Loading...
121 BP Phase 1-PT 810312APPROVAL Form 1023 (2-77) TO: City of Co?ell P. O. i~ox 47S Texas 75910 Control ,)6:1 Section 2 Maintenance Section No. Hwy. No. %.H. ] Pa ~ ~as County Date 3- ~ Z - J, [ .1 The State Department of Highways and Public Transportation offers no objec- tion to the location on the right-of-way of your proposed]2" water !~min ? ]E" ¢0rrui {L~d ,-eta] ca$~ine as shown by accompanying drawings and notice dated 3-~ except as noted below. It.is expressly understood that the State Department of Highways and Public Transportation does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the State Department of Highways and Public Transportation may require the owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. You are requested to notify this office prior to commencement of any routine or periodic maintenance which requires pruning of trees within the highway right-of-way, so that we may provide specifications for the extent and meth- ods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean-up. These specifications are intended to preserve our con- siderable investment in highway planting and beautification, by reducing damage due to trimmin9. The installation shall not damage any part of the highway and adequate pro- visions must be made to cause minimum inconveniences to traffic and adjacent property owners. In the event the Owner fails to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. Minimum clearances above the roadway for aerial utilities shall be 22' for power lines and 18' for communications lines. SPECIAL PROVISIONS: 1. utility Installation Si~%,cJfications L'ator & Pressure Pipelines i. S;,,ecifications for 3ackfill mvJ are as follows: Lewis. Please notify !illt0n gurecky telephone (214) 436-1545 at least forty-eight (48) hours prior to starting construction of the line in order that we may have a representative present. STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION BY:District Engineer - 9istrlc~umber l,-~ NOTICE OF PROPOSED INSTALLATION UTILITY LINE ON NON-CONTROLLED ACCESS HIGHWAY For~ 1023 (2-77} 3-4-81 Date 20 THE STATE HIGHWAY AND PUBLIC TRANSPORTATION COMMISSIO] ~/o DISTRICT ENGINEER 3TATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION ~;. ,. Dallas , TEXAS Formal notice is hereby given that City of C0ppe]]__ lompany proposes to place a ]2" water main & ]8" corrugated metal casin9 line within the right-of-way of State Highway No. ]2] in Dallas County, Texas as follows: (give location, length, general design, etc.) A 12" diameter water main is to be installed by open cut methods for approximately ]692 L,F. within the state highway R.O.W., said main to be located lO' from the eastern R.O.W. boundary as shown on attached Drawing A. Approximately 75 L.F. of 12 gauge 18" diameter corrugated metal encasement to be provided for that portion of the main lying under Corporate Park Boulevard. The line will be constructed and maintained on the highway right-of-way as shown on the attached drawings and as directed by the State Department of Highways and Public Transportation in accordance with governing laws. Our Firm further understands that the State considers proper traffic control measures as those complying with applicable portions of the Texas Manual of Uniform Traffic Control Devices required for adoption by the "Uniform Act Regulating Traffic on Highways" (V.C.S. 6701d). The location and description of the proposed line and appurtenances is more fully shown by Drawing A attached to this notice. Construction of this line will begin on or after the April , 19 ~] . First day of Pi~/~ City ofF'f~B~l / Address P.O. BOX 478 Cq~elly_Texas 75019 STA~ DEPARTI~I~ OF HIGI~AYS AND PUBLIC TRANSPORTATION DISTRICT NO. 18 UTILIT~ INSTALIATION SPECIFICATIONS 1. GENERAL A copy of this authority for utility installation on highway right of way shall be kept on the Jobsite at all times during the proposed work. Unless arranEements are made with the designated State Department of Highways and Public Transportation (herein after called Department) representative, no work shall be performed on Saturdays, Sundays or holidays. 2. COORDINATION OF WORK WITH DEPARTMENT RESIDENT ENGINEER If any part of the related highway is under construction, the Utility or its Contractor shall contact the Department Resident Engineer before enter- lng the project. All work shall be coordinated with the State Contractor as directed by the Department Resident Engineer. 3. TRAFFIC SAFETY] BARRICADES~ WARNING SIGNSt ETC. Traffic control and protective devices shall be used and must conform to the Texas Manual on'Uniform Traffic Control Devices for Streets and Highways. Barricades, warning signs, flares, flashing devices, and flagmen shall he provided by the Utility Owner or his Contractor when deemed necessary by either a Department Representative or a Utility Owner Representative. Any above ground obstruction or underground boring pit, actually located closer than the specified horizontal offset as outlined on the Special Specifications Sheet attached hereto, shall be protected by barricades, signs, flares, and/ or guard fence as deemed appropriate. Vehicles, equipment, construction material, and personnel not necessary to the timely installation of the facility shall be kept off the traveled way and shoulders to provide minimum interference and hazards to the travelling public. No construction operations relative to installation of utilities will be permitted within the limits of existing pavements carrying traffic, or shoulders adjacent thereto, unless specifically authorized by the Department. Excavated raaterials shall be kept off pavements at all times. 