121 BP Phase 1-CS000307 214 304 35?0
05×08×00 12:09 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.
COPPELL,
TEXAS 75019
PO. ~ox 478
CoDI3ell. Texas 75019
972-462~0~2
March 7, 2000
Mac McClure
TIO
P.O. Box 802047
Dallas, Texas 75380-2047
RE: 121 Business Park
Final Walk-thru
Dear Mr. McClure:
Please be advised that a walk-through has been scheduled for Wednesday, March 15, 2000 at
2:00 p.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with ~e inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-304-3684 at your earliest convenience.
Si.ce
CC:
Todd Abbott, Halff Assoc. (fax: 214-361-5973)
Brian Holdgate, Bear Creek Const. LTD (fax 972-406-9010)
Richard Lacey. Pavecon
Debi Ingrain, Engineering Secretary
Glenn Itollowell, Director of Public Works
Greg Jones, Chief Building Official
Lee Stone. Commercial Inspector
Travis Cramp, Fire Marshal