Loading...
Freeport NIP(8.1)-CS051110 (2)~Charlene I.aMattina - Re: Cost for Duke requested Bethel Improvements Page From' To: Date: Subject: Keith Marvin Barclay, Bruce 11/10/2005 4:22:02 PM Re: Cost for Duke requested Bethel Improvements Bruce, We will reconcile the amount due when we open bids for Bethel Road. Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppell.tx.us >>> "Bruce Barclay" <Bruce. Barolay@dukerealty.com> 11/09/05 4:14 PM >>> Keith, I've analyzed the cost estimate and believe we are on the high side. According to my estimate we are somewhere around $20,000 high if you count the 7% contingency. Therefore what I would like to do is wait until the Bethel Road project is bid out and pay you for the actual costs of these additions. Let me know if you have any questions or would like to discuss. Thanks, Bruce S. Barclay - Project Manager Duke Construction Phone: 972-361-6700 Direct: 972-361-6743 Fax: 972-361-6800 Cell: 214-878-3426 www.dukeconstructiononline.com CC: jevans@pkce.com; LaMattina, Chadene October 14, 2005 Bruce S. Barclay Project Manager 5495 Belt Line Rd Suite 360 Dallas, TX 75254 RECEIVED OCT 0.2005 Re: Bethel Road Median Cuts Dear Mr. Barclay: In reference to our meeting last week, Minyard Food Stores, Inc. has no intention of requesting a median cut at our employee parking lot on Bethel Road. If we can be of any further assistance please let us know. Best regards, Minyard Food Stores, Inc. Rc~ Esmte ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST project Name: Freeport XIV & XV Costs Associated wi City Infrastructure PK No.: 2052-05.217 Improvements Prepared By: Pacheco Koch Consulting Engineers (CA J) Date: 1013/2005 Paving Costs Item I Unit Median Openln~s/Decel. Lane 1 405 SY 7' Reinf. Conc. Pavement (3000 psi) $40.0( $19,400.00 2 405 SY 6" Lime Stabilized Base $6.00 $2,910.00 3 6.55 TN Hydrated Lime (6%) $105.00 $687.49 4 300 SF Colored Stamped Concrete $6.00 $1,800.00 Sidewalk Costs 5 5700 SF 4" Concrete Sidewalk (5'Width) $2.00 $15,960.00 6 7 EA Pedestrian Access Ramps $500.00 $3,500.00 Sub-Total $441257.49 Drainage Costs No. Quant. Unit Description Price Total Price 7 103 LF 18" Class III Storm Sewer Pi~e $38.00 $3,914.00 8 55 LF 36" Class III Storm Sewer Pipe $75.00 $4,125.00 9 -55 LF 27" Class III Storm Sewer Pi~e $67.00 ($3,685.00) :: ~ ~ ~ ~ .~_~ ~..'~_"_-~+~ Difference $440.00 10 30~" LF O" Class III Storm Sewer Pipe $68.00 $20,400,00 11 ~ LF ;'4" Class lll Storm Sewer Pipe $45.00 ($13,500,00) ~ ~ ~mea~;;~,~ ~'~A~ ~i~ Difference $61900.00 12 235 LF 27" Class III Storm Sewer Pipe $67.00 $t5,745.00 13 -235 LF Z 1" Class ~tt Storm Sewer Pioe ~ $40.00 ($9,400.00) 14 305 LF 24" Class III Storm Sewer Pipe $45.00 $13,725.00 15 -305 LF 21" Class III Storm Sewer Pipe $40.00 ($12,200.00) Difference $1 r525.00 ~[l~, ~ ~,~ ~'~i ~ .~? ~ ~1 Sub-Total $19.t24.00 The quantities and prices shown hereon are an indication of the Engineer's SUB-TOTAL $63,381.49 opinion of proheble construction costs associated with the referenced 10% Contingency $6r338.15 project and are NOT e guarantee of individual or tetal construction costs. TOTAL $69 71 9 [ Keith Maw. in - RE: Bethel Road/Freeport XIV & XV Storm Tie-ins Page From: "Bruce Barclay" <Bruce. Barclay@dukerealty. com> To: "Bruce Barclay" <Bruce. Barclay@dukerealty.com>, "Kenneth M. Griffin (E-mail)" <kgriffin@ci.coppell.tx.us>, "Garry O. Kraus (E-mail)" <gdkraus@transystems.com>, "Keith Marvin (E-mail)" <kmarvin@ci.coppell.tx.us> Date: 9/30/2005 9:03:12 AM Subject: RE: Bethel Road/Freeport XIV & XV Storm Tie-ins This should have been attached to the previous email. I apologize for any confusion. <<Bethel Road Escrow Letter to