4. STAKING OF UTILITY INSTALLATIONS IN ADVANCE OF CONSTRUCTI(AN All utility installations shall be staked well in advance of construction so that the Department may inspect the staking to verify that alignment and grade conform to the requirements set out herein and that there is no conflict with highway facilities. Utility Owner shall give the Department not less than 48 hours notice ahead of time when the staking of installations will be completed so that erransements may be made for checking the alignment and grade. Ultimate responsibi'lity for accuracy of staking and installation rests with the Utility Owner. There is no responsibility assumed by the Department to check every REV. 8-75 SDHPT - District 18 -2- installation. The waiver of the right to check the utility company's stakes and installation does not relieve the Utility Owner of his obligation for eccu~acy. 5, TIHE PERIOD ALL~4ED FOR INSTALLATION If the installation of the work covered by this utility notice has not been started within 6 months from the approval date, the approval is void. It is expected that the instalk tion will progress to completion in an e£fi- cient manner. If the work progress is delayed, interrupted, or abandoned for a period of 2 months or more, written application shall be sumitted to continue under the authority of the originally approved utility notice. No work shall be resumed within the limits of highway right of way until a written approval is received. ASSUMPTION OF UTILITY PROJECT BY STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION It shall be the right of the Department to take charge of and to remedy any immediate hazard to public property or threat to the travelling public when it is obvious the utility owner will not do so. Any costs associated with such forced completion will be charged to the Utility Owner. Unusual traffic conditions, weather conditions, soil conditions, abandonment of the work (temporary or permanent), unusually slow progress causing a boring pit to remain open beyond a reasonable period of time, etc. may be factors con- sidered in the action deemed necessary. FULL TIME SUPERVISION AND INSPECTION The Utility Owner shall provide competent, full time, on-the-site super- visors or inspectors for all utility installations placed within the limits of highway right of way. These representatives shall be knowledgeable and shall have the authority to issue instructions to Utility Owners' forces or to their contractors. 8. RESTORATION OF HIGHWAY RIGHT OF WAY No removal of trees or shrubbery of value to the highway shall be made except when Justified by conditions and authorized by the Department. If removal is permitted, it shall be contingent upon replacement in kind by the utility firm. Before final completion of work within the limits of highway right of way, final clean up shall be completed. The highway right of way shall be left in s condition at least equal to its condition before utility work was started. 9. USE OF EXPLOSIVES No explosives shall be used within limits of highway without written permission of the Department. Requests for permission to use explosives shall include the following information: REV. 8-75 SDHPT - District 18 -3- a. Locat£on where use of explosives is proposed. b. Type, amount, t£me o£ day, etc., where use of explosives is proposed. c. Ha~e and qualifications of person who will be in responsible charge of blasting operation. d. Type and amount of insurance coverage for blasting operations. Furnish name and address of insurance company. e. Adequate assurance that no damage or hazard will be caused thereby, in- cluding detailed plans and procedures approved by a person qualified and experienced in the use of explosives. 10. UTILITY ACCOI~IODATION POLICY Utility installations on, over or under the right of way of the State Highway System shall conform with requirements contained in the Texas State Department of Highways and Public Transportation Utility Accommodation Policy adopted 3uly, 1974, alonE with curreot revisions thereto, and/or as a minimum, the appropriate requirements outlined ie the following: a. Electric power and communication utility installations. (1) National Electric Safety Code (2) Safety rules for the installation and maintenance of electric supply and communication lines - National Electric Safety Code b. Water lines - American Water Works Association c. Gas pipelines - Title 49, CFR, Part 192, Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards and amendments. d. Liquid petroleum pipelines - Title 49, CFR, Part 195, Transportation of Liquids by Pipelines and amendments. e. Latest American Society for Testing and Materials (ASTM) specifications. REV. 8-75 SDHPT - District 18 I~IS?I~.TATION OF WATER OR PRESSURE SEWER LINES WITHIN HIGIi~AY RIGHTS OF WAY 1. LONGITUDINAL INSTALLATION The pipes shall be placed on uniform alignment and shall be installed in an area between three (3) and ten (10) feet from the right of way line. The minimum depth of cover in the right of way shall be twenty-four (24) inches for metallic pipe and thirty (30) inches for nonmetallic pipe. If a nor~etallic pipe is to be used, a durable metal wire shall be concurrently installed with the line or other means shall be provided for detection purposes. Each pipe line may be installed with enough vertical flexibility to prevent excessive stresses; however, horizontal "snaking" of the pipe within a construction ditch is not approved, 3. See 8-75 CROSSINGS The crossing o~ any pavement structure of existing roadways (including intersecting streets and roadways) within the highway right of way shall be installed as provided herein: The crossings shall be encased and shall be placed by borin~ or tunneling. Jacking or pushing of encasement by mechanical means shall not be used. The construction installation shall be made in a manner that will not interfere with the operation of the highway. It shall not weaken or damage any embankment or structure of the highway. No unprotected excavation under the pavement structure is allowed in the placement of the casing if the size of bore, nature of soil, or the cover above the bored hole is insufficient to prevent cavin~ of the excavation. The casing shall be approximately the same size as the bored or tunneled hole. Void spaces resultin~ from more than one (1) inch free bore after the placement of the casin~ shall be pressure grouted with a mixture consisting of two (2) sacks of cement per cubic yard of sand. Casing shall consist of a pipe or other sepamt~structure around and outside the carrier line. It shall be designed to support the loads of the hishway and superimposed loads thereon, including those of construction machinery. The strength of the casing shall.equal or exceed the structural requirements for drainage culverts and shall be composed of materials of satis- factory durability under conditions to which the casing may be subjected. A readily identifiable and suitable marker shall be placed at the right of way line showin~ ownership of the line. Encasemeut shall, at a minimum, be installed under pavement, normal center medians, center of ditch to center of ditch for cut sections (or five feet beyond the toe of slope for fill sections, or face of curb) on all roadways unless safety distances require greater lengths. Specifications Entitled "TRENCH EXCAVATIONS AND PIT LOCATIONS". .- SDHPT - District 18 SPECIFICATIONS FOP. BACKFILL Trenches shall be backfllled with material selected from the excavation, or obtained from other sources, which is free from stones of such size as to interfere with compaction and is free from large lumps which will not break down readily under compaction. The Department Engineer shall have the right to reject any material containing more than 20 percent by weight of material retained on a 3-inch sieve, or material excavated in such a manner as to produce large lumps not easily broken down or which cannot be spread in loose layers. In general, material excavated by means of a trenching machine will meet the requirements above pro- vided large stones are not present. The following requirements shall apply to the backfilling of trenches in addition to the pertinent portions of the general requirements given in the preceding paragraph. After the bedding has been prepared and the pipes installed as required by the pertinent specifications, selected materials from excavation or borrow shall be placed along both sides of the pipe equally, in uniform layers not exceeding 6-inches in depth (loose measurement), wetted if required, and thoroughly compacted so that on each side of the pipe there shall be a berm of thoroughly compacted material at least as wide as the external diameter of the pipe, except insofar as undisturbed material obtrudes into this area. Filling and/or backfilling shall be continued in ~is manner to the ele- vation of the top of the pipe. Special care shall be taken to secure thorough compaction of the materials placed under the haunches of the pipe. All fill or backfill below the top of pipe shall be compacted mechanically in the manner prescribed above, regardless of whether such material is placed within the limits of the embankment or roadbed. In the case of pipe placed in trenches, that portion of the backfill above the top of the pipe which supports the embankment or roadbed shall receive mechanical compaction and shall be placed in 6-inch layers in depth (loose measurement). The portion which will not support any part of the embankment or roedbed shall be placed in layers not more than 10- inches in depth (loose measurement) and shall be compacted by whatever means the Contractor chooses to a density comparable with the adjacent undisturbed material, Water Jetting or ponding is not permitted. Hand operated mechanical tampers may be used with approval of the Engineer for compacting backfill. REV. 8-75 SDHPT - District 18 Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS LETTER OF TRANSMITTAL ~_-,-r'-t oF' W.O. No. 4~-~-~8 WE ARE ENCLOSING: DATE: No. Collies :Description For Your Use As Requested For Your Approval Approved as Noted REMARKS: 520 Avenue H East / Arlington, Texas 7601 ! / (817) 640-8535