Loading...
Park West CC(2)-CS 970421The City With A Beautiful Future. P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 21, 1997 James Koch, P.E. Pacheco Koch Engineers, Inc. 9401 LBJ Freeway, Suite 300 Dallas, Texas 75243 Parkwest Commerce Center (Paragon Group) Final Acceptance Dear Mr. Koch A final inspection of paving and utilities for the referenced project has been confu'med by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of thi.~ letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincerely, Construction Inspector c¢: Ken Griffin, P.E., Dir. of Engineering & Public Works Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Travis Crump, Fire Marshal Doug Stevens, Engineering Technician Ed. T. McGuire, Bob Moore Const., Inc. / FAX # (817) 640-1250 file/ldavis/paragon.fin