Coppel1092905.PDF>> > ..... Original Message ..... > From: Bruce Barclay > Sent: Friday, September 30, 2005 8:46 AM · To: Kenneth M. Griffin (E-mail); Garry D. Kraus (E-mail); Keith Marvin (E-mail) · Cc: Jeff Turner; Jeff Thornton; Teddy Peinado; Chad A. Jackson (E-mail); Jack Evans (E-mail) · Subject: Bethel Road/Freeport XIV & XV Storm Tie-ins · Ken, · Attached you will find a copy of our response to your letter regarding the Storm Sewer Tie-in's at Bethel Road. Also included is a copy of your original letter and the signed proposal from TranSystems. Originals are being Fed X'd to you and TranSystems today. · Per our attached letter, we will determine a dollar amount for these upgrades as soon as TranSystems has completed their revisions. We will then review and come to agreement on the dollar amount and place in escrow with The City of Coppell as requested. · It is now my understanding that we may move forward with the construction of utilities for Freeport XIV & XV once we address any comments your department may have during the review. I spoke with Keith yesterday and I believe your initial review is almost complete and comments should be forwarded shortly. · If you have any questions or wish to discuss this further please call me at my office or on my cell. · Regards, · Bruce S. Barclay - Project Manager > Duke Construction · Phone: 972-361-6700 > Direct: 972-361-6743 · Fax: 972-361-6800 · Cell: 214-878-3426 · www. dukeconstructiononline.com CC: "Jeff Turner" <Jeff. Turner@dukerealty.com>, "Jeff Thornton" <Jeff. Thorntoni~}dukerealty.com>, "Teddy Peinado" <Teddy. Peinado(~dukerealty.com>, "Chad A. Jackson (E-mail)" <cjackson@pkce.com>, "Jack Evans (E-mail)" <jevans@pkce.com> D t ke CONSTRUCTION September 29, 2005 The City of Coppell 255 Parkway Blvd. Coppell, TX 75019 ATTN: Engineering Dept. Re: Bethel Road 1- ST 99-05~Freeport XIV&XV Duke Project No. FPNO14-000 To Whom It May Concern: In response to your letter dated September 21,2005 from Kenneth M. Griffin to Craig Bond of TranSystems (letter attached) Duke Construction, L.P. agrees to pay for engineering and construction costs required for the tie-in of storm sewer from the Freeport XIV & XV site to the future Bethel Road storm drainage system. In addition, Duke agrees to pay for approximately 1,200 linear feet of 5' sidewalk to be constructed by The City of Coppell with the Bethel Road I project. To ensure funding for the above, Duke Construction will place in escrow a dollar amount based upon a scope of work and estimate prepared by Pacheco Koch Consulting Engineers and agreed upon by both parties. This estimate will be prepared upon TranSystems' completion of the Bethel Road ! plan revisions required for the tie-in. If in the event actual construction costs vary from the escrow amount either Duke Construction shall pay the overage amount or be issued a refund check by The City of Coppell for the remaining escrow balance. Should you have any questions regarding this matter, please do not hesitate to call me at the office at (972) 361-6743. Sincerely, Project Manager - Duke Construction Encl: Letter from Kenneth Griffin dated 9-21-05 TranSystems Signed proposal cc: JeffTumer-Duke Realty Corporation Teddy Peinado - Duke Construction, L.P. Chad Jackson - Pacheco Koch Jack Evans - Pacheco Koch File 5495 Belt Line Road Suite 360 Dallas, TX 75254 972.361.6700 www. dukerealty, com Atlanta Chicago Cincinnati Cleveland Columbus Dallas Indianapolis Minneapolis Nashville Orlando Raleigh St. Louis Tampa I 09/~/2005 16:0T FAX 9722809715 TRANS¥$TEM$ DALLAS [~002 M~. Br~ B~lay Duke Constmaion 5495 Belt Li~e Road, Suite 360 Dallas, TX 75~54 Fax: 972,-361-6800 Lettcr Ai~eom~nt