Loading...
Park West CC(4)-CS 931118TheCity With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 18, 1993 Mr. Dennis Chovan Albert H. Halff Associates 8616 Northwest Plaza Dr. Dallas, TX 75225 RE: M~I. Designs Warehouse Development Fee Assessment Dear Mr. Chovan: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for M.J. Designs Warehouse. Please provide a check made payable to the City of Coppell in the amount of $15,300.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVF_J.,OPMle~NT FEES November 18, 1993 M.J. Designs Warehouse Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Building Permi0 Wastewater Impact Fee (100% due prior to Council Approval) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Water Meter Fee (Lots) (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation) (100% due at Issuance of Water Meters) Water Meter Deposit (100% due at Issuance of Building Permio Escrow (see separate agreemen0 AMOUNT DUE PRIOR TO TOTAL COUNCIL ASSESSMENT APPROVAL $11,700.00 $ 11,700.00 $ 400°00 -0- $ 3,600.00 $ 3,600.00 $ 50.00 -0- $ 7,805.10 -0- $157.00 --0- $ 140.00 -0- N/A TOTAL TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $23,852.10 $ 15,300.00 + Construction Inspection Fee (2% of Project Cost due prior to preconstruction meeting). COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: The following project. November 18, 1993 Ken Griffin, City Engineer P.E. Howard L. Pafford, Utilities Superintendent Development Fees for M. J. Designs Warehouse fees should be assessed on the above referenced Water Impact Fee: 1 2" Domestic Meter/s = 8 ESU's 1 1%" Irrigation Meter/s = 5 ESU's 2 - 10" Fireline Meter/s = 5 ESU's Total 18 ESU's @ $650.00 ea = $11,700.00 100% due prior to Council approval of final plat. Wastewater Impact 1 - 2" Residential meters = 8 ESU's Total 8 ESU's ~ $450.00 ea = $3.600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each = $ 400.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee 1 lots ~ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic/Fire) 1 2" Domestic Meter 2 10" DDC Fire Meters $205.10 ea = $205.10 $3,800.00 ea = $7,600.00 Total = $7,805.10 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 1 - 1%" Irrigation Meters ~ $157.00 ea = $157.00 100% due prior to issuance of water meters. Water Meter Deposit 4 meters ~ $35.00 ea = $140.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xc: Steven G. Goram, Director of Public Works M.J. Designs Warehouse File Director of Public Works FEES/MJDESIGN.HLP