Loading...
121 BP Phase 1-CS000515The City With A Beautiful Future PO BOX 478 COPPELL TEXAS 75019 P.O. Box 478 CoppelL Texas 75019 972-462-0022 May 15, 2000 Pat Acker, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 RE: One Twenty One Business Park - Addendum for 3rd Irrigation Meter Fee Assessment Letter Dear Mr. Acker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. This assessment is an addendum to account for a third irrigation meter. Please make payment to the City of Coppell in the amount of $3,872.05 and forward to the Finance Department along with a copy of the Fee Assessment table. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees. Sincerely, Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Debbie Ingram, Secreta~ Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: One Twenty One Business Park - Addendum for 3rd Irrigation Date: o5/15/2ooo TOTAL FEES DUE Water Impact Fee $3,600.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $192.05 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (I00 % due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee Info not Avail (100% due prior to Acceptance of Project Street Sign Fee Info not Avail (100% due prior to Acceptance of Project Construction Inspection Fee Info not Avail FOTAL $3,872.05 DEVELOPMENT FEE WORKSHEET PROJECT: One Twenty One Business Park - Addendum for 3rd Irrigation Meter DATE: 05/15/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 8 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single ~amily due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) IrrigationfFireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.05 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $3,600.00 $50.00 $0.00 $192.05 $0.00 $0.00 $0.00 $30.00 $0.00 $0.00 $0.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans ara submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $o.oo $o.oo Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost raquirad for private improvements) (4% of development cost requirad for public improvements) Information not Available Page 2