Loading...
Park Place-CS 910410COPPELL PUBLIC WORKS DATE: April 10, 1991 TO: Larry Davis, FROM: RE: Park PI MEMORANDUM Construction Superintendent ir Test Results Per the discussion at our meeting with Greg Strudwick on Friday afternoon, I have done some research to determine what the air testing method should be for this project and future projects. Based on the information I have obtained I feel that the C.O.G. standard specification for air testing is sufficient. I will continue to research this matter and determine if there is a need to deviate from the standard and if so we can incorporate the new requirement in the design criteria for the City. If you have any questions regarding this matter please advise. HLP/mp cc: Steven G. Goram, Director of Public Works