Park Place-CS 930205 COPPELL~4ORANDuMPUBLIC WORKS
Eebruary 5, 1993~ ~//' .
Doug Stevens, Engineering ~
Howard L. Pafford, Ut~ ~endent
The following fees should be as~d collected on the ~ove
referenced project.
Water Impact Fee:
Irrigation Meter/s = 2.5 ESU's
1 - 1 1/2" Irrigation Meter/s = 5 ESU's
100%
Water Tap Inspection Fee Paid 8/29/91 &
2 Connections @ $100.00 each = $200.00
100% due prior to issuance of meter/s.
Water Meter Fee (Irrigation) Paid 8/29/91
I - 1" Irrigation Meter/s 0 $61.00 ea =
I - 1 1/2" Irrigation Meter/s 0 $157.00 =
Total =
100% due prior to issuance of water meters.
Irrigation - Meter Deposits ($35.00 paid 11/19/91)
2 meters @ $35.00 ea = $70.00
100% due prior to issuance of water meters.
HLP/dm
cc: Steven G. Goram, Director of Public Works
Total 7.5 ESU's ~ $650.00 ea = $4,875.00
due prior to Council approval of the final plat.
11/19/91
& 11119/91
$61.00
$157.00
$218.00
PARKPLCE