Loading...
Park West CC(02-2)-CS050614 (2)DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIG NAT ON DATE: Park West Commerce, Lot 2R-3, Block 2 Pacheco Koch 6/14/2005 REVISED SENT ASSESSMENT ASSESSED FEE AMOUNT PAlI- DATE 6/14/2005 Water Impact Fee $7,420.00 Wastewater Impact Fee $4,480.00 Park Fee $0.00 7/5/2005 Roadway Impact-Zone - $23,055.00 $23,055.00 rb 7/8/2005 Street Sign Street Light Construction Inspection $22,914.22 $22,914.22 rb 7/15/2005 Street Cut $100.00 $100.00 rb 8/16/2005 EG or Bore Permit $3,840.00 $3,840.00 rb 6/29/2005 Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection $250.00 $100.00 di 7/27/2005 $100.00 $423.44 $6,954.14 $6,742.42 di 7/27/2005 $6O.OO $90.00 $60.00 di 7/27/2005 $100.00 .Subtotal to Eng. TOTALS $49,909.22 $49,909.22 $0.00 Total Fees Fees Paid Amount Owed $69,786.80 $56,811.64 $12,975.16 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.