Loading...
121 BP Phase 1-CS000120 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Construction Inspector Engineering Gary Price, Utilities Division Public Works January 20, 2000 Follow-up Walk-thru One-Twenty-One Business Park 1. O.K. CITY OF COPPELL PUBLIC tt/ORK$ DEPARTMENT MESSAGE CONF I RMAT I ON 01×20/00 16: 38 ID--CITY OP COPPELL DATE 01/20 S~R-TIME DISTANT STATION ID MODE PAGES OO~20" CITY OF COPPELL CALLING O1 RESULT OK 0000 Issued: ~ Finished: Phone Nu~nl~er: WATE~ Employee: ;~'~// G~rid map:, ^d ess: Check for: Acctwacy test: Meter Leak: Initial meter relocation inspections Check water pressure: Re-read 1. Backflow Inso. 2. Repair 3. Maintenance 4. Other Backflow Insp. Bkflow Cert. Date Re-Cert. Date A. Main Line A. Pump A. Line Locate B. Valves B. Water Tower B. Line Locate C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A.J~arricades B. Cones C. Tape D. Lights E. Other / / 7. If Meter/Service Leak: Classify: - City: Customer. Fire plug ~shing A. Water Loss (estimate): GPM B. Was Water Metered: Yes C. Was Customer Notified: Verbally 8. If Meter Change Out: Total Gallons Doorknocker - Vehicle/Equipment Used Unir # Miles Hfs Equipment A. Old .Meter # Reading B. New Meter # Reading C. Old Meter Size/Type: D New Meter Size/Type E. Type of work performed or f'mdings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man-hours: / I l. List Materials Used: Crew Members. 12. If you had an accident, lncident while perfo?~mg this request. Did you report it? Yes or no 13. Water Utilities meter inspection: ~///~~r fail 14. How many trips to do task?