fo~ Civil Eagineerlng Bethel Road Plan R~visions Cop~ll, Texas This lett~ details tim sci~i~s T~mlSyste~ns propo~ to perform for Duk~ Construotion in connociion with the Project, ~he pricing at which TranSyatems proposes to perform these se~toes, thc schedule [o~ ~ompleting these ~ervi~es and the assumptions upon which Tran,qystems has based this proposal. If the proposal outlined in this letter is acceptable to Duk~ ~on, TranSyslenm roquests that D,,l~ Construction indicate its acceptance of this propo~ by executin~ this lette~ ~t in ~h~ spare provided below. SCOPE OF SERVICI~ Irt connection with lite above refe~ PlojecL Tr~yatems ~ ~se ~e ~ ~ ~l's ~ ~ ~ S~ ~ ~ue ~ ~ inclu~.~ ~fl~ of ~o ~W ~s, ~ ~a~~ of ~o p~ h~s ~ ~ upsi~ng of ~ ~ ~ Hne m In ~flon ~ the ~y~ ~. ~c foll~S ~M will ~so n~ W ~ ~ocd ~ ~fl~ ~ ~j~t ~t S~t 2 ROW ~tJg~ Sh~ 8 Wat~ & ~w~ S~ , 09/29/2006 16:07 FAX 9722809715 TRAN$¥~i'eaI$ DALLAS 1~1003 · Bo~ Culvert Plan & Profile Sheets $9-61 · SWPPP Shcc~ 67 Traffic ConUo] Plan $ligcts 69, 71, 73, 7~, 77 & 7~ Si~ni~g & Butt~ing Sb~t 80 ~ Lm/clscap~Pla~Sbeets 1t$-114 · Inig~ofl Phm Sh~tm 121-122 CIVIL SBRVICB$ Traesystems will revisc the City of CoPl~II Bethel Road Plans as described abow, We px~po~ to provid~ the afoi~-me~toned services on an hourly b~mis, in accmdancc with r]~ attached rate schedulc, for a fcc not to cxceed llenm not included in th'ese peopo~s are: 1. Relmbammble expenses such ~ mile*~ overnight mail, printing, reproduction and sales tax (these will bc billed at co~t) lnvoicea Wffi be Sent monthly mid will bo based on TrailSystem$' estimate Of the ~ S~ViCes actmdly completed as of the time of billing., TrmSystmns will pe4~,e a project schedule as part of ah. is ~ontract to be mutually agt'c~d, u. pon by boat pmias. Wc tecosniz/your need to have these'Services completed as soon ss po~ibl~ and TmnSystems' will complete ~ services in a timely maanot. Ol~ntiAL PROVISIONS A_mm-bed to end made a pad o~ this Lctler A~reemenl is a copy of Tl~mSyst~ms' Oeneral Provisions. Duke Con~u~on sad TranSyatema uhderstand and agwe that the Oe~cral Pxovisions a~e a part of this L~r A&reement and thai .z~h are bound by terms and conditions ~t fo~h in the Genera] Pro~laiorm, In the o~nt that there is any inoo~sistcucy Or conflict betwoert ~ ~ alld ~ToditibllS sot forth in this Lctt~ A~reemestt and the Oenetal Provisions, the t~mi ired cxmdltiorm set fohh in this letter A&re,~meht shall coatrol. The proposal outlined h~ dds I. Jcl~ is valid Cot 30 days.. 09/29/2006 16:07 FA~ 9722809715 ~T~&N3yST~E5 DALLAS [~1004 Wc simm~ly appr~iste the oplmmmity to work wilh Duke CousUucfiou on tiffs Project. If you co. cur with the pmposel outlined in ~ds ~ of Agreem~t, plsase =xecu~ the enclosed ~tm copy a~d ~ur~ it to TumSys~, Unless ofl~/wisc insmtctcd by Duke Constmctio~ in writing at the Rme you ~t~t~n tim executed copy of this L~ter A~e~t, TmuS~ will cous/der fl~e ~utcd Letter Ag~,e.~ammt ss our notice to' pr~_e;d., please let us lmow if you h~ve sa~y qu~ions or ~ my fu~er information. V~ry truly yOurS,~(~.,~ D~r~. Comtru~ion hereby sccelm the prop~al fiutlin, d.~bovc and does he.by Tx, mSystoms to performthc Services described above, on the tm'ms and cond/tions set forth in the foregoing I.gttcr Agreemeat. Duke Constnmfion: accclm and agze¢$ to the 'terms sad cond/tions of tho fmegoing I.~ter Agregm~nt (including the terms and conditiona set for, h thc Oem~r'al Provisions attached hereto.) Date: ~ ~_~_~~ *09/29/2005 18:07 FAZ 9722809715 TRANSY~FEMS DA. LLA$ TranSystems Corporation Consultants 3010 LBJ Freeway. Suite 990 Dallas. Texas 75234 ' (972) 280-9300. (So.dale ofRomiy l~ -- of .~.7 [, 200S) 'C~,v 14..Maa Clmv ' tn $ 210.00 .$ 140.00 $ 120.00 $ 105.00 $ * 85.00 S .150,00 $ 12~.00 $ '80.00 ,$ S , 65.00 · $ 11~.00 $ · S 70.00 $ 60.00. 'S ~0.00 · $ . 100.00 , $ , 75.00 $ 55.00 $ 45.00 · $ 160.00 $ 175,00 · S j 140.O0 $ .,100.oo ' $ $~.00 $ . 80,00 · $ 65,00 · $ 55.00 · $ 70.00 . $ :ss.O0 $ :S0.00 . $ 45.00 , $ 35.00 md~ otl~or dt~sc~j,ob expea~, tob~ paid at cost. Vd~lo ~00§ · 09/29/2006 16:07 F~,T 9722809715 ']IL~4$YST'i~JS DALi,.A.$ [~006 GENERAL PROVISIONS ~ECTION 4:PAYMI~N"r5 ~ TRAN~¥~IIpilit reoMpt og ~EM9' etdemmmt theMur. 'll~mJdSYu ] uM~ ehdt be ~ed iniam~ (m 1he unpak{ Irnuunte due TF~ (7) dlp/i wdlien no#oe to CLIENT, ~ul{mend MNvk~ undM ~1l~ ~4aml~ant unto ii~uv~ i ~v~u nae uemm pea ~n nm ~ emounm uue rot · 09/~9/2005 16:08 FAT 9722809715 TI~A~YS'J~II$ DAI.I.&$ ~]007 malmudaneunwn~oramllck~lnlheeemeloeelltyurdmalmgm'oonclllona- ExaePtee. ,mqWee~/~mmemmz°?': ... -- end no w. nn.tv or ¼ kmlum~l In ~ Agreement, o~ In ~ .d?un~e~__..,__.dmwmg,_~. ~_~, ..u~/._, ~ · · --'--~-'"- ........ "----"""~ "'"''~t tO 11111 Anmm',mnt_ i TRAN~YST~M5 m&xe~ 11o IN reeiXXleil~al~ and remo~loe with rg~g~t to the ~lrdcea, whelller In ,--,,,;,'aol ~' °theh~la~elmll be ex°IUelwlY tl~ exp~ ~ thl! ,Ag~anlenL : TRANSYSTBM;9 DALI,AS SE~IION 6: ~lg'~lA{. pROVI~OI~I~ a~ may only be amend.d, lupplm~nmd, mocmao, or ~ uY a Ou~ m~.~ wn~ ~'u'm""' 1~1008 Imr pemo~ ~ be ~4mto !. I Suzan .T_~ylor - Bethel Road Page 1 1 From: Suzan Taylor To: jevans@pkce.com Date: 9/26/2005 4:29:22 PM Subject: Bethel Road Jack: During our meeting with Duke and TranSystems we discussed the upsizing of Line D and the changes to the plans associated with that. In a previous meeting with Brook Barefoot, he indicated that Duke wanted median cuts and the drives added to the plans as well. TranSystems is unaware of any changes other than upsizing the line. Do you know if Duke wants the median cuts and drives added to the plans - is that something they are going to work with TranSystems on? Thanks I Suzan T{aylor - RE: Bethel Road Storm Coordination with Freeport Project Page 1 J From: To: Date: Subject: Craig, "Bruce Bamlay" <Bruce. Barclay@dukerealty.com> "Bruce Barclay" <Bruce. Barclay@dukerealty.com>, <ccbond@transystems.com> 9/26/2005 1:06:07 PM RE: Bethel Road Storm Coordination with Freeport Project As you are already probably aware, the city has given us the go ahead for the storm tie-ins at Bethel. Please let me know cost and how soon you can have the plans revised for submission to the City. I'm hoping we can get this revised quickly in order to avoid any delays in receiving plan approval from the Engineering Dept. Please call me if you would like to discuss. Regards, Bruce S. Barclay - Project Manager Duke Construction Phone: 972-361-6700 Direct: 972-361-6743 Fax: 972-361-6800 Cell: 214-878-3426 www.dukeconstructiononline.com ..... Original Message ..... From: Bruce Barclay Sent: Monday, September 19, 2005 9:50 AM To: 'ccbond@transystems.com' Cc: kgriffin@ci.coppell.tx.us; staylor@ci.coppell.tx.us; gdkraus@transystems.com; Chad A. Jackson (E-mail); Jack Evans (E-mail) Subject: RE: Bethel Road Storm Coordination with Freeport Project Craig, Thanks for the update. We will wait for your response. BB ..... Original Message ..... From: ccbond@transystems.com [mailto:ccbond@transystems.com] Sent: Monday, September 19, 2005 9:38 AM To: Bruce Barclay Cc: kgriffin@ci.coppell.tx.us; staylor@ci.coppell.tx.us; gdkraus@transystems.com Subject: RE: Bethel Road Storm Coordination with Freeport Project Bruce, We prepared and sent a letter to the City last week summarizing the drainage conditions (once the Bethel Road drainage improvements are installed), and how your request would impact those conditions. We wanted to hear back from the City before we proceeded with any changes Page 2 I ISuzan Taylor - RE: Bethel Road Storm Coordination with Freeport Project to the plans. I spoke with Suzan Taylor this morning and she is going to touch base with Ken and prepare a response indicating how the City would like us to proceed. I11 follow-up with you once I get their response. Thanks. Craig Bond ..... Original Message ..... From: Bruce Bamlay [mailto:Bruce. Barclay@dukerealty.com] Sent: Monday, September 19, 2005 7:41 AM To: Bruce Bamlay; DL-Charles Bond; DL-Garry Kraus Cc: Jack Evans (E-mail); Chad A. Jackson (E-mail) Subject: RE: Bethel Road Storm Coordination with Freeport Project Craig, We never heard from you last week regarding the Bethel Road storm tie-in. Please let us know something ASAP. We will begin utility installation shortly and need your blessing on the design. We have researched this on our end and there shouldn't be any issues but we must have your input before proceeding. We truly appreciate your help with this. If you have any questions or would like to discuss please call me at the office or on my cell. Regards, Bruce S. Barclay - Project Manager Duke Construction Phone: 972-361-6700 Direct: 972-361-6743 Fax: 972-361-6800 Cell: 214-878-3426 www.dukerealty.com <<Bruce Barclay.vcf>> > ..... Original Message ..... > From: Bruce Barclay > Sent: Monday, September 12, 2005 9:27 AM > To: 'ccbond@transystems.com'; 'gdkraus@transystems.com' > Cc: Jack Evans (E-mail); Chad A. Jackson (E-mail) > Subject: Bethel Road Storm Coordination with Freeport Project > > Good morning gentlemen, > I just wanted to send an email with my contact information and touch base. > I look forward to hearing from you in a couple of days regarding our storm tie-in. > Your help with this is greatly appreciated, > > Bruce S. Barclay - Project Manager > Duke Construction > Phone: 972-361-6700 > Direct: 972-361-6743 ISuzan Taylor - RE: Bethel Road Storm Coordination with Freeport Project Page 3 ] · Fax: 972-361-6800 · Cell: 214-878-3426 · www.dukerealty.com · << File: Bruce Barclay.vcf >> CC: <kgriffin@ci.coppell.tx. us>, <staylor@ci.coppell.tx.us>, <gdkraus@transystems.com>, "Chad A. Jackson (E-mail)" <cjackson@pkce.com>, "Jack Evans (E-mail)" <jevans@pkce.com> T H · * C I T Y 0 F COP?-ELL September 21, 2005 Mr. Craig Bond, P.E. TransSystems Corporation 3010 LBJ Freeway, Suite 990 Dallas, Texas 75234 Bethel Road I ST 99-05 Pacheeo Koch / Duke Construction Drainage Request Dear Mr. Bond: The city has reviewed your letter dated September 13, 2005 regarding Duke Constraction's request to discharge storm water from the parking lot of two proposed buildings into the currently designed drainage system for Bethel Road. Your findings indicate that the proposed storm water discharge can be accommodated through the upsizing of Line D and that the 25-year capacity of the four 10' x 5' box culverts is sufficient to handle the additional flows. The city has no objections to TranSystems upsizing Line D to accommodate the storm drain water fxom the proposed development. It is understood that Duke Construction is responsible for TranSystem's engineering costs associated with the upsizing of Line D and for all revisions to the Bethel Road I construction plans related to proposed development. The city will need to review the revisions prior to the plans being finalized. Should you have any questions or need any additional information, please advise. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office: 972/304-3686 Fax: 972/304-7041 E-mall: kgritTm~ci.coppell.tx.us Bruce Barclay, Duke Construction C. Jack Evans, P.E., Pacheeo Koch