Loading...
Park West CC(2)-CS 97061807~4797 14~04 CiTY OF COPPELL ENGiNEERiNG ~ CiTY OF COPPELL NU. ~4~4U DEVELOPMENT FEES F~OJECT NAME: Park West Commerce Center Lot 1R & 2~, bleak 2, {Paragon Group, Phase Ill I ill:. NGiNEER: Pa~heco Koch II! E!v s oN D^ E= ,,, II SENT ASSESSMENT ...... ASSESSED FEE ~MOU~ PAID DATE Fee 5/20/g7 Water Impact Fee $5,850.00 $5,850.00 613197 93,600.00 6/3197 5/20/'97 Wastewatar Impact Fee $3,600.00 Street Sign Street Ligl~t notify street dept, 5/20/97 Construction Inspection Const. Inspection (on-site) Const. inspection (paving) Roadway Impact-Zone 94,000.00 $4,000.00 4/17/97 96,924.84 $6,924.84 6/3/97 $8,520.00 $8,520.00 6/18/97 $29,222.21 $29,222.21 6/3/97 Street Cut Permit Overtime Inspection 9100.00 $100.00 6/4197 Water Tap Inspection Wastewater Tap Inspection Water Meter {Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit {Fire/Irrig) Utility Final Inspection TOTALS Total Fees $58,217.05 Notify Linde Hayes & utility department when meters, taps, & deposits are paid Fees Paid $58,217.05 NOTES Amount Owed 90.00 Prior To Construction Erosion Control Approved E.P.A.-N.O,I. Recd, Const. Plan Approved IrrigatiOn Plan Recd. Prior To Final Acceptenoe As Built Plan Recd. Paving Bond Recd, Utilities Bond Recd. Irrigation Plan Approved Erosion Control Meint. Prep,~ir e,d by t Appr,o ve,d by IF::UND= CITY OF COPPELL JOURNAL ENTRY DATE: J.E. NO. ..... POSTED BY: DATE: ... DESCRIPTION ACCOUNT DR. CR. NUMBER ~'~ / ~ ~/~ ~ ~. 14:~4 CITY ~)~F COPPELL ENGINEERING -~ CITY OF COFFELL city of coppell fee schedule ~ ~total city fees Impact fees $38,672.21 ;beck inspection fees impact fees onsite public utilities $2,272.44 onsite private utilities $4,652.40 onsite utilities permit offsite public utilities $10,549.80 paving permit publi~ paving $320.00 offsite utilities pen"nit private paving $8,200,00 saw cut permit $100.00 building permit ~ saw cut permit pem~it fees $43,748.25 $108,$15,10 I s3_l/Ig. MOJ data $38,672.21 6/2/97 $6,924.84 6/2./97 $8,520.00 6117/97 $10,549.80 $43,748.25 6/2J97 $100.00 6/3197 Page 1 :RETE INC. Golden Trowel Awsr~ Winner June 2, 1997 Mr. scot= S~Clair Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texae 76011 RB: pa~K ~ST Dear Glenn: AS per your request please find listed below the Schedule o~ Values for approaches on the above referenced project. Public Work Cost $ 8,000.00 priva=e ~ork Cos~ $ 410,450.00 Please review the above and call me if you have any questions. Sincerely, ~ CONi~q]lTli CO., INC. Bobby ~. Xarr$s '. A 4820 Gretna Oallaa, Texas 75207 Office 214-630-2191 FAX 214-6g,~- 1066 ~$5'00 $8,520.00 BOB MOORE CONSTRUCTION, INC. 11'10 N. WATSON RD. ARLINGTON, TEX~. $ 044175 WF.~L~ FARGO ~ANK ~) NA. FO. ~OX DALLAS. TX PAY TO THE ORDER OF: DATE 6/17/97 ~**EI~{T THousAND FIV~ hUNDRED T~I~T~ DOLLArs AND 00/100.** CITY OF COPPELL "'ONN & ? AMOUNT $8,520.00 BOB MOORE CONSTRUCTION. INC.