Loading...
Park West CC(2)-CS 971224TheCity With A Beautifu P,O. Box 478 Coppell, Texas 75019 214-462-0022 December 24, 1997 Ed McGuire Bob Moore Construction, Inc. 1110 N. Watson Road Arlington, TX 76011 Paragon Phase II Final Acceptance Dear Mr. McGuire: A final inspection of paving and utilities for the referenced project has been confa'med by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received fi.om the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincerely, Construction Inspector CCi Supt. of Public Services Crreg Jones, Chief Building Official Travis Cramp, Fire Marshal Jun Maddox, Maddox Const. s/0finalac.l~r