Park West CC(2)-CS 971224TheCity With A Beautifu
P,O. Box 478
Coppell, Texas 75019
214-462-0022
December 24, 1997
Ed McGuire
Bob Moore Construction, Inc.
1110 N. Watson Road
Arlington, TX 76011
Paragon Phase II
Final Acceptance
Dear Mr. McGuire:
A final inspection of paving and utilities for the referenced project has been confa'med by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received fi.om the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control
Bond will also be two years from the date of this letter.
Sincerely,
Construction Inspector
CCi
Supt. of Public Services
Crreg Jones, Chief Building Official
Travis Cramp, Fire Marshal
Jun Maddox, Maddox Const.
s/0finalac.l~r