUR BOULEVARD
SCOPE OF WORK
The purpose of this task element is to determine both the design and construction cost
impacts of a southward shift of the centertine alignment. This shift is contemplated to
attempt to mitigate the impacts to property owners due to right-of-way acquisition along
the north side.
Sverdrup recommends that some preliminary alignments be developed along with the
associated roadway cross sections to evaluate cost trade-offs of an alignment shift.
Sverdrup would also analyze roadway functionality due to a shift in alignment.
~'I I I ]11' I
07/18/95
08:30 ~214 521 3539 SVERDRUP DALLAS
005
APPENDIX "A"
The effort associated with this task should be only to develop a reasonable cost estimate
of construction costs to provide an alignment shift.
Our concern is that encroachment into the existing 80' wide drainage easement may
require construction of Iow retaining walls to maintain the required flow area. Aisc,
encroachment into the drainage easement, or placement of any fill material, may require
a hydrologic/hydraulic analysis to determine adequacy of the channel configuration.
Sverdrup proposes that a brief Summary Report be prepared to address the feasibility
and costs associated with an alignment shift rather than propose a design fee to
accomplish the alignment shift.
Sverdrup proposes the following to provide City of Coppell with the feasibility of an
alignment shift:
(a) Prepare preliminary alignment drawings using our current CADD database
(b) evaluate impacts to the 80" Drainage Easement along south PJW.
(c) develop rough '~vorking" drawings of Mac. Arthur Blvd./Sandy Lake Road intersection.
(d) determine traffic impacts due to intersection offset & modifications needed to maintain
turn lane storage oh MacArthur, median island configuration, radius returns, crosswalk
changes.
(e) evaluate impacts to existing drainage structures along 80' Drainage Easement.
DELIVERABLES
(a) Preliminary alignment drawings
(b) "Working" Drawings of Mac, Arthur Blvd./Sandy Lake Road intersection depicting
revisions required to existing features (median, tum lanes, etc.)
(c) Cross-Sections of revised alignment
(d) Summary Report addressing impacts including a construction cost estimate and
design fee estimate to accomplish the shift.
5. TASK 5 .-.{OPTIONAL)
SCOPE OF WORK
(a) Sverdrup Corporation is currently preparing the Sandy Lake Road project for Dallas
County Department of Public Works utilizing Intergraph Micro-Station. We will provide the
City of Coppell the final plans in AutoCadd electronic format is desired. (Approximately
120 files)
PROJECT BUDGET
We have prepared a proposed project budget, included as Attachment "B". We propose
to provide these services on a lump sum basis, in accordance with the Agreement for
Professional Services which is attached hereto. We will submit our invoice to the City of
Coppell, to the attention of Kenneth Griffin, P. E., at monthly intervals. We are happy to
4 Sverdrup Civil. Im City of