Park West CC(02-2)-CS050614DEVELOPMENT FEES
IPROJECT NAME:
[ENGINEER:
IORIGINATION DATE:
SENT ASSESSMENT
6/14/2005 Water Impact Fee
Wastewater Impact Fee
Park Fee
7/5/2005 Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
,Subtotal to Eng.
TOTALS
Park West Commerce, Lot 2R-3, Block 2 II
Pacheco Koch
II
6/14/2005 REVISED
ASSESSED FEE AMOUNT PAlE DATE
$7,42O.00
$4,480.00
$0.00
$23,055.00 $23,055.00 rb 7~8~2005
$22,914.22 $22,914.22 rb 7/15/2005
$3,840.00 $3,840.00 rb 6/29/2005
$250.00 $100.00 di 7/27/2005
$150.00 di 8~8~2005
$100.00 $100.00 di 8/8/2005
$423.44 $423,044.00 di 8/8/2005
$6,954.14 $6,742.42 di 7/27/2005
$211.72 di 8/8/2005
$60.00 $60.00 di 8/8/2005
$90.00 $60.00 di 7/27/2005
$30.00 di 8/8/2005
$100.00 $100.00 di 8~8~2005
$49,809.22 $49,809.22 $0.00
Total Fees Fees Paid Amount Owed
$69,686.80 $480,407.36 ($410,720.56)
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.