Loading...
ST9905-CS051110 (2)Charlene LaMattina - Re: Cost for Duke requested Bethel Improvements ........................... Page From: To: Date: Subject: Keith Marvin Barclay, Bruce 11/10/2005 4:22:02 PM Re: Cost for Duke requested Bethel Improvements Bruce, We will reconcile the amount due when we open bids for Bethel Road. Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppell.tx.us >>> "Bruce Bamlay" <Bruce. Bamlay@dukerealty.com> 11/09/05 4:14 PM >>> Keith, I've analyzed the cost estimate and believe we are on the high side. According to my estimate we are somewhere around $20,000 high if you count the 7% contingency. Therefore what I would like to do is wait until the Bethel Road project is bid out and pay you for the actual costs of these additions. Let me know if you have any questions or would like to discuss. Thanks, Bruce S. Barclay - Project Manager Duke Construction Phone: 972-361-6700 Direct: 972-361-6743 Fax: 972-361-6800 Cell: 214-878-3426 www.dukeconstructiononline.com CC: jevans@pkce.com; LaMattina, Charlene October 14, 2005 Bruce S. Barclay Project Manager 5495 Belt Line Rd Suite 360 Dallas, TX 75254 RECEIVED OCT 2 0.2005 Re: Bethel Road Median Cuts Dear Mr. Barclay: In reference to our meeting last week, Minyard Food Stores, Inc. has no intention of requesting a median cut at our employee parking lot on Bethel Road. If we can be of any further assistance please let us know. Best regards, Minyard Food Stores, Inc. Real Estate ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Project Name: Freeport XlV & XV Costs Associated w/City Infrastructure Improvements Prepared By: Pacheco Koch Consulting Engineers (CA J) PK No.: 2052-05.217 Date: 101312005 Paving Costs Item I Price ~ Total Price Median O[3enln~s/Decel. Lane I 485 SY 7" Reinf. Conc. Pavement (3000 psi) $40.0£ $19,400.00 2 485 SY 6" Lime Stabilized Base $6.0£ $2,910.00 3 6.55 TN Hydrated Lime (6%) $105.0£ $687.49 4 300 SF Colored Stamped Concrete $6.0C $1,800.00 Sidewalk Costs 5 5700 SF 4" Concrete Sidewalk (5' Width) $2.80 $15,960.00 6 7 EA Pedestrian Access Ramps $500.00 $3,500.00 Sub-Total $441257,49 Drainage Costs No. Quant. Unit Description Price Total Price 7 103 LF 18" Class III Storm Sewer Pipe $38.00 $3,914.00 ~ ~=~,~. ~ ~~~ Difference $440.00 11 -300 LF 24" C~ass III Storm Sewer Pi~)e $45.00 ($13,500.00 rt ~¥;,;~L~;~:~ Difference ~6~9n-n- O0 13 -235 LF 21" Class III Storm Sewer Pi~e $40.00 ($9,400.00: 15 -305 LF 21 · Class III Storm Sewer Pipe $40.00 ($12,200.00', ~ ~ ~ ~,~,~:~/:~, ~ ~, ~ Sub-Total $19,124.00 I Keith Marvin - RE: Bethel Road/Freeport XlV & XV Storm Tie-ins Page 1 ] From: "Bruce Bamlay" <Bruce. Barclay@dukerealty.com> To: "Bruce Bamlay" <Bruce. Bamlay@dukerealty.com>, "Kenneth M. Griffin (E-mail)" <kgriffin@ci.coppell.tx. us>, "Garry D. Kraus (E-mail)" <gdkraus@transystems.com>, "Keith Marvin (E-mail)" <kmarvin@ci.coppell.tx.us> Date: 9/30/2005 9:03:12 AM Subject: RE: Bethel Road/Freeport XIV & XV Storm Tie-ins This should have been attached to the previous email. I apologize for any confusion. <<Bethel Road Escrow Letter to Coppel1092905.PDF>> > ..... Original Message ..... > From: Bruce Barclay > Sent: Friday, September 30, 2005 8:46 AM > To: Kenneth M. Griffin (E-mail); Garry D. Kraus (E-mail); Keith Marvin (E-mail) > Cc: Jeff Turner; Jeff Thornton; Teddy Peinado; Chad A. Jackson (E-mail); Jack Evans (E-mail) > Subject: Bethel Road/Freeport XlV & XV Storm Tie-ins > Ken, > Attached you will find a