Loading...
Historic Coppell-CS051130 HAMI£ TON CONSUL TING Civil & Environmental Engineers · Planners · Construction Managers November 30, 2005 Charlene La Mattina, E.I.T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-7041 RE: Historic Coppell Properties Addition/Lots 1 & 2, Block 1 Construction Plan Review Comments #2 Dear Ms. La Mattina: This letter and revised attached plans shall serve as our response to your comment letter dated November 14, 2005. We have responded to your comments as follows: Grading Plan: Will any measures be necessary to prevent erosion at the locations where rtm-offwill flow over the edge of pavement into the proposed drainage swale? We have included measures for Rock Rip-Rap per attached plans as well as silt fencing and rock berms. Drainage Area Map: Coordinate with the City of Coppell Parks Department regarding the construction of the proposed drainage swale and proposed grading south of the site. Provide documentation of that department's approval of the proposed grading work including the removal of any off-site trees. The portion of the swale conveying drainage toward Bethel Road should be designed through Lot 2 instead of the adjacent lot. Per our meeting last week with City Staff, we have adjusted our grading so that it does not affect the Park property. All drainage has been redirected through Lot 2 toward Bethel Road. A temporary drainage swale has been designed which minimizes tree removal through Lot 2. The proposed storm drainage within the future Bethel Road Improvements will have to be extended further east than planned currently so that future storm drainage (which will replace the temporary swale) from Lot 2 can tie as Lot 2 develops. Utility Plan: Remove the leader from the note that refers the contractor to the standard details for asphalt repair. This note applies to the sewer line installations also. Done. 601 Harwood Road' Hurst, Texas 76054 Phone: (817) 268-0408 Fax: (817) 284-8408 Ms. Charlene La Ma#ina, E.L T. Page 2 Historic Coppell Properties Addition/Lots 1 & 2, Block 1 November 30, 2005 We hope this letter and attached revised plans address all of your concerns. We have included your requested three (3) sets of revised plans along with five (5) additional sets for your approval and stamp. Please hold on to these extra copies as we have instructed the contractor to pick up City Approved and Stamped plans from your office. Please contact my office at 817-268-0408 if you have further questions. Sincerely, HAMILTON CONSULTING Keith Hamilton, P.E. Attachments (1) Mark-ups (2) Eight (8) sets of revised plans