May 15, 2000
Pat Acker, P.E.
Halff Associates, Inc.
8616 Northwest Plaza Drive
Dallas, TX 75225
RE: One Twenty One Business Park - Addendum for 3rd Irrigation Meter
Fee Assessment Letter
Dear Mr. Acker:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development. This
assessment is an addendum to account for a third irrigation meter.
Please make payment to the City of Coppell in the amount of $3,872.05 and forward to
the Finance Department along with a copy of the Fee Assessment table.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees.
Sincerely,
Kent M. Collins, P.E.
Civil Engineer
CC:
Jennifer Armstrong, Finance Director
Debbie Ingram, Secreta~
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: One Twenty One Business Park - Addendum for 3rd Irrigation
Date: o5/15/2ooo
TOTAL
FEES DUE
Water Impact Fee $3,600.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $192.05
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(I00 % due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
Street Light Fee Info not Avail
(100% due prior to Acceptance of Project
Street Sign Fee Info not Avail
(100% due prior to Acceptance of Project
Construction Inspection Fee Info not Avail
FOTAL $3,872.05
DEVELOPMENT FEE WORKSHEET
PROJECT: One Twenty One Business Park - Addendum for 3rd Irrigation Meter
DATE: 05/15/2000
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0 = 0 ESU's
1 - 2 inch = 8 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 8 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(Single ~amily due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
IrrigationfFireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.05
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 0: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$3,600.00
$50.00
$0.00
$192.05
$0.00
$0.00
$0.00
$30.00
$0.00
$0.00
$0.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans ara submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$o.oo
$o.oo
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost raquirad for private improvements)
(4% of development cost requirad for public improvements)
Information not Available
Page 2