Loading...
ST9301-CS 940504DALLAS COUNTY PUBLIC WORKS May 4, 1994 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 -- 255 Parkway Coppell, Texas 75019 Sandy Lake Road -- Project No. 91-830 (MacArthur Boulevard to Coppell City Limit) Dear Mr. Griffin: The consulting engineers Sverdrup Corporation, have submitted their complete preliminary paving plans, cross-sections and drainage area maps along with their right-of-way plans, right-of- way parcel plats and descriptions. Forwarded with this letter are two sets of each of these plans and documents and the previously reviewed marked set of plans. Please initiate a detailed review of these plans particularly the paving grades as to their conformity with the requirements of the City of Coppell. I would ask that you make every effort to provide a turn around of these plans by June 3, 1994. Return one set of these plans and documents with your comments along with the old marked set. The other set may be retained for your information and files. Sincerely, B~J:vjm ~ 9~I-830:\PLAIq$.LTR 411 Elm Street Dallas, Texas 75202 653-7151