Loading...
Park West CC(2)-CS 971205 (2)COPPELL UTILITIES DIVISIO~ DATE: TO: FROM: RE: Dece~r 5, 1997 Larry Davis, Construction Inspector Tyler Tatham, Utilities Division Walk-thur Paragon Phase II Listed below are Utility Division comments relative to walk thru· 1. Southwest sewer access needs to be cleaned out, dirt and rocks were holding inside manhole. Inside vault, support pillars need to be installed under meter and doublecheck and valve. MESSAGE CONF I RMAT I ON 12/05~97 15: 01 ;D--CITY OF COPPELL DATE 12/05 S,R-TIME 00'52" DISTANT STATION ID MODE PAGES RESULT CITY OF COPPELL CALLING 0~ OK 8880