copy of our response to your letter regarding the Storm Sewer Tie-in's at Bethel Road. Also included is a copy of your original letter and the signed proposal from TranSystems. Originals are being Fed X'd to you and TranSystems today. > > Per our attached letter, we will determine a dollar amount for these upgrades as soon as TranSystems has completed their revisions. We will then review and come to agreement on the dollar amount and place in escrow with The City of Coppell as requested. > > It is now my undemtanding that we may move forward with the construction of utilities for Freeport XIV & XV once we address any comments your department may have during the review. I spoke with Keith yesterday and I believe your initial review is almost complete and comments should be forwarded shortly. > If you have any questions or wish to discuss this further please call me at my office or on my cell. > Regards, > Bruce S. Bamlay - Project Manager > Duke Construction > Phone: 972-361-6700 > Direct: 972-361-6743 > Fax: 972-361-6800 > Cell: 214-878-3426 > www.dukeconstructiononline.com CC: "Jeff Turner" <Jeff. Turner~dukerealty.com>, "Jeff Thornton" <Jeff. Thornton@dukerealty.com>, "Teddy Peinado" <Teddy. Peinado@dukerealty.com>, "Chad A. Jackson (E-mail)" <cjackson@pkce.com>, "Jack Evans (E-mail)" <jevans@pkce.com> D' 'ke CONSTRUCTION September 29, 2005 The City of Coppell 255 Parkway Blvd. Coppell, TX 75019 ATTN: Engineering Dept. Re: Bethel Road 1- ST 99-05~Freeport XIV&XV Duke Project No. FPNO14-000 To Whom It May Concern: In response to your letter dated September 21,2005 from Kenneth M. Griffin to Craig Bond of TranSystems (letter attached) Duke Construction, L.P. agrees to pay for engineering and construction costs required for the tie-in of storm sewer from the Freeport XIV & XV site to the future Bethel Road storm drainage system. In addition, Duke agrees to pay for approximately 1,200 linear feet of 5' sidewalk to be constructed by The City of Coppell with the Bethel Road I project. To ensure funding for the above, Duke Construction will place in escrow a dollar amount based upon a scope of work and estimate prepared by Pacheco Koch Consulting Engineers and agreed upon by both parties. This estimate will be prepared upon TranSystems' completion of the Bethel Road I plan revisions required for the tie-in. If in the event actual construction costs vary from the escrow amount either Duke Construction shall pay the overage amount or be issued a refund check by The City of Coppell for the remaining escrow balance. Should you have any questions regarding this matter, please do not hesitate to call me at the office at (972) 361-6743. Sincerely, Brace S. Barcla~~ Project Manager - Duke Construction Encl: Letter from Kenneth Griffin dated 9-21-05 TranSystems Signed proposal cc: JeffTumer-Duke Realty Corporation Teddy Peinado - Duke Construction, L.P. Chad Jackson - Pacheco Koch Jack Evans - Pacheco Koch File 5495 Belt Line Road Suite 360 Dallas, TX 75254 972.361.6700 www. dukerealty, com Atlanta Chicago Cincinnati Cleveland Columbus Dallas Indianapolis Minneapolis Nashville Orlando Raleigh St. Louis Tampa 09/Z9/2005 X6:07 FAX 9TZZS097t~ TRANSY$'I~M$ DALLAS 1~1002 Septmnber29,2005 Mr. Brace B~cla~ Dulm Construotio~ 5495 Belt Lia~ Road, Suite 360 Dallm, TX 75254 Pax: 9'7~361-6800 ~ Agreement fm Civil Engineering Bethel Road Pbm Rovisions Copp~ll, Texas This k-tier d~alls tim sci'vices TranSysi~ms proposes m ~ ~ Du~ ~ns~fl~ in ~ wi~ ~ ~ ~ ~g ~ w~ch Tmn5~ pmpo~ to ~ ~e~ ~ ~ ~h~e f~ c~pl~ng ~ ~s ~ ~ ~o~ u~ w~ ~ h~ ~d ~is ~. If ~ ~s~ ~ In ~s l~r ts ~le to ~ ~o~ ~Sys~ ~ th~ ~ ~ ~ i~ ac~~ ~ ~s ~ by ~ ~s 1~ ~t in ~ sp~ ~d ~iow. 9COPE Ol~ 5ERVICE~ In co~nectio~ with the above mfemlccd Plojzct~ TranSystems shall r~vise ~he City of Coppell's Befiizi Road Plans to includ~ r~visimls to Storm Drain ~ "D** and g~ ~ ~ ~ mM~ Th~ revi~iorm to Storm Drain Line "D' will inolude, th~ add/tion of two new ]aramis, the r~ceation/mod/fic~tion of two p~ lammls md tho upsizin~ of {h~ pwpowi trunk line ~ccnmr~'~dam ~o inca~ased flow. The~ changes will involve modifications to: · Pavi~g Plan & Profile Sheets 19-21 · Storm Drain Plan & Profile Sheets 54-56 · Sro, ,-.-, Drain ! ~*t*~al Shcet ~8 In s~lition to the above sh~e~s, thc follow~$ sheets will also n~ W ~ m~scd W mfl~t ~e * ~1 P~t Sh~ 3 , ROW ~sifi~ Sh~ 8 09/29/2005 16:07 FAX 9722809715 _'.~3¥~t*',f~$ DALLAS 1~003 Box Culvert ?lan & Profile Sheets $9-61 SWPPP Shem 67 Traffic Coniro] Plan $1iects 69, 71, '/3, 75, 77 & 79 Signiag 8: Buttoning Sheet 80 s Lm~dscspePlenSbeets 113-114 · Inigsfion Plan Sheets 121-122 Trm~ys~ms will r~vtse the City of Coppell Bethel Road Plans as described above. We [wopose to provide the ~:~-,,meati~ asfviccs on mi hourly besis, in accordance with gte attached ram schedule, for a fcc not to exceed $~,105.00. ~ not included in th%se proposals ~e: . . 1. Reimbursable expenses such as mileage, oveimi~ht mail, prinling, reproduction a~. sales tax (these will b~ billed at cos0 ~i¥oic~ will b~ sent monthly and will be based on Tra~Systems' estimate of the total se~es . completed as of the ti~e of billing., $c:m~ULB Tr~ystems will ~ a project schedlllc as pal~ of this contrsct to bo mutually ~ upcm by bo~ pmiies. We i~x~mtz~ yom:need ~o haw, tbeso'Serviccs comvleted as soon as po~iiblc and Tr~n.qyst~ns' will compleie these services in u ~mely mann~. (iW_,N~ PROVISIONS Attached to end medca pm! of u~is LeUe. r Asreemegn is a copy of TranSystems' Cteneral Provisions. Duke C~on stat Tra~ystems uhd~,~ami and a~ee that the O~ner~l Pmvialons me a p~ of this L~r ASreemcnt and th,,, .each' are bound, by roms and condilions set forth in ~ha C, ea~al ProVisions. I~ the cvcnt ~uu thare is any inconsistency or conflict between the t~ns ,md co~diti.lms sci forth in this ~ Age,racet end the General Provisions, the h~,-,~i nd conditions set fo/th in this Lctter AEmeanoht shall coatrol. The proposal o~tlinexi iv Ods I. Jotter is valid for 30 days. 09/29/Z005 16:07 FA][ 972Z80971~ TRAN$¥~S DALLAS [~004 We sincerely appreciate the o~ity to work with Duke Coflstmclion on this ProjccC ff you cobb'ur with the proposal outlined in this Lett~ of A~t. plmsc execute the e~closed extra copy and ~eturn it to Trm~yst~ms, Unlmm othm~vlsc irmr~ctcd by Duke Co~sh-uctio~ in writing at the time you return the executcd copy of chis Letter A~m~t, TranSysterm will consider tim cxecutcd Letter Ag~ccmemt as our notice to' proceed., pre, mc let us lmow if you have any q~es6OllS or ueed m~y ft~er infor~aticm. CONSULTANTS the foregoing Letter Agreement. Duke Construction: accepts and agxm~$ to the 'terms and conditions of tho fm~go~n--g Letter Agt~-m. eut (includin8 the tcams and conditions set foI~h thc Omlmal Provisions attached hexeto.) ~uke Constn~on 09/29/2005 16:07 FAZ 9722600715 TranSystems Corporation Consultants 3o~o LBJ Freeway, SuM 900 Delia.,. Texas 75 .2~34. (972) 280-9300: . (Sohedule ofHoarly ~tm. of ..~azy 1, 20OS) $ 210.00 $ !05.00 $ ' 85.00 $ .150.00 $ 125.00 $ ' 80.00 , $ · 80.00 S ,65.00 · S 115.00 · $ ?o.oo $ 60.00 '$ 50.00 · $ .100.O0 · $ - 75.0O S 55.00 $ 45.00 · $ 160.00 $ 175.00 · $ j t40,00 $ . ~oo.oo $ ~.00 $.. 80.00 · $ 65,00 · $ S5.0O · $ ' 70.00 , $ 55.00 $ , 50.00 · S 45.00 · $ 40.00 , $ . 35.00 09/29/2005 16:07 FA~ 9722809715 GENERAL PROVISIONS between ~ ("C, LJF_.NT") ~nc~ ~ANSY81'F-.MS OORPORATK)N t'; r~ANSYSTEMS") in reel~at ~ the project t,~ter Agmemem), as folows: SECTION 2: CUENI"~ NF.~M}N~IIILITII~ SECTION 3:PEFIIOD8 OF: BERYH2E i ~ eubmitm~g i0) dey~ Idler 5Yb"I--cM8 at em, unUl the ~7) ds~u wdl~n nalloe to CUENT, nusge~d uee/,ae~ under 1hie Agreement unlll TRAN8~s -:MS Im~ bee~ Pald in ~ ~1 ~un~ ~e ~ 09/29/2005 10:08 FA]: 9722809716 DAlLAs ~1007 m, relxXt~ hOWeVer, ih'rout wdaen * ~,y, to )~, RANTIE..~ OF equipnwm ~ ~vd ~,r. 09/29/2005 16:08 ~,A~ 9722809715 TI~STI~MO ~ALLA$ ~Ec"rloI46: ~I[~CIA~- PROVISIONS; mplammmnt [ Suzan Taylor - Bethel Road ............. Pag_e~ From: Suzan Taylor To: jevans@pkce.com Date: 9/26/2005 4:29:22 PM Subject: Bethel Road Jack: During our meeting with Duke and TranSystems we discussed the upsizing of Line D and the changes to the plans associated with that. In a previous meeting with Brook Barefoot, he indicated that Duke wanted median cuts and the ddves added to the plans as well. TranSystems is unaware of any changes other than upsizing the line. Do you know if Duke wants the median cuts and drives added to the plans - is that something they are going to work with TranSystems on? Thanks I Suzan Taylor - RE: Bethel Road Storm Coordination with Freeport Project Page From: To: Date: Subject: "Bruce Bamlay" <Bruce. Bamlay@dukerealty.com> "Bruce Barclay" <Bruce. Barclay@dukerealty.com>, <ccbond@transystems.com> 9/26/2005 1:06:07 PM RE: Bethel Road Storm Coordination with Freeport Project As you are already probably aware, the city has given us the go ahead for the storm tie-ins at Bethel. Please let me know cost and how soon you can have the plans revised for submission to the City. I'm hoping we can get this revised quickly in order to avoid any delays in receiving plan approval from the Engineering Dept. Please call me if you would like to discuss. Regards, Bruce S. Barclay - Project Manager Duke Construction Phone: 972-361-6700 Direct: 972-361-6743 Fax: 972-361-6800 Cell: 214-878-3426 www. dukeconstructiononline.com .... Original Message ..... From: Bruce Barclay Sent: Monday, September 19, 2005 9:50 AM To: 'ccbond@transystems.com' Cc: kgriffin@ci.coppell.tx.us; staylor@ci.coppell.tx, us; gdkraus@transystems.com; Chad A. Jackson (E-mail); Jack Evans (E-mail) Subject: RE: Bethel Road Storm Coordination with Freeport Project Craig, Thanks for the update. We will wait for your response. BB .... Original Message ..... From: ccbond@transystems.com [mailto:ccbond@transystems.com] Sent: Monday, September 19, 2005 9:38 AM To: Bruce Barclay Cc: kgriffin(~ci.coppell.tx.us; staylor@ci.coppell.tx.us; gdkraus@trensystems.com Subject: RE: Bethel Road Storm Coordination with Freeport Project Bruce, We prepared and sent a letter to the City last week summarizing the drainage conditions (once the Bethel Road drainage improvements are installed), and how your request would impact those conditions. We wanted to hear back from the City before we proceeded with any changes I Suzan T~lor - RE: Bethel Road Storm Coordination with Freeport Project Page 2 I to the plans. I spoke with Suzan Taylor this morning and she is going to touch base with Ken and prepare a response indicating how the City would like us to proceed. I'll follow-up with you once I get their response. Thanks. Craig Bond ..... Original Message ..... From: Bruce Bamlay [mailto:Bruce. Barclay@dukerealty.com] Sent: Monday, September 19, 2005 7:41 AM To: Bruce Barclay; DL-Charles Bond; DL-Garry Kraus Cc: Jack Evans (E-mail); Chad A. Jackson (E-mail) Subject: RE: Bethel Road Storm Coordination with Freeport Project Craig, We never heard from you last week regarding the Bethel Road storm tie-in. Please let us know something ASAP. We will begin utility installation shortly and need your blessing on the design. We have researched this on our end and there shouldn't be any issues but we must have your input before proceeding. We truly appreciate your helpwith this. Ifyou haveany questions or would like to discuss please call me at the office or on my cell. Regards, Bruce S. Barclay - Project Manager Duke Construction Phone: 972-361-6700 Direct: 972-361-6743 Fax: 972-361-6800 Cell: 214-878-3426 www.dukerealty.com <<Bruce Barclay.vcf>> > ..... Original Message ..... > From: Bruce Barclay > Sent: Monday, September 12, 2005 9:27 AM > To: 'ccbond@transystems.com'; 'gdkraus@transystems.com' > Cc: Jack Evans (E-mail); Chad A. Jackson (E-mail) > Subject: Bethel Road Storm Coordination with Freeport Project > Good morning gentlemen, > I just wanted to send an email with my contact information and touch base. > I look forward to hearing from you in a couple of days regarding our storm tie-in. > Your help with this is greatly appreciated, > Bruce S. Barclay - Project Manager > Duke Construction > Phone: 972-361-6700 > Direct: 972-361-6743 I Suzan Taylor; RE: Bethel Road Storm Coordination with Freeport Project > Fax: 972-361-6800 > Cell: 214-878-3426 > www.dukerealty.com > << File: Bruce Bamlay.vcf >> CC: <kgriffin@ci.coppell.tx.us>, <staylor@ci.coppell.tx.us>, <gdkraus@transystems.com>, "Chad A. Jackson (E-mail)" <cjackson@pkce.com>, "Jack Evans (E-mail)" <jevans@pkce.com> COPP-ELL September 21, 2005 Mr. Craig Bond, P.E. TransSystems Corporation 3010 LBJ Freeway, Suite 990 Dallas, Texas 75234 Bethel Road I ST 99-05 Pacheco Koch / Duke Construction Drainage Request Dear Mr. Bond: The city has reviewed your letter dated September 13, 2005 regarding Duke Construction's request to discharge storm water from the parking lot of two proposed buildings into the currently designed drainage system for Bethel Road. Your findings indicate that the proposed storm water discharge can be accommodated through the upsizing of Line D and that the 25-year capacity of the four 10' x 5' box culverts is sufficient to handle the additional flows. The city has no objections to TranSystems upsizing Line D to accommodate the storm drain water from the proposed development. It is understood that Duke Construefiun is responsible for TranSystem's engineering costs associated with the upsizing of Line D and for all revisions to the Bethel Road I construction plans related to proposed development. The city will need to review the revisions prior to the plans being finalized. Should you have any questions or need any additional information, please advise. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office: 972/304-3686 Fax: 972/304-7041 E-mail: kgriffin~ci.coppell.tx .us CC: Bruce Barclay, Duke Construction C. Jack Evans, P.E., Pacheco Koch