Loading...
Park West CC(4)-CS 940912DEVELOPMENT FEES IIPROJECT NAME: IENGINEER: IREVISION DATE: M.J. Designs Albert H. Halff & Associates 9/12/94 SENT 11/18/93 : 11/18/93 2/25/94 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Overtime Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection ASSESSED FEE $11,700.00 $3,600.00 $1,451.00 $116.00 AMOUNT PAID DATE $11,700.00 11/22/93 $3,600.00 11/22/93 $1,451.00 2/1/94 $116.00 4/12/94 TOTALS Total Fees $16,867.00 Fees Paid Amount Owed 6,867.00 $0.00 NOTES (w/plans) 11/29/93 12/22/93 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's MaJnt. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: The following project. November 18, 1993 Ken Griffin, City Engineer P.E. Howard L. Pafford, Utilities Superintendent Development Fees for M. J. Designs Warehouse fees should be assessed on the above referenced Water Impact Fee: - 1%" - ~0" Total 18 Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = ESU's @ $650.00 ea 100% due prior to Council approval 8 ESU's 5 ESU's 5 ESU's = $11,700.00 of final plat. Wastewater Impact I - 3" Total 8 100% due prior to Council approval Residential meters = 8 ESU's ESU's ~ $450.00 ea = $3,600.00 of the final plat. Water Tap Inspection Fee 4 Connections ~ $100.00 each = $ 400.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee $ lots ~ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 2" 2 - 10" (Domestic/Fire) Domestic Meter DDC Fire Meters $205.10 ea = $205.10 $3,800.00 ea = $7.600.00 Total = $7,805.10 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 1 - 1~" Irrigation Meters @ $157.00 ea = $157.00 100% due prior to issuance of water meters. Water Meter Deposit 4 meters ~ $35.00 ea = $140.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xo: Steven G. Goram, Director of Public Works M.J. Designs Warehouse File Director of Public Works FEES/MJDESIGN.HLP