Park West CC(4)-CS 931118TheCity With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
November 18, 1993
Mr. Dennis Chovan
Albert H. Halff Associates
8616 Northwest Plaza Dr.
Dallas, TX 75225
RE: M~I. Designs Warehouse
Development Fee Assessment
Dear Mr. Chovan:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the
development fee calculations for M.J. Designs Warehouse.
Please provide a check made payable to the City of Coppell in the amount of $15,300.00 and forward
it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please
provide our office a copy of the Engineer's Estimate or contract for this project so the construction
inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify
payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not hesitate
to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVF_J.,OPMle~NT FEES
November 18, 1993
M.J. Designs Warehouse
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100% due at Issuance of Building Permi0
Wastewater Impact Fee
(100% due prior to Council Approval)
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
Water Meter Fee (Lots)
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation)
(100% due at Issuance of Water Meters)
Water Meter Deposit
(100% due at Issuance of Building Permio
Escrow (see separate agreemen0
AMOUNT DUE
PRIOR TO
TOTAL COUNCIL
ASSESSMENT APPROVAL
$11,700.00 $ 11,700.00
$ 400°00 -0-
$ 3,600.00 $ 3,600.00
$ 50.00 -0-
$ 7,805.10 -0-
$157.00 --0-
$ 140.00 -0-
N/A
TOTAL
TOTAL AMOUNT DUE PRIOR TO
COUNCIL APPROVAL
$23,852.10
$ 15,300.00
+ Construction Inspection Fee (2% of Project
Cost due prior to preconstruction meeting).
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
The following
project.
November 18, 1993
Ken Griffin, City Engineer P.E.
Howard L. Pafford, Utilities Superintendent
Development Fees for M. J. Designs Warehouse
fees should be assessed on the above
referenced
Water Impact Fee:
1 2" Domestic Meter/s = 8 ESU's
1 1%" Irrigation Meter/s = 5 ESU's
2 - 10" Fireline Meter/s = 5 ESU's
Total 18 ESU's @ $650.00 ea = $11,700.00
100% due prior to Council approval of final plat.
Wastewater Impact
1 - 2" Residential meters = 8 ESU's
Total 8 ESU's ~ $450.00 ea = $3.600.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
4 Connections @ $100.00 each = $ 400.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Utility Final Inspection Fee
1 lots ~ $50.00 = $50.00
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic/Fire)
1 2" Domestic Meter
2 10" DDC Fire Meters
$205.10 ea = $205.10
$3,800.00 ea = $7,600.00
Total = $7,805.10
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
1 - 1%" Irrigation Meters ~ $157.00 ea = $157.00
100% due prior to issuance of water meters.
Water Meter Deposit
4 meters ~ $35.00 ea = $140.00
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HLP/dm
xc:
Steven G. Goram, Director of Public Works
M.J. Designs Warehouse File
Director of Public Works
FEES/MJDESIGN.HLP