Loading...
Park Place-CS 891103Mr. Shohre Daneshmand Public Works Department City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 DAI',I M. DOWDEY & ASSOCIATES CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 November 03, 1989 Re: Preliminary Plat (90 Lots) Park Place Addition, Coppell, Texas Dear Shohre: In response to your con~ents dated October 31, 1989, I am revising our preliminary utility plans to reflect your concerns. Below is my response to said comments. 1. The R.O.W. at Sandy Lake Road was 60' prior to any dedication. When Sandy Oak Addition was platted, they granted 30' of R.O.W.. We are proposing an additional 25' along our client's Southern property line. The total R.O.W. will be 115' after dedication, which is in excess of the~ required 110 feet. 2.Regarding M~~. Howard Pafford's comments; I have calculated the water and sanitary sewer uses and have shown them on the attached plans. 3. We have revised the manhole placement to reflect the maximum manhole separation and the requested valves with the exception of the inter- section of Allencrest and Park Valley, see plan for details. I have also straightened-out the sanitary sewer alignments as requested, however I disagree with your requirment for the following reasons. a. The sanitary sewer is more easily repaired when it consistently fol- lows the curb line ~ue to a more uniform sawcut (if ~equired at ~%~ ~1/ b.In a shbdivision a curved alignment concentric with the pavement cen- ter line is as easy to locate as straight alignments. c.As long as the minimum radius is greater than 200 feet (for 8" mains) there is no adverse affect on the pipe. d. It is easier to eliminate conflicts with property lines, water meter and water services, storm sewers and inlets and utility lines if the sewer main is a uniform distance from the back of curb. e. Some of these problems c~n be worked-out during the final design ~ta~Z therefore, they are not as critical at thzs t~me. ~ ¢~ November 03, i989 Page 2 Mr. Shohre Daneshmand 4. Regarding Mr. Richard Diano's comments; the common area located at the Northwest corner of the tract will be dedicated to the Homeowners association. If I have not addressed all of your concerns, please let me know. Very truly yours, ~. William A. Anderson, P.E. WAA:hc Enc. TO DAN M. DOWDEY & ASSOCIA', CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 ATTENTION WE ARE SENDING YOU 'i:~Attached [] Under separate cover via [] Shop drawings ~'15rints [] Plans [] Sar [] Copy of letter [] Change order [] COPIES DATE NO. ~ ---- DESCRIPTION THESE ARE TRANSMITTED as checked below: ~For approval [] For your use [] As requested [] For review and comment [] FOR BIDS DUE [] Approved as submitted [] Approved as noted [] Returned for corrections 19 REMARKS [] Resubmit.. copies for approval [] Submit_. copies for distribution [] Return corrected prints __ [] PRINTS RETURNED AFTER LOAN TO US COPY TO