Loading...
Old Townhomes-CS040817COPPEi L August 17, 2004 Kurt Jones Carbon Landmark, LLC 1701 N. Collins Blvd Suite 1200 Richardson, TX 75080 RE: Old Coppell Townhomes - Phase 2 Fee Assessment Letter Dear Mr. Jones Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $32,100.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior Application for building permits for phase two of your development. The Engineering Department has placed a "hold" on building permits within this phase until such time as those fees have been paid. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Fees will be assessed on the two commercial lots adjacent to Coppell Road at the time that they are developed. Those fees are not included in the attached calculations. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. CoppelI Road. Meters wilI be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful continuation of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~. Keith R. Marvin, P.E. Civil Engineer Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEES PROJECT NAME: Old Coppell Townhomes, Phase 2 ENGINEER: C&P Engineering ORIGINATION DATE: 8/17/2004 SENT ASSESSMENT ASSESSED FEE AMOUNT PAll" DATE 8/17/2004 Water Impact Fee $4,200.00 Wastewater Impact Fee $4,200.00 Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection ~Subtotal to En~. $19,275.00 $12,825.00 $750.00 $750.00 $3,175.80 $0.00 $450.00 $o.oo $750.00 $32,100.00 $0.00 $32,100.00 TOTALS Total Fees Fees Paid $46,375.80 $0.00 Amount Owed $46,375.8O Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEE TABLE Project: Old Coppell Townhomes - Phase 2 Date: 8/17/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,200.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $750.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $314.70 (100% due at Issuance of Water Meter) Water Meter Fee (In'igation/Fireline) $0.00 (I 00% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $450.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,200.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $750.00 (I00% due at Issuance of Building Permit) Utility Final Inspection Fee $750.00 (100% due at Issuance of Building Permit) Park Fee $19,275.00 $19,275.00 (100% due prior to Council Approval) Roadway lmpact Fee $12,825.00 $12,825.00 (100% due prior to Council Approval) Street Light Fee Information not Available (I 00% due prior to Acceptance of Project) Street Sign Fee Intbrmation not Available (100% due prior to Acceptance of Project) [[ Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $43,514.70 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $32,100.00 DEVELOPMENT FEE WORKSHEET PROJECT: Old Coppell Townhomes - Phase 2 DATE: 8/17/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 15 - 5/8 inch X 3/4 inch Total #: 15 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 15 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 15 Domestic Meter(s) @ (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total it: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 15 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 15 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 15 Connections @ $50.00 ea (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 15 Lots @ $50,00 ea. (100% due prior to issuance of building permit) 15 ESU's 0 ESU's 0 ESU's 0 ESU's $4,200.00 $750.00 $0.00 $0.00 $0,00 $45Q00 $0,00 $4,200.00 $750.00 $750.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Park Development Zone: 15 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Zone 1 $19,275.00 $0.00 $12,825.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way~ This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed, (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Old Coppell Townhomes (Preliminary Estimate) 8/17/2004 ROADWAY IMPACT FEE: Service Area * 5 Category ** Residential Land Use ** Residential Others Not Specified No. Lots/Units 15 Development Units ** 15.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due =(DeveIopment Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $12,825.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway lmpact Fee Study) I AMOUN~I~UE: :$12825¢0