Loading...
Ballet TX-CS051201co?PELL December 1, 2005 Ken Head Head Construction Inc. 3030 LBJ Frwy, Ste 700 Dallas, TX 75234 RE: Ballet Academy of Texas/Lot 1, Block A Final Acceptance Dear Mr. Head: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sincerely, Larry Davis Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 Keith R. Marvin, P.E. Assistant City Engineer CC: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Interim Fire Chief Charlene LaMattina, E.I.T.