Park West CC(2)-CS 971205COPPELL STBEETS DIVISION
~ATE:
TO:
FROM:
RE:
December 5, 1997
Larry Davis, Construction Inspector
Brent Adams, Streets Division
Walk-thru Paragon, December 4, 1997
Listed below are Street Division comments relative to walk thru.
1. Patch & seal curbs-west side (both sides).
2. Rout & seal random crack west side west drive.
3. Patch crub gouge near above random crack.
4. Remove & replace over cut of curb east drive east side.
Seal around concrete replacement on east bound Southwestern.
Seal areas marked with white paint. CAUTION!! Do not saw
through existing sealed cuts. There are traffic signal wires
in the cut.
MESSAGE
CONF I RMAT I ON
12~05×97 15:01
ID--CITY OF COPPELL
DATE
12/05
S,R-TIME
00'52"
DISTANT STATION ID MODE PAGES RESULT
CITY OF COPPELL CALLING 03 OK 0000