ST9301-CS 941019DALLAS COUNTY PUBLIC WORKS October 19, 1994 Mr. Ken Griffin, P.E. City Engineer/City of Coppell P.O. [lox 478 255 Parkway Coppell, Texas 75019 Re: Sandy Lake Road -- Project 91-830 (MacArthur Boulevard to Coppell City Limit) Bicycle Lane Dear Mr. Griffin: This is in reference to my letter of July 26, 1994, which furnished you with the additional cost information for adding bicycle lanes on both sides of Sandy Lake Road in Coppell. The additional cost including design was $148,548.00. My letter indicated that our consultants were on hold and we needed your response as to whether or not we were to proceed to add bicycle lanes to the project or not. On September 16, 1994, by telephone I suggested you might want to consider an alternate section. Instead of adding an additional 3 feet on each side add only 1 foot. Instead of roadway striped for a 12 foot and 15 foot lane it would be striped for an 11 foot an 14 foot lane. The additional cost would probably be around $49,500.00. A response from the City of Coppell regarding the addition of bicycle lanes on this project is desperately needed inorder for us to continue with the design. Sincerely, E.~'- Proj~~/j BEJ:slc ~ ~.' David Howard, P.E., Sverdrup Corp. 850:\BIKELN.LTR 411 Elm Street Dallas, Texas 75202 653-7151