Loading...
ST9301-CS 941102November 2, 1994 Sverdrup Civil, Inc. 4311 Oak Lawn Suite 30[3 Dallas, Texas 75219 Mr. Kenneth M. Griffin, P.E. Assistant City Manager Director of Public Works - City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Mr. Griffin: As a follow on to our meeting of October 28, I would like to bring you up to date. First, we are in the process of developing some rough drawings which will allow us to evaluate the impacts of a southward shift of the Sandy Lake Road alignment between MacArthur Blvd. and Kimbel Kourt. The intent is to determine if the head in parking can be saved at the restaurant. Secondly, we are also in the process of developing manhour estimates for: Street lighting design Signalization design for MacArthure Blvd. and Sandy Lake Road intersection. Design of the new 21" sanitary sewer from MacArthur Bird to the Sandy Lake Road lift station. I have also spoken with Mr. CJreg Saunders, Project Engineer for Rady & Associates, Inc. to ensure that coordination issues are not overlooked. We both agree that a coordination meeting is appropriate when both our sections are more thoroughly developed. In the mean time, I anticipate that Sverdrup's proposal for the City of Coppell will be completed by approximately November 11. If you have any questions or comments, please feel free to call. Sincerely, SVE~ CIVIL, INC. Dahrd~li. Reich, P.E. Manager C: Bill Jessup, P.E. - Dallas County Public Works Jim Van Buren Omar Feeler