Loading...
121 BP Phase 1-CS000307 214 304 35?0 05×08×00 12:09 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.  COPPELL, TEXAS 75019 PO. ~ox 478 CoDI3ell. Texas 75019 972-462~0~2 March 7, 2000 Mac McClure TIO P.O. Box 802047 Dallas, Texas 75380-2047 RE: 121 Business Park Final Walk-thru Dear Mr. McClure: Please be advised that a walk-through has been scheduled for Wednesday, March 15, 2000 at 2:00 p.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with ~e inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-3684 at your earliest convenience. Si.ce CC: Todd Abbott, Halff Assoc. (fax: 214-361-5973) Brian Holdgate, Bear Creek Const. LTD (fax 972-406-9010) Richard Lacey. Pavecon Debi Ingrain, Engineering Secretary Glenn Itollowell, Director of Public Works Greg Jones, Chief Building Official Lee Stone. Commercial Inspector Travis Cramp, Fire Marshal