Park Place-CS 910410COPPELL PUBLIC WORKS
DATE: April 10, 1991
TO: Larry Davis,
FROM:
RE: Park PI
MEMORANDUM
Construction
Superintendent
ir Test Results
Per the discussion at our meeting with Greg Strudwick on Friday
afternoon, I have done some research to determine what the air
testing method should be for this project and future projects.
Based on the information I have obtained I feel that the C.O.G.
standard specification for air testing is sufficient.
I will continue to research this matter and determine if there is
a need to deviate from the standard and if so we can incorporate
the new requirement in the design criteria for the City.
If you have any questions regarding this matter please advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works