Park West CC(4)-CS 940912DEVELOPMENT FEES
IIPROJECT NAME:
IENGINEER:
IREVISION DATE:
M.J. Designs
Albert H. Halff & Associates
9/12/94
SENT
11/18/93
: 11/18/93
2/25/94
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Overtime Inspection
Irrigation
Street Escrow
Street Cut Permit
Overtime Inspection
ASSESSED FEE
$11,700.00
$3,600.00
$1,451.00
$116.00
AMOUNT PAID DATE
$11,700.00 11/22/93
$3,600.00 11/22/93
$1,451.00 2/1/94
$116.00 4/12/94
TOTALS
Total Fees
$16,867.00
Fees Paid Amount Owed
6,867.00 $0.00
NOTES
(w/plans)
11/29/93
12/22/93
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Homeowner's MaJnt.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
The following
project.
November 18, 1993
Ken Griffin, City Engineer P.E.
Howard L. Pafford, Utilities Superintendent
Development Fees for M. J. Designs Warehouse
fees should be assessed on the above
referenced
Water Impact Fee:
- 1%"
- ~0"
Total 18
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
ESU's @ $650.00 ea
100% due prior to Council approval
8 ESU's
5 ESU's
5 ESU's
= $11,700.00
of final plat.
Wastewater Impact
I - 3"
Total 8
100% due prior to Council approval
Residential meters = 8 ESU's
ESU's ~ $450.00 ea = $3,600.00
of the final plat.
Water Tap Inspection Fee
4 Connections ~ $100.00 each = $ 400.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Utility Final Inspection Fee
$ lots ~ $50.00 = $50.00
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee
1 - 2"
2 - 10"
(Domestic/Fire)
Domestic Meter
DDC Fire Meters
$205.10 ea = $205.10
$3,800.00 ea = $7.600.00
Total = $7,805.10
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
1 - 1~" Irrigation Meters @ $157.00 ea = $157.00
100% due prior to issuance of water meters.
Water Meter Deposit
4 meters ~ $35.00 ea = $140.00
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HLP/dm
xo:
Steven G. Goram, Director of Public Works
M.J. Designs Warehouse File
Director of Public Works
FEES/MJDESIGN